Although pile driver overturning accidents at construction site are not frequent, most leads to serious disasters. The main cause of accidents is uneven settlement of the ground. To prevent this, related guidelines such as KOSHA-C-101-2014, KOSH-A-GUIDE-71-2012, Occupational Safety and Health Standards, and NCS stipulate the installation of steel plates over ground. However, since the required steel plate thickness considering the self-weight of pile drivers and the underlying ground condition is not quantitatively presented, it is randomly applied in the field. In this study, the required minimum steel plate thickness was analyzed based on a numerical analysis (Plaxis 2D). Settlements and soil failure were calculated according to the different type of soils (sand, clay), load distribution and steel plate thickness (10mm, 20mm, 30mm, 40mm). Under all conditions, 10mm steel plate causes soil collapse. From thickness 20mm, the ground uneven subsidence is within 2° of the allowable leader angle.
In this study, we analyze the current status of major disasters in distribution works and propose safety measures through the distribution live-line work method and electric shock risk assessment. The result of analyzing the ratio of electric shocks to the occurrence of industrial accidents in the recent 13 years shows that the death rate is higher than other industries, especially the construction industry occupying most of the disaster, and it is higher than the collapse disaster. We analyze statistic data of 101 victims selected as core words of live work, distribution line, pole and 22.9 kV in the investigation report of major accident of electric shock fatal from 2001 to 2014. The safety measure was established through the risk assessment of the distribution method using the standard model of the risk assessment based on the results of electric shock analysis on the distribution line. In order to prevent the electric shock accident which is recently being discussed, the risk assessment procedure were carried out in the above-mentioned 22.9kV special high voltage live-line operation method. We derived the risk reduction plan for the distribution line from the results of the major accidents statistic and demonstration of the line works.
As the prefabricated shoring system structure, which is a temporary structure, is often collapsed due to various reasons during concrete pouring, and directly affects not only the safety of the workers but also the quality of the final building, it is necessary to ensure the safety. It is considered that the pipe supports which are widely used as the prefabricated shoring materials in the construction site do not satisfy the performance criteria in many cases. Therefore, this study investigated the detailed conditions for satisfying the performance criteria and suggested the factors for improving the quality control level in order to prevent collapse accidents due to pipe supports reused at the construction site, As the results of test in order to understand the effect of the pipe supports (V2), which are being reused in the field, on the performance by factor, the performance was evaluated to be high in case of the small female screw clearance and the supporting pin with 12mm in diameter or larger.
Kang, Sung Won;Lee, Jun Heon;Park, Se Hwan;Kang, Ha Ram;Lee, Ki Seok;Kim, Baek-Joong;Shin, Yoon-Seok
Journal of the Korea Academia-Industrial cooperation Society
/
v.22
no.2
/
pp.179-187
/
2021
In the past five years, form construction, which accounts for approximately 25% of the total construction period, has continued to occur without a significant decrease in the number of deaths, with the largest proportion of collapse accidents. Accordingly, this study analyzed the difference in perception between the manager and worker by a questionnaire survey on the degree of risk and safety management level regarding a mold collapse accident. The survey was conducted in three groups: safety manager, field worker, and field manager. The results of the survey were analyzed by an independent sample T-Test using the SPSS program. As a result, there was almost no difference in recognition between managers, but a significant difference in recognition between managers and workers. In addition, there was a difference in management perception between the administrator and worker, which clearly shows the difference in the position between the administrator who manages and supervises hazardous disaster factors and the worker who works directly in the field. Such differences in perception can be a factor that cannot be mitigated. Based on this study, more developed research can narrow the perception gap between managers and workers and be used as a basic material for disaster research.
Journal of Korean Society of Disaster and Security
/
v.15
no.3
/
pp.57-66
/
2022
According to the official letter of the Ministry of Employment and Labor (recent guidance on the status of deaths in the construction industry and thorough safety management, April 4, 2022), 17 deaths occurred in construction works worth more than 5 billion won until March 31, 2022. In terms of the size of the construction, 7 cases of 5 billion won to 12 billion won, 5 cases of 12 billion won to 80 billion won, and 5 cases of more than 80 billion won occurred. The causes of death accidents were found to be nine cases (50%), five cases (28%), two cases of collapse (11%), one case of entrapment (5%), and one case of drowning (5%). Safety facilities need to be strengthened to reduce deaths caused by falling, which accounts for most of the deaths, and if fall prevention nets, openings, and safety rails are completely installed, most falling accidents can be prevented. Therefore, this paper intends to present cases of development and use of patent technology through improvement of safety facilities in order to prevent accidents corresponding to the fall of new urban living housing sites, which are small apartment houses.
