• 제목/요약/키워드: construction case

검색결과 6,337건 처리시간 0.03초

외국산시멘트 사용 콘크리트의 경화불량 원인에 대한 사례연구 (A Case Study on Retarded Hardening of concrete Used Imported Cement)

  • 이양수;김남호;김원기;정재동
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 1992년도 봄 학술발표회 논문집
    • /
    • pp.23-28
    • /
    • 1992
  • In recent years, due to the construction boom the demand of cement is increasing suddenly and the use of imported cement is inevitable. But, because the quality of imported cement varies quite a lot, many problems have been encountered in construction fields. These problems include hardening retardation, lower early strength and crack of concrete. The object of this study is to explain causes for hardening retardation from a construction field case and propose a solution

  • PDF

상부자연사면 내 침식성 붕괴에 대한 사례 연구 (The Case Study of Corrosive Fall in Upper-Slope)

  • 이정엽;구호본;김승현
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2008년도 추계 학술발표회
    • /
    • pp.1038-1049
    • /
    • 2008
  • The purpose of this case study is corrosive fall in Upper-Slope. Upper-slope of this slope affect in fall of the cut-slope because of wide valley. Deposit which is piled up naturally is the sinkage occurs gradually in upper-slope.

  • PDF

건설기업 법정관리의 실태와 향후 과제 (Actual Condition and Extended Suggestions of Legal Management of Construction Enterprise in Korea)

  • 김진호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 추계 학술논문 발표대회
    • /
    • pp.208-209
    • /
    • 2013
  • In recent times, the legal management of construction enterprise has become one of important theme in the domestic construction industry. Therefore, the objective of this paper is to consider rational methodology of legal management of construction enterprise. To achieve this objective, this paper performs a case study about the major cause and significant characteristic of the legal management. In conclusion, the following factors are systematized : 1) actual condition of legal management of construction enterprise in korea, 2) the influence and extended suggestions of legal management.

  • PDF

공사관리프로세스와 정보화 기반의 건설 지식경영 추진 사례 (A Case Study of Knowledge Management for Construction Business Based on Construction Management Process and Information System)

  • 신용기
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2004년도 제5회 정기학술발표대회 논문집
    • /
    • pp.153-159
    • /
    • 2004
  • 산업의 경쟁력 요소로서 지식의 중요성은 정보기술의 발전과 함께 나날이 커가고 있으며 이에 따라 제시된 기업경영 기법이 지식경영이다. 건설업의 경우도 다양하고 광범위한 지식이 요구되는 산업 특성으로 인하여 지식경영의 중요성은 커지고 있으며, 이에 따라 많은 건설업체가 지식경영을 도입, 추진하고 있다. 본 논문에서는 이러한 건설업체 도입 및 추진사례 중 삼성건설의 "1) 자료형 지식자산과 인적 지식자산으로의 지식규정", "2) 공사 프로세스와의 결합을 통한 지식경영 조직접목", "3) 지식경영에 있어서의 정보화의 역할과 기여" 3가지 추진 사례를 중심으로, 실제 조직에의 적용時 문제점, 해결방안 및 그 결과를 제시함으로써, 건설업에서의 지식경영 발전과 이를 통한 지식산업으로서의 건설업 발전방항을 모색해 보는 기회를 제시해 보고자 한다.

  • PDF

IMPACT OF CONSTRUCTION MATERIAL COST VARIATION ON THE ON THE FEASIBILITY OF BUILDING PROJECTS IN DEVELOPING COUNTRIES: A CASE STUDY IN VIETNAM RISK

  • Soo-Yong Kim;Luu Truong Van;Byeong-Gi Yoo;Luong Thanh Dung
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.96-105
    • /
    • 2007
  • This paper presents a study on the impact of variation of construction material prices on the feasibility of building projects in Vietnam. The paper makes use of Monte-Carlo simulation for financial risk analysis of net present Value (NPV) and internal rate of return (IRR). To well illustrate the influencing, a case study is presented. The research results show that there is a strong correlation between steel prices, gold prices, and $US exchange rate. Outputs of statistics also reveal that the concurrent variation of prices of cement, steel, sand, brick, formwork and stone has strongly negative impact on NPV and IRR of building projects. The results also indicate that the proportion of steel cost to total construction cost is 17.95% which is the cause of risks for the feasibility of building project in Vietnam. The paper stresses that feasibility study of building project must integrate the impact of construction materials prices in order to mitigate risks in developing countries as Vietnam.

