• 제목/요약/키워드: construction cost estimate standard

검색결과 70건 처리시간 0.043초

표준품셈 관부설 및 접합공사 품 개정 요인 분석 (Analysis on the Factor of Revision of Pipe Laying Down Material and Connection Work Material)

  • 오재훈;안방율
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 춘계 학술논문 발표대회
    • /
    • pp.302-303
    • /
    • 2018
  • This study analyzed the major revision factors and revision contents for 'Construction-Standard-Production-Rate for Construction Works in 2018. Part 16. Pipe Laying Down and Connection" which was revised by the construction expense estimation standard's middle and long-term plans. The main reasons for the revision was analyzed to be unclear construction scope, limitations in applicable pipe material based on the facility type, labor force mainly composed of ordinary workers, limitations of labor force, and incomplete appropriation standard for the tool rent fee and equipment expenses. Through revision of factors, common items were newly established, organization was revised, the labor force was mainly composed of the technicians, and basis for appropriation of equipment expenses was arranged. In addition, through periodic revision, the appropriation standard for bend and special pipes was set. Consequently, more practical construction cost estimate standard is arranged through revision.

  • PDF

의료시설 철근콘크리트공사에서 생산성과 실투입 노무량의 추이에 관한 분석 (Analysis of Trends in the Labor Productivity and Actual Amount of Labor Input in the Reinforced Concrete Construction of Health Facilities)

  • 정재웅;전상훈;구교진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.103-104
    • /
    • 2015
  • Process management of reinforced concrete construction that many labor quantity and cost is put at a construction site is very important and gives a lot of influence on the subsequent process. Thus, there will be only used as a useful tool for process control by medical facilities and trend analysis of the flow of the process by the amount of labor input and productivity in reinforced concrete construction. productivity by type and quantity, and comparative analysis. In addition, it is necessary to calculate the standard of estimate and real commitment to labor productivity by type and quantity, and comparative analysis.

  • PDF

도로포장 및 유지공사 표준품셈 개정 방법에 대한 연구 (A Study on the Standard of Cost Estimation in the Construction of Pavement and Maintenance)

  • 정대권;태용호;안방률;조윤호
    • 한국도로학회논문집
    • /
    • 제11권1호
    • /
    • pp.85-94
    • /
    • 2009
  • 실적공사비 적산방식은 품셈견적, 실측견적, 단가견적, 및 총액견적 등 매우 다양하다. 표준품셈은 공공기관 및 민간기관의 공사비 책정기준이 되는 자료이다. 본 논문에서는 도로공사에 이용되는 기존 품셈견적의 문제점을 개선하기 위해 현장조사를 실시하고 분석하였으며 그 결과로 각 공종에 대한 실측견적 방법을 통계적 방법을 통해 제시하였다. 또한, 기존 품셈과 실측품셈을 공사단위의 비교를 통해 제안된 품셈이 보다 간단한 견적 작성을 가능하게 하고 보다 현실적인 공사금액을 산출함을 알 수 있었다. 본 연구에서는 보조기층의 Case-Study를 통하여 각 방식별 장단점을 가시적으로 비교해 보았다. 실측품셈으로 적용하였을 경우, 계산과정은 기존품셈의 50%로 축소되었으며 1일 1장비 사용으로 기존의 1일미만 장비 사용에 대한 편차가 보완되었다. 또한 품셈만을 이용하여 공정의 시공내용을 짐작하고 이를 바탕으로 공정계획이나 인력투입계획 등을 수립할 수 있었다.

  • PDF

자연환경복원산업 활성화를 위한 표준품셈 연구 (A Study on the Standard of Estimate for Vitalizing the Natural Environment Restoration Industry)

