• 제목/요약/키워드: construction defect dispute

검색결과 31건 처리시간 0.022초

공동주택 하자감정서의 구성체계 분석 (Analysis on the Structure of Defect Consulting Report in Apartment Building)

  • 박준모;서덕석;김옥규;박길범
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.166-167
    • /
    • 2013
  • There has been a defect dispute of apartment building in Korea. The defect dispute is complicated by main issues and details of dispute. It is yet to be solved. Meanwhile, a judge does not a inspection and analysis, but, related field expert who contracted professional engineer does. As a result, defect consulting report that an important judgment is used in a defect dispute. Therefore, this study does research on structure of defect consulting report. A defect consulting report has same items, irrespective of a defect consultant as a result that check 7 indexes about 10 cases. It has different structure's details depending on each defect consultants. And, it inserts new detail or deletes existing detail, does not show clear distinction.

  • PDF

공동주택 층간 이음부 균열 보수공법에 대한 하자분쟁 분석 (An Analysis of Defect Dispute about Inter-Layer Crack Repair Method on Apartment Houses)

  • 이태형;정용기;최병주;김옥규
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2017년도 춘계 학술논문 발표대회
    • /
    • pp.146-147
    • /
    • 2017
  • Recently, as the living standards of residents in apartment houses continued to improve, the dispute of post management have also increased. one of the Issue, Concrete Cracks comprised high percentage of dispute. Especially, between criteria the cost of repairing defect and the judgement of defect isn't clear, they are a lot of dispute in this regard. Even though lots of the criteria about Inter-layer crack is existed by judging defects, In a court, they are judging their own criteria about Inter-layer crack. The purpose of this study is to compare and analyze Defect Judement Standard both MOLIT and Court, and to provide the Improvement for Defect Judgement and Repair Method of Inter-layer concrete crack.

  • PDF

공동주택 욕실 벽타일 뒤채움과 하자발생량의 상관관계분석 (Correlation between Board Mortar and Defect Occurrence Rate in Apartment Bathroom Wall Tile)

  • 홍기;남동희;구교진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 가을학술발표대회논문집
    • /
    • pp.55-56
    • /
    • 2023
  • The number of defect disputes occurring in apartment houses is increasing year by year, and among them, disputes caused by defects in tiles account for 28.2% of the total, which is an important defect in tiles. A representative tile defect in the defect dispute is the lack of tile backfill. Another dispute occurred that the standards for each organization are different as the 100% standard of the Ministry of Land, Infrastructure and Transport's building construction standard and 80% standard of the Architectural Institute of Korea's Building Technology Guidelines. In this study, it was analyzed the relationship between the amount of tile backfill and the amount of tile defects based on 100 defect litigation court appraisal documents. It was observed that the amount of defect in tile works tended to decrease as the amount of tile backfill increased. By presenting an appropriate amount of mortar to fill behind tiles in a defect dispute, the effect of reducing the defect dispute can be expected.

  • PDF

공동주택 하자보증금 청구소송에 의한 하자담보책임기간 연구 (A Study on the Term of Warranty Liability by the Law-suit Requesting of the Guarantee against Defects in the Apartment Building)

  • 구해식
    • KIEAE Journal
    • /
    • 제12권3호
    • /
    • pp.11-18
    • /
    • 2012
  • The purpose of this study is to contribute to solution of the defect dispute in apartment house in advance. We want to propose the improved devices in defect problems by investigating the money that exacted from the practical business of the inspection company and the money that a judge gave a decision in a civil court in 50 cases of the lawsuit to requesting the guarantee against defects and the improved schemes of the applied rate by analyzing the diagnosis money of each applied years about the term of warranty liability in 40 cases of the lawsuit separately from that. As the result, we have to reflect the defect of non construction and error construction on apartment building defects, which recognizes very important factor when we compute the defect repair warranty money and it needs to be rearranged the applied ratio in guarantee peried of housing law practically.

공동주택 하자소송에서의 조경하자유형 사례분석 (Case Study on Landscape Defect Type of Defect Lawsuit in Apartment Building)

  • 박준모;서덕석
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.263-264
    • /
    • 2016
  • Since 2000s in Korea, apartment building tended to become goods or assets rather than houses. Therefore, conflicts between supplier and consumer were aggravated, and the defect dispute has been increased rapidly. This dispute enlarges to defect lawsuit and it is social and economical matter. The landscape work in apartment building is main work for a resident that appearance and convenient facility which lawn, tree, fountain, chair, playground, and etc. A number of defects surround landscape work are important issue in defect lawsuit, but, a related research is a minority, and a regulation is incomplete. Therefore, this study is basic study for standard of landscape defect type. As case study on defect lawsuit, draw a landscape defect type in apartment building.

