• Title/Summary/Keyword: construction cost estimation

Search Result 495, Processing Time 0.035 seconds

A Study on the Weight Estimation Model of Floating Offshore Structures using the Non-linear Regression Analysis (비선형 회귀 분석을 이용한 부유식 해양 구조물의 중량 추정 모델 연구)

  • Seo, Seong-Ho;Roh, Myung-Il;Shin, Hyunkyoung
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.51 no.6
    • /
    • pp.530-538
    • /
    • 2014
  • The weight estimation of floating offshore structures such as FPSO, TLP, semi-Submersibles, Floating Offshore Wind Turbines etc. in the preliminary design, is one of important measures of both construction cost and basic performance. Through both literature investigation and internet search, the weight data of floating offshore structures such as FPSO and TLP was collected. In this study, the weight estimation model was suggested for FPSO. The weight estimation model using non-linear regression analysis was established by fixing independent variables based on this data and the multiple regression analysis was introduced into the weight estimation model. Its reliability was within 4% of error rate.

A Model of Time Dependent Design Value Engineering and Life Cycle Cost Analysis for Apartment Buildings (공동주택의 시간의존적 설계VE 및 LCC분석 모델)

  • Seo, Kwang-Jun;Choi, Mi-Ra;Shin, Nam-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.133-141
    • /
    • 2005
  • In the resent years, the importance of VE (value engineering) and LCC (life cycle cost) analysis for apartment building construction projects has been fully recognized. Accordingly theoretical models, guidelines, and supporting software systems were developed for the value engineering and life cycle cost analysis for construction management including large building systems. However, the level of consensus on VE and LCC analysis results is still low due to the lack of reliable data on maintenance. This paper presents time dependent LCC model based value analysis method for rational investment decision making and design alternative selection for construction of apartment building. The proposed method incorporates a time dependent LCC model and a performance evaluation technique by fuzzy logic theory to properly handle the uncertainties associated with statistics data and to analyze the value of alternatives more rationally. The presented time dependent VE and LCC analysis procedure were applied to a real world project, and this case study is discussed in the paper. The model and the procedure presented in this study can greatly contribute to design value engineering alternative selection, the estimation of the life cycle cost, and the allocation of budget for apartment building construction projects.

Study for Architectural Standard Details Based On BIM Information Framework (BIM 표준프레임워크 기반의 건축 표준상세도면 구축방안)

  • Kwon, Soon-Ho;Lee, Woon-Jae;Jo, Chan Won
    • Korean Journal of Computational Design and Engineering
    • /
    • v.18 no.2
    • /
    • pp.93-103
    • /
    • 2013
  • In the situation where there should be a gap between the design environments of 2D drawing and 3D BIM modeling, it is unavoidable aspect to face confusion caused by parallel usage of both technologies unless the project delivery systems are entirely upgraded to 3D. Therefore, it is critical to make efforts to minimize this confusion. Meanwhile, detailed drawings have very important roles in the construction process because they do not only concretely express construction methods for a given design plan but also provide basis for quantity takeoff and construction cost estimation etc. This paper suggests a plan to standardize detailed information based on BIM standard framework in order to make BIM realize the information. In the short term, this plan provides improved environment where both BIM and CAD technologies can be applied and, in the long term, it provides bases for BIM to replace CAD technology.

Construction of the reduced system by two-level scheme and time integration in the reduced system under arbitrary loading (2단계 축소기법에 의한 축소시스템의 구성과 동하중에 의한 구조물의 동적 거동에 관한 연구)

  • Kim, Hyun-Gi;Cho, Maeng-Hyo
    • Proceedings of the KSME Conference
    • /
    • 2004.11a
    • /
    • pp.453-458
    • /
    • 2004
  • This study proposes a new two-level condensation scheme for the construction of a reduced system. In the first step, the candidate area is selected for the construction of the reduced system by energy estimation in element-level. In the second step, primary degrees of freedom are selected by sequential elimination from the candidate degrees of freedom linked to the selected elements. Numerical examples demonstrate that the proposed method saves the computational cost effectively and provides a reduced system which predicts the eigenvalues accurately. Moreover, the well-constructed reduced system can present the reliable behavior of the structure under arbitrary dynamic loads comparing to that of global system. Time integration in a reduced system can save the computing time remarkably. Through a few numerical examples, the efficiency and reliability of the proposed scheme are verified.