  • 진기정;구본학
    • 한국환경복원기술학회지
    • /
    • 제16권2호
    • /
    • pp.23-40
    • /
    • 2013
  • The natural environment restoration industry has been newly included in the environment area of engineering technology. Accordingly, the enactment of a standard of estimate for determining the 'Cost plus Fixed Fee' method has become necessary for the implementation and vitalization of natural environment restoration projects. The purpose of this study is to determine the standards for which the prices for engineering projects are calculated with respect to the enactment of an engineering project standard of estimate in the natural environment restoration field. These include the scope of the technological work, standard area, manpower requirements by technical grade that are necessary for carrying out the technological tasks. Relevant laws and regulations, systems and precedent case studies were investigated and analyzed to establish a price calculation standard. The overall results of the analysis were used and applied to questionnaires, public hearings, and expert delphi techniques. The study showed the following results: The scope of the technological work was categorized into 'Biotopes', 'Eco-corridors' and 'Ecological restoration'. The standard area was set up as $1,000m^2$ for 'Biotopes' and $5,000m^2$ for 'Eco-corridors' and 'Ecological restoration'. The manpower requirements by technical grade that are necessary for carrying out the technological tasks were determined. The suitability of the costs, standard area, manpower requirements by technical grade of ordered engineering projects that are determined by applying the standard of estimate for natural environment restoration that may be enacted pursuant to this study may be effectively investigated and analyzed. Moreover, further studies on the calculation of standard prices that can ensure the stability of natural environment restoration projects will be necessary.

시가표준액표를 활용한 건설공사표준품셈 건설기계가격 상시관리 시스템 개발 (An Ordinary Management System for Updating Construction Equipment Prices in the Poom-Saem Based on the Standard Market Price1)

  • 안방률;태용호;김대영;허영기
    • 한국건축시공학회지
    • /
    • 제15권4호
    • /
    • pp.397-404
    • /
    • 2015
  • 국내 공공건설사업의 건설기계경비 손료 선정 시 사용되는 건설기계가격표는 급변하는 현실을 제대로 반영하지 못하고 있다. 본 연구에서는 현실이 반영된 기계경비 산정을 위해 "기계장비 시가표준액표"를 활용하여 표준품셈의 건설기계가격이 지속적으로 제 개정될 수 있는 체계화되고 선진화된 상시관리시스템의 방안을 개발하여 제시하고, 대표적인 장비에 이를 적용하여 건설기계가격의 변화가 정부예산에 미치는 영향을 분석하였다. 본 연구의 결과는 투명하고 공정한 공사비 산정기준을 정립하는 데 도움이 될 것으로 기대한다.

건설폐기물 재활용촉진을 위한 종류별 분류 및 발생원단위 산정 방안 (The method for the classification according to their kinds and the estimation of unit generation rate for promoting recycling of construction and demolition(c&d) debris)

  • 이희선;김동식
    • 한국재난정보학회 논문집
    • /
    • 제4권1호
    • /
    • pp.86-100
    • /
    • 2008
  • It is needed to classify the kinds of construction and demolition(c&d) debris to 6 catagories of waste concrete, waste asphalt concrete, waste wood, scraps, combustible waste and incombustible waste in order to properly do a separate discharge and to estimate unit generation rate in construction site. Also, in this case, the unit treating cost for mixed wastes should be applied with the unit treating cost for combustible waste. The construction standard materials estimation data is used for basic data for estimating unit generation rate. The mixed wastes in this data should be classified to waste wood, combustible waste and incombustible waste, and their ratio is obtained by using the unit generation rate of Asia Pacific Environment and Management Institute and Seoul Metropolitan Development Institute. The waste amounts generated from newly-built construction can be obtained from multiplying the loss rate by the amount of materials used from construction standard estimation data. Also, those from dismantling construction can be obtained by subtracting waste amount generated during newly-built construction from total input amount of materials in newly-built construction. Those in two cases can be used in construction site. It can be used for estimating the amount generated and establishing the treating plan in the case of setting up the policy of waste management and doing the environment impact assessment.

  • PDF

표준품셈 제·개정에 있어 실사현장 선정을 위한 품 변화요인 분석 (An Analysis on the Labor Change Factor for Site Selection in Enactment and/or Revision of Construction Standard Production Unit)

  • 신원상;김용우;이동은;손창백
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 추계 학술논문 발표대회
    • /
    • pp.11-12
    • /
    • 2011
  • The Construction Standard Production Unit(CSPU) has been used for the standard cost estimate in public and private construction projects. However, It is difficult to reflect the various site attributed variation in productivity using existing CSPU. The reason is that a criteria which site should be selection for enactment and/or revision of CSPU is not established. This study aims to provide essential data to be used for analyzing the labor factors in a way to secure efficiency and reliability of CSPU.