  • PDF

Analysis of Consulting Reports on Defect Disputes in Apartment Building

  • Seo, Deok-Seok;Park, Jun-Mo
    • 한국건축시공학회지
    • /
    • 제13권5호
    • /
    • pp.498-505
    • /
    • 2013
  • The main processes involved in a defect dispute are consulting, reviewing, and finally judging as an arbiter. This process of defect consulting produces a defect consulting report, but business practices and standards of judgment will differ among consultants, and have many problems. This study reviews the structure of a defect consulting report and considers the structure's problem, which is that it is not standardized. To achieve this, data of sixteen defect consulting report were collected involving defect lawsuit cases before or after 2010. The structure and index of the defect consulting reports were then reviewed, and the results are as follows. As for a structure based on fourteen index, there are suitable that judge a outline, a cost estimate data and a consulting work item by a consulting standard. Furthermore, analysis by each common parts and private parts is considered as appropriate about consulting items and estimate by standard. However, consulting item in construction progress and responsibility period for security that related on a cause and a responsibility of defect need to complement. Meanwhile, the first thing of issues are connected a defect consulting is urgent a standardization for a defect type.

공동주택 하자감정을 위한 하자조사단계의 현장조사 업무 모델링 (Field Investigation Work Modeling on Defect Inspecting Step of Defect Consulting in Apartment Building of Korea)

  • 박준모;서덕석
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 추계 학술논문 발표대회
    • /
    • pp.87-88
    • /
    • 2015
  • A defect dispute surrounding an apartment building is in constant trouble, a defect consulting is necessary that objective and impartial for solving a defect. The defect dispute about a defect lawsuit is conducted in the order that filling of lawsuit, consulting order, defect inspecting, estimating a repairing cost, writing a consulting report, submitting a consulting report, and decision by court. Of these, a step of defect inspecting is extensively investigated an occurred defect that each defect index and type from each part and place. At this time, it is collected of many data and created many information. For this, it need to organize and manage. The study is a modeling of field investigation work process that second phase of defect inspecting step. A literature study is defined a work until level 2. This study is defined the work until level 3 to 4. In addition, the modeling can do for using a job name, a place to job, a job to do, and a person concerned about defect consulting case. The modeling is expected a contribution of improving a defect consulting process and systematizing a judgment standard.

  • PDF

사용자 중심의 스마트 하자정보관리 시스템 개발을 위한 SWOT 분석 (SWOT Analysis on development to User-Oriented Smart Information Management System of defect in Apartment Building)

  • 김법수;박준모;김옥규;서덕석;최정현
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 추계 학술논문 발표대회
    • /
    • pp.5-6
    • /
    • 2011
  • Defect dispute has been a continuous claim that concerning a apartment building. However, objective standard of judgment is inadequate to solve defect dispute. Furthermore, it need to scientific evidence that composited standard of judgment. This evidence has a necessary to collect a data for a long time and systematically analyze. Therefore, it need to develop smart information management system, in this study, it review user-oriented condition as swot analysis.

  • PDF

비용항목의 희귀분석을 통한 공동주택 하자분쟁의 비용특성연구 (Regression Analysis on the Dispute Cost Property in Apartment Housing Claims)

  • 강유미;김법수;박준모;최정현;서덕석;김옥규
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2010년도 춘계 학술논문 발표대회 1부
    • /
    • pp.225-228
    • /
    • 2010
  • It is an social issue that is various claim related on the defect of apartment house. The cost of defect repair is the most important matter that residents dispute constructers with the huge time wasting and cost loss. For resolve the matter of defect claim, it must to be analyze to the cost property that study and find to pending issue about the cost of defect repair. Therefore this study is investigated the cost property of defect repair relation on correlation analysis and regression analysis around the judgement cost. Consequently, cost of the judgment is associated with cost of the accusation and cost of the defect repair, is recognizable as them that is closely connected. Meanwhile, the more time of take effect and time of lawsuit increase, the more cost of the judgment decrease by draw the regression equation. On the contrary, there are same aspects in the case on the cost of the accusation and cost of the defect repair.

  • PDF

공동주택 층간이음부의 문제점 분석 및 개선안 (Analysis of Problems and Improvement of Inter-layer Joints in Apartment Houses)

  • 방홍순;김옥규
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 가을 학술논문 발표대회
    • /
    • pp.200-201
    • /
    • 2021
  • According to the dispute cases filed for claiming the collective defect repair fees, inter-layer concrete joints turned out to be the most frequently disputed item. For this reason, this study selects the inter-layer concrete joints to further analyze the primary causes and details of each dispute case. From the results of this study, three primary causes of the disputes are found, which are 1) the absence of standard specifications for construction quality control and management after construction; 2) the absence of established standards for repair when construction defects are found. In order to prevent construction defects in inter-layer concrete joints, this study provides three suggestions including 1) the current standard specifications for inter-layer concrete joints should be further specified by the Ministry of Land, Infrastructure and Transport; 2) a construction defect should be judged according to the compliance to the standard specifications; and 3) a clear and institutional protocol needs to be established for defect repair in cases that new public apartment houses have been judged to have defects.

  • PDF