Analysis of Defect Repair Cost by Work Type based on Defect Inspection of Apartments (공동주택의 하자진단에 기초한 공종별 하자보수비용의 분석)

  • Lee, Jin-Eung;Kim, Byung-Yun;Jeong, Byung-Joo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.5
    • /
    • pp.491-500
    • /
    • 2015
  • This study investigated defect status by work type, based on the report data of defect inspection results, acquired by consumers' request to safety inspection agencies, before the expiration of legal defect repair warranty period. In fact, the data was not acquired by centering on suppliers, namely, construction companies in relation with the defects becoming causes to increase construction cost of apartments. This study aims to provide objective and basic data for quality improvement at construction stage and for solution to defect disputes. The study results are presented below: (1) The number of defect cases occurring from architectural work among total work types were 1,986, defect occurrence rate was 62.5%, and defect repair cost was KRW $25,851/m^2$, which stood at 78.2% of the total work types. This means the defect occurrence rate and defect repair cost in architectural work are bigger than those of other work types. (2) Major defects in architectural work were revealed in the following order: cracks from frame work, inferior interior finishing work, inferior finishing work of plaster/masonry works, water leak/damage from waterproof work and withering/omission from landscape work. The total repair cost of the major selected defects was KRW $12,220/m^2$, and was analyzed to take up 37% of the total defect repair cost.

Comparative Review on Term of Warranty Liability of Reinforced Concrete Work through Occurred Defect Data Analysis in Apartment Building (공동주택 하자실적자료 분석을 통한 철근콘크리트 공사의 하자담보책임기간 비교연구)

  • Seo, Deok-Seok;Park, Jun-Mo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.266-267
    • /
    • 2017
  • As apartment buildings defect lawsuits become socioeconomic problems, an objective basis system for the term of warranty liability of reinforced concrete constructions is urgent. This study was carried out as a basic study for developing a basis system for the term of warranty liability. To do this, defect data actual collected in apartment complexes were collected and analyzed. As the result of checking the cumulative rate of defect occurrence in reinforced concrete construction by year, the point of time of reaching the 90% level was the 5th years, which was similar with the provision of the Apartment Building Management Act. However, the current Supreme Court precedent has decided that the term of warranty liability for the main structural parts in reinforced concrete construction shall be 10 years and the dispute is expected to continue in the future in the defect lawsuit.

  • PDF

A Study on the Term of Warranty Liability by the Law-suit Requesting of the Guarantee against Defects in the Apartment Building (공동주택 하자보증금 청구소송에 의한 하자담보책임기간 연구)

  • Koo, Hae-Shik
    • KIEAE Journal
    • /
    • v.12 no.3
    • /
    • pp.11-18
    • /
    • 2012
  • The purpose of this study is to contribute to solution of the defect dispute in apartment house in advance. We want to propose the improved devices in defect problems by investigating the money that exacted from the practical business of the inspection company and the money that a judge gave a decision in a civil court in 50 cases of the lawsuit to requesting the guarantee against defects and the improved schemes of the applied rate by analyzing the diagnosis money of each applied years about the term of warranty liability in 40 cases of the lawsuit separately from that. As the result, we have to reflect the defect of non construction and error construction on apartment building defects, which recognizes very important factor when we compute the defect repair warranty money and it needs to be rearranged the applied ratio in guarantee peried of housing law practically.

Analysis of Consulting Reports on Defect Disputes in Apartment Building

  • Seo, Deok-Seok;Park, Jun-Mo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.5
    • /
    • pp.498-505
    • /
    • 2013
  • The main processes involved in a defect dispute are consulting, reviewing, and finally judging as an arbiter. This process of defect consulting produces a defect consulting report, but business practices and standards of judgment will differ among consultants, and have many problems. This study reviews the structure of a defect consulting report and considers the structure's problem, which is that it is not standardized. To achieve this, data of sixteen defect consulting report were collected involving defect lawsuit cases before or after 2010. The structure and index of the defect consulting reports were then reviewed, and the results are as follows. As for a structure based on fourteen index, there are suitable that judge a outline, a cost estimate data and a consulting work item by a consulting standard. Furthermore, analysis by each common parts and private parts is considered as appropriate about consulting items and estimate by standard. However, consulting item in construction progress and responsibility period for security that related on a cause and a responsibility of defect need to complement. Meanwhile, the first thing of issues are connected a defect consulting is urgent a standardization for a defect type.

A Study on the Completion procedure of Defect Repair for Apartment Housing (공동주택의 하자보수 종료 절차에 관한 연구)

  • Jun Woo-Taek;Nam Gyoung-Woo;Koo Kyo-Jin;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.283-286
    • /
    • 2002
  • Defect problems happening in the course of stressing quantity expansion of residence supply due to lark in maintenance are intensifying insincerity of construction business resulting from the psychological and economic damage, and there are many quarrel between residence suppliers and consumers. Because an apartment house's qualify is decided by various elements from design, to lotting-out, construction, and after-management, it is limited to express house capacity and standard to appraise defect objectively and quantifiably. The bound of defect and the period of guarantee expressed cleary in regulation of apartment house lack in quantifiable concept, and guarantee of defect is composed of a general concept. Therefore the big difference in opinion about defect and the bound of repair makes repair process slow and only to increase social costs. This research will give residence suppliers and consumers a resonable way to solve repair process during tile obliged period of guarantee since moving into from a process which are design, planing, construction, and after management. Furthermore it will present each business and role to conclude defect repair easily, so I planed to promote maintenance after conclusion of defect repair.