  • PDF

건설현장의 실투입 노무량 입력을 위한 디지털펜 시스템 (Digital Pen System for Inputting the Actual Amount of Labor Input at Construction Site)

  • 김대원;김태용;신윤석;김광희
    • 한국건축시공학회지
    • /
    • 제16권2호
    • /
    • pp.133-140
    • /
    • 2016
  • 건설공사에 있어 노무량은 건설공사비 산정을 위한 기준으로 사용되고 있고, 건설산업의 생산성을 파악하는 근거자료로도 활용되고 있다. 하지만 노무량의 기준이라고 하는 표준품셈과 실제투입 노무량과 큰 차이를 보이고 있어 이를 해결할 수 있는 방안이 필요하다. 따라서 본 연구에서는 실제투입 노무량을 좀 더 정확하고 간편하게 입력할 수 있는 시스템을 구축하기 위하여 전통적인 종이와 펜을 이용한 수기방식을 그대로 따르면서 전자문서화에 대한 이중부담이 없는 디지털펜을 이용하는 방안을 제시하고자 한다. 본 연구를 통해 실투입 작업정보를 단순히 저장하는 것뿐만 아니라 웹을 통한 공유 및 활용을 통해서 공사비 산정업무의 생산성 측면에서도 기여할 것으로 사료된다.

시설공사 입찰단가를 활용한 실적단가의 산정 방안에 관한 연구 (A Study on Estimating Method for Actual Unit Cost Based on Bid Prices in Public Construction Projects)

  • 강상혁;박원영;송순호;서종원
    • 한국건설관리학회논문집
    • /
    • 제7권5호
    • /
    • pp.159-166
    • /
    • 2006
  • 우리나라의 공공 건설공사 예정가격 산정 근거로 사용되어 온 표준품셈은 다양한 시공환경, 공법, 기술수준 등에 따른 공사비의 변동을 현실적으로 반영하지 못하여 부실시공이나 과다비용의 산정과 같은 문제점이 대두되었다. 이에 정부는 표준품셈을 2004년부터 점차 축소하는 대신 실적공사비 제도를 단계적으로 도입키로 했다. 본 논문에서는 과거 낙찰되었던 계약단가 뿐 아니라 모든 입찰단가 자료를 활용하여 실적단가를 산출하기 위한 일련의 절차 및 방법론을 제시하였다. 본 절차에서 주요하게 다룬 사항은 신뢰성 있는 데이터 확보를 위해 저가입찰 등과 같은 전략적 입찰단가 추출에 대한 분석기준이다. 과거의 입찰단가 자료의 기술통계 결과를 바탕으로 두 차례에 걸쳐 전략적 입찰단가로 의심되는 통계적 이상치를 제거하고, 시간에 따른 보정을 통해 현가화하여 현재 활용가능한 실적단가를 산출하였다. 또한 입찰방식 및 예상낙찰률에 따른 입찰단가의 변동특성을 분석 악하여 실적단가 보정을 위한 기초연구를 수행하였다. 제안된 일련의 분석 및 산출 과정을 거쳐 현실성 있고, 시장성을 보다 충분히 반영할 수 있는 합리적인 예정가격의 산정이 가능할 것으로 사료된다.

Spatiotemporal Visualization of Unit Price Data of Highway Projects

  • Jain, Deepanshi;Shrestha, K. Joseph;Jeong, H. David
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.77-81
    • /
    • 2015
  • The unit price contracting is the standard contracting method for highway projects in the U.S. As a result, state highway agencies have collected a large amount of historical bid data that they can use to determine engineer's estimates for future projects. The estimator must carefully consider various characteristics of a new project such as its location to determine an engineer's estimate as accurate as possible before bid letting. Higher cost estimates can result in the loss of the available budget and lower cost estimates may lead to deferral and delay of projects. The study uses the historical bid data obtained from Iowa Department of Transportation and develops a Geographic Information System (GIS) tool to visually show the variation of unit prices over the map using a spatial interpolation technique. The interpolation map can be used to estimate the unit price of the item at any location across Iowa. This noble method allows the estimator to effectively and fully utilize the historical bid data in a very time efficient manner and determine more accurate cost estimation.

  • PDF