  • PDF

Applying Unit Modular In-Fill Construction Method for High-Rise Buildings

  • Moon, Sangdeok;Kim, Junyoung;Lee, Jaesung;Ock, Jongho
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.132-137
    • /
    • 2015
  • A modular construction method includes factory-prefabricated room-sized volumetric units. Although low-rise buildings have been constructed worldwide using this method for more than 30 years, it is a relatively new technology in high-rise construction. There are three basic methods of constructing high-rise buildings using modular construction: the core method, the core-and-podium combination method, and the modular in-fill method. While the first two have been used in the USA and in several European countries, the third method, introduced in 2011 by an international cruise ship development firm, is a rather new approach for which there are few case histories. Therefore, its applicability and construction feasibility should be verified. As a pilot study to test the applicability of the modular in-fill method, a 12-story residential building was built in Korea. This paper describes a case study of the pilot project. The advantages and disadvantages of the method and its applicability in terms of cost effectiveness and construction schedule management were evaluated.

  • PDF

장지간 깊은 굴착에서 지반변형 및 버팀보 축력변화 특성 사례연구(I) (Case Study of Characteristic of Ground Deformation and Strut Axial Force Change in Long Span Deep Excavation(I))

  • 김성욱;한병원
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2009년도 춘계 학술발표회
    • /
    • pp.308-319
    • /
    • 2009
  • In the case of relatively good ground and construction condition in the deep excavation for the construction of subway, railway, building etc., flexible earth retaining systems are often used in an economical point of view. It is generally known that the mechanism of behavior in the flexible earth retaining system is relatively more complicated than the rigid earth retaining system. Moreover in the case of long span strut supporting system the analysis of strut axial force change becomes more difficult when the differences of ground condition and excavation work progress on both sides of excavation section are added. When deeper excavation than the specification or installation delay of supporting system is done or change of ground condition is faced due to the construction conditions during construction process, lots of axial force can be induced in some struts and that can threaten the safety of construction. This paper introduces two examples of long span deep excavation where struts and rock bolts were used as a supporting system with flexible wall structure. And the sections of two examples are 50 meters apart in one construction site, they have almost similar design and construction conditions. The characteristics of ground deformation and strut axial force change were analysed, the similarity and difference between measurement results of tow examples were compared and investigated. The effort of this article aims to improve and develop the technique of design and construction in the coming projects having similar ground condition and supporting method.

  • PDF

설계도서 변경에 의한 실 공사비의 책정에 관한 연구 (The Research About Suitability of The Cost of Work According to The Alteration of Design Literature)

  • 임칠순;이규철
    • 한국건축시공학회지
    • /
    • 제3권3호
    • /
    • pp.113-120
    • /
    • 2003
  • The purpose of this thesis is to provide an appropriate trade-off information for the conflicting interests caused by the various factors between building owner and contractor during selecting the contractor and performing the construction work, in which the construction was contracted by open bidding from the government or private organizations. In order to propose the legitimate evidence, the differences between the domestic contract sheet of drawing change and the process of drawing change and those of the foreign countries were compared and analysed. The number of construction ordered in Youngdong area in 2001 whose construction expenses are more than 100,000,000 won is 218 items and 147,005,000,000 won in total cost. Among them, the number of 218 items whose total cost amounts to 16,705,000,000 (11.36%) is in case of increase of construction expenses due to the drawing changes, and the number of 48 items whose total cost amounts to 2,009,000,000 won (1.37%) is the case of decrease. In conclusions, the contractor could have more benefits than the building owner in case they submit the detailed estimate sheet without eliminating the increasing expenses of construction. It is shown that the building owner's loss is increasing whenever the labor cost is higher than material cost. Therefore, this thesis proposes a proper standards for the harmonious compromise between the contractor and the building owner for the problems caused by the drawing changes when the contract agreement is occurred.