  • PDF

A Study on the Newly Recognized Defect Factors in Defect Lawsuits of Apartment Housing (공동주택 하자소송단계에서의 하자인정항목에 관한 연구)

  • Ko, Young-Tae;Shin, Yoon-Seok;Lee, Myungdo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.6
    • /
    • pp.567-576
    • /
    • 2020
  • This study proposes additional items to be recognized as defects in a defect lawsuit through a case analysis of lawsuit cases in apartment housing. Identifying these defects prevents an unexpected increase in litigation costs, delays in the date of litigation, and emotion repercussions or additional lawsuits. In this study, the defects that were not discovered by the existing occupants and construction companies, but were newly discovered in litigation, were defined as defects in lawsuits. Fifteen cases of lawsuits were analyzed and a total of 77 defects were derived. Each item was then reviewed for location, work type, number of occurrences, and cost. The results were yielded 23 defect items, which were validated by appraisers who directly appraised the cases. In addition, the derived defect factors were analyzed. Finally, the 23 defect items were categorized into 10 main factors which include attributes such as causes of occurrence and characteristics. This can provide an overall area of defects to be considered in addition to existing defect items in the life cycle of the housing. The results of this study can contribute to reducing the actual occurrence of defects and minimizing the disputes in the case of defect lawsuits.

The Effective Process of Apartment Housing Defect Management Using Smart Device (스마트 기기를 활용한 공동주택 하자 관리의 효율화 방안)

  • Suh, Jung-Il;Lee, Jae-Woong;Lee, Jeong-Ho;Kim, Young-Suk
    • Journal of KIBIM
    • /
    • v.2 no.2
    • /
    • pp.27-36
    • /
    • 2012
  • Recently, apartment housing tends to increase 3-4% every year by economic growth and development of construction technology in domestic construction industry. According to this tendency, construction enterprises are providing high-quality and various residential space, and residents also want high-quality apartment housing without any defect. Construction company make efforts to decrease construction defects in order to satisfy all the residents, and to improve company value. However, it is impossible to have no defect in construction because construction works are combination of many different complicated process. Because of the responsibility for the defect, conflicts between construction company and residents have been occurred. This study suggests defects management method that can be used from defect register phase to defect repair phase with a function of smart-device of the high penetration rate. The effectiveness use of the suggested method might save defects maintenance time and improve resident satisfaction about construction quality.

Improvement Plan on Appraisal System of Defect Disputes about Cracks on Apartment Buildings (공동주택 하자소송 균열쟁점을 통한 전문감정인 제도 개선방안)

  • Kim, Beop-Su;Park, Jun-Mo;Kim, Ok-Kyue;Seo, Deok-Suk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.185-186
    • /
    • 2011
  • The latest domestic construction sector is receiving economic damage because of defect litigation. The Concrete Crack among them has the largest component in expense of apartment house defect. Also, contradictory suggestion of appraiser is problem. To improve these problem, need objective plan that people concerned can recognize about decision sequence. Therefore, in this study, compared general defect investigation and defect decision of appraiser taking advantage of Data Dictionary analysis method. Also, deduced current problem and amelioration plan.

  • PDF

Correlation between Board Mortar and Defect Occurrence Rate in Apartment Bathroom Wall Tile (공동주택 욕실 벽타일 뒤채움과 하자발생량의 상관관계분석)

  • Hong, Ki;Nam, Dong-Hee;Koo, Kyo-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.55-56
    • /
    • 2023
  • The number of defect disputes occurring in apartment houses is increasing year by year, and among them, disputes caused by defects in tiles account for 28.2% of the total, which is an important defect in tiles. A representative tile defect in the defect dispute is the lack of tile backfill. Another dispute occurred that the standards for each organization are different as the 100% standard of the Ministry of Land, Infrastructure and Transport's building construction standard and 80% standard of the Architectural Institute of Korea's Building Technology Guidelines. In this study, it was analyzed the relationship between the amount of tile backfill and the amount of tile defects based on 100 defect litigation court appraisal documents. It was observed that the amount of defect in tile works tended to decrease as the amount of tile backfill increased. By presenting an appropriate amount of mortar to fill behind tiles in a defect dispute, the effect of reducing the defect dispute can be expected.

  • PDF

Analytic study of 4~10 years Defect Deposite Use State based on Actual Data after moving in apartment complex (4~10년차 실적자료에 근거한 공동주택 하자보수 보증금의 사용실태 분석연구)

  • Seo, Deok-Seok;Jeon, Myeong-Soo;Lee, Eun-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.153-154
    • /
    • 2011
  • In Korea, the apartment supplier should satisfy the apartment residents' demand on the defect repair found in apartment housing by the law of Management of Apartment Complexs. But in the cost of defect repair, not only the actual defect repair cost, but also the cost of residents' complains are contained. So in this analytic study, the actual use state of defect deposite during 4~10 years after moving in are analysed base on actual data of 15 apartment complexes. In this study, about 66% of defect repair deposites are used to actual defect repair and only 34% of defect repair cost are spent to satisfy the demand of apartment residents'.

  • PDF