  • PDF

An Estimation of the Economic Life Expectancy of the Building Service Equipment with LCC Analysis (LCC 분석을 통한 공조설비 내구연한 산정)

  • Kang, Sung-Ju;Kim, Yong-Ki;Lee, Tae-Won
    • Proceedings of the SAREK Conference
    • /
    • 2007.11a
    • /
    • pp.316-321
    • /
    • 2007
  • It is difficult for a superintendent or an operator of building service systems and equipment to decide the reasonable time for management of himself due to the shortage of his specialty for repair or replacement of a part of or whole equipment. But The reliable life expectancies for various building service equipment have not been prepared yet. This study shows the difference of optimal economic life and the decrease of running cost and energy consumption according to management level of the building equipment by the LCC analysis. The numerical model for building HVAC system was composed and analyses were performed for several parameters with management.

  • PDF

A Study on the Safety Prediction of Embankment Using Simple Parameter Estimation Method (물성치 추정을 통한 성토안정성 예측)

  • Park, Jong-Sung;Hong, Chang-Soo;Hwang, Dae-Jin;Seok, Jeong-Woo
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.03a
    • /
    • pp.888-895
    • /
    • 2009
  • Compaction is a process of increasing soil density using physical energy. It is intended to improve the strength and stiffness of soil. In embankment, degree of compaction affects the construction time, money, also method of soil improvement. In large scale embankment project, difficulties of embankment should change due to uncertainty of settlement. So it is very important to predict the final settlement and factor of safety induced by embankment. In many construction site, there are primarily design of high embankment using in-situ soil. Therefore numerical analyses are necessary for valid evaluation of the settlement prediction. But due to the construction cost and schedule, there were lacking in properties of soil and also limited number of in-situ test were performed. So we proposed the method that can easily estimate the proper soil parameters and suggest the proper method of numerical analysis. From this, two-dimensional finite-difference numerical analysis was conducted to investigate the settlement and factor of safety induced by embankment with various case of compaction rate and embankment height.

  • PDF

A Study on the Production of Wood Members and the Estimation of Raw Woods at the Government Managed Building Construction in the Late Chosun Dynasty (조선후기(朝鮮後期) 관영건축공사(官營建築工事)의 목부재(木部材) 생산(生産)과 물양산정(物量算定)에 관한 연구)

  • Lee, Kweon-Yeong
    • Journal of architectural history
    • /
    • v.10 no.1 s.25
    • /
    • pp.25-40
    • /
    • 2001
  • Since the 17th century, the society of Chosun Dynasty belonged to a period of rapid transition in many fields. As the building is a result produced on the basis of a society and economy, the general transition in a society is to be reflected into a process of building construction. Therefore an understanding or estimate of a building can be guaranteed by research of a process of building construction. Economic base factors in its process consist of material, cost, manpower, and operation system, etc. to be committed to the construction. On the premise, this paper is to examine the production of wood members and the calculation of the amount of raw woods in a process of woodwork in the construction of the government managed buildings in the late of Chosun dynasty. Construction reports, job slips, written estimates, and other documents in those days are examined for the study. To classify raw woods according to a standard size was aimed to a material management appropriately to apply each them to building size or its member size. The way to select a list of raw woods applicable to each member size, and to calculate the amount of the demanded wood was much more improved with 'Injungjeon-yeongkweon' in the year 1805 at the turning point than 'Hwaseong-seongyuk' in the year 1796. The improvement of material management brought to overcome a shortage of the amount supplied from forest preserve, and to a rationalization of building construction.