Kim, Tae-Ik;Lee, Ju-Min;Kim, Sang-Heon;Choi, Soo-Kyung;Seo, Chee-ho
Proceedings of the Korean Institute of Building Construction Conference
/
2015.05a
/
pp.183-184
/
2015
Recent structural approach of the House of Commons has been an increase in demand for dry wall light due to a change in load bearing composite structure of a flat plate type structure under the name of long-life housing, attach the attachment to the wall as the needs of the residents of reserved space increases things that are on the rise. However, depending on the strength of collapse accidents is shown wall and recent wall deposits are required, a load resistance evaluation method of the deposit of the need is the situation. Therefore, in this study, for the evaluation of the evaluation of dry lightweight wall as widely used gypsum board and ALC lightweight wall of two types of laboratory the wall through the previous studies to be installed in direct co-housing to the target and field experiments I want to evaluate the different points.
Proceedings of the Korean Institute of Building Construction Conference
/
2023.11a
/
pp.159-160
/
2023
Recently, interest in reducing cement has been growing. Hwangto, an eco-friendly material, has advantages such as air purification effect and humidity control, but when used, accidents such as form collapse may occur due to low strength and reduced durability. In order to quantitatively evaluate the timing of mold demolding, we would like to evaluate the timing of mold demolding through correlation with compressive strength using ultrasonic pulse velocity. As a result, the time at which 5 MPa is developed is after 20 hours for the test specimen of W/B 41 , in the case of W/B 33, NC33 and HTC33-15 were equally expressed at 12 hours, and HTC33-30 was expressed at 16 hours.
Park, Sae In;Park, Ju-Hyun;An, Hyojoon;Lee, Jong-Han
Journal of the Korea institute for structural maintenance and inspection
/
v.25
no.1
/
pp.33-40
/
2021
In recent years, many construction projects become large and complicated, and construction accidents also steadily increase, which grows interest in the safety and maintenance during construction. Many of the construction accidents are related to temporary construction and structures, but the safety evaluation and management during construction are unclear and indefinite due to the short operating period and continuous change in the formation of the temporary structure. The system support, which is one of the temporary structures to support the pouring load of concrete, was proposed to easily install and dismantle members with connection parts pre-manufactured. The use of the system support is increasing to improve the safety of the temporary structure during construction. However, the system support, which consists of multiple members, still has uncertainties in connectivity between members and supports of vertical members. Therefore, this study analyzed the structure, load, and accident cases of the system support to define the damage scenarios for member connection, support condition, and lateral displacement. The decrease rate of the critical load was analyzed according to the damage scenarios based on the defined unit structure of the system support. In addition, this study provided vulnerable members for each damage scenario, which could induce instability of the temporary structures during design, construction, and operation of the structure.
Korean Journal of Construction Engineering and Management
/
v.12
no.3
/
pp.53-61
/
2011
After several collapse accidents of large structures in the early 1990s in Korea, the government enacted a law that architectural, engineering and construction firms are obliged to have insurance for projects over a certain size. Particularly, with regard to insurance in design and construction supervision works (i.e. engineering insurance), although several operation-based problems were pointed out from practitioners, still little research has been done on analyzing current regnlartory and operational state and suggesting policy alternatives. Hence, this study applies Delphi technique to solicit current operational problems and propose a series of improvements on engineering insurance based on interview surveys targeting major market participants: municipalities, engineering firms, and insurance companies. Key findings culminate in adopting guarantee limits based on credit evaluation, abrogating joint surety, covering a loss of life, increasing insurance entrance fee, extending time covered, and etc. Reaching a consensus on the proposed alternatives between the market participants will form the foundation for sound developments of construction design and engineering industry.
Journal of the Korean Association of Geographic Information Studies
/
v.12
no.4
/
pp.48-58
/
2009
In recent years, construction worker safety in construction site is important. Especially, the frequent collapse accidents have happened in tunnels, utility tunnel and underground structure, so that the importance of worker safety is greatly emphasized. It is difficult to communicate with other workers in underground space, using the current cable or wireless communicator. When the accident is occurred, it can't rescue workers. This is the reason that it has a deficiency to find a location of survivor and communicate rescure crew and field workers. In this paper we extract the optimal technical factors of USFSS(Underground Structure Field Support System) based on integrated technique of wireless communication and location awareness. And USFSS developed in this study is suited for bad environment of underground structure construction and able to track 3D position of laborer and communicate mutually.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.