  • PDF

Cost Estimation Model for Introduction to Virtual Power Plants in Korea (국내 가상발전소 도입을 위한 비용 추정 모델)

  • Park, Hye-Yeon;Park, Sang-Yoon;Son, Sung-Yong
    • The Journal of Korea Institute of Information, Electronics, and Communication Technology
    • /
    • v.15 no.2
    • /
    • pp.178-188
    • /
    • 2022
  • The introduction of virtual power plants is actively being discussed to solve the problem of grid acceptability caused by the spread of distributed renewable energy, which is the key to achieving carbon neutrality. However, a new business such as virtual power plants is difficult to secure economic feasibility at the initial stage of introduction because it is common that there is no compensation mechanism. Therefore, appropriate support including subsidy is required at the early stage. But, it is generally difficult to obtain the cost model to determine the subsidy level because of the lack of enough data for the new business model. In this study, a survey of domestic experts on the requirements, appropriate scale, and cost required for the introduction of virtual power plants is conducted. First, resource composition scenarios are designed from the survey results to consider the impact of the resource composition on the cost. Then, the cost estimation model is obtained using the individual cost estimation data for their resource compositions using logistic regression analysis. In the case study, appropriate initial subsidy levels are analyzed and compared for the virtual power plants on the scale of 20-500MW. The results show that mid-to-large resource composition cases show 29-51% lower cost than small-to-large resource composition cases.

A Study on the Estimation of Additional Cost for the Certification of Zero Energy Apartment Buildings (공동주택 제로에너지빌딩 인증을 위한 적정가산비 산정에 관한 연구)

  • Sa, Yong-gi;Haan, Chan Hoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.5
    • /
    • pp.21-30
    • /
    • 2019
  • Environmental and energy issues such as abnormal climate and depletion of fossil fuel due to global warming have emerged as a critical task to threaten human survival. As a result, interest in the Zero Energy Building is increasing as it is an innovative building that can significantly contribute to building energy reduction and greenhouse gas reduction. In the market, however, the added cost of construction is a major stumbling block to the revitalization of the Zero Energy certification. In this study, general private apartment complexes were selected for research, detailed elements for Zero Energy certification were presented based on the construction criteria for eco-friendly houses from the initial design stage, and the cost efficiency analysis of the components for certification were presented. It has been analyzed that only Grade 3 certification can be implemented in apartments due to technical level and physical limitations. Also, after reviewing the cost trend during the lifecycle cost, all expenses can be recovered within 13 years after completion only in the case of grade 5 of the Zero Energy Building. The additional costs proposed in the present study are reflected appropriately in the review of projects for apartments scheduled for order in the future to contribute to the revitalization of the Zero Energy Building certification.

Estimation of Water Production Cost from Seawater Reverse Osmosis (SWRO) Plant in Korea (국내 해수담수화 플랜트 생산수 단가 추정)

  • Hwang, Moon-Hyun;Han, Doseon;Kim, In S.
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.39 no.4
    • /
    • pp.169-179
    • /
    • 2017
  • This study was conducted to supply information that can be utilized as data for desalination plant construction in the future by estimating unit cost of water production in the potential site of Incheon, Daesan, Yeosu, Busan, Ulsan and Sokcho in Korea. The production costs in Sokcho and Ulsan were similar to those of Busan and Yeosu. Those four sites showed better economic range due to low construction cost for intake facility compared to Incheon and Daesan. Although the salinity measured in the above 6 sites did not show perceptible effect on the production cost, the difference of seasonal seawater temperature needs to be considered due to the change of flux in reverse osmosis (RO) membrane. It turned out that the most critical parameters are the amortization in a year by the analysis of life cycle and the capacity of plant. Incheon and Daesan showed the difference of production cost up to 29% at the condition of amortization in 25 year, and up to 22% depending on plant capacity. However, the production cost in this study did not take into account of other indirect costs, therefore, this should be considered as the minimum cost.