Cyclic Loading Test for Composite Beam-Column Joints using Circular CEFT Columns (콘크리트피복 원형충전강관 기둥-강재보 접합부에 대한 반복하중실험)

  • Lee, Ho Jun;Park, Hong Gun;Choi, In Rak
    • Journal of Korean Society of Steel Construction
    • /
    • v.29 no.6
    • /
    • pp.411-422
    • /
    • 2017
  • In this study, to investigate the seismic performance of beam-column joints using concrete-encased and -filled circular steel tube(CEFT) columns, two types of tests were performed: (1) column - flange tension test and (2) beam - column joint cyclic load test. In column - flange tension test, test parameters were concrete encasement and connection details: flange width and strengthening rebar. Five specimens were tested to investigate the load-carrying capacity and the failure mode. Test results showed that increase of flange width from 200mm to 350mm result in increase of connection strength and stiffness by 61% and 56%, respectively. Structural performances were further improved with addition of tensile rebars by 35% and 92%, respectively. In cyclic loading test, three exterior beam-column joints were prepared. Test parameters were strengthening details including additional tensile rebars, thickened steel tube, and vertical plate connection. In all joint specimens, flexural yielding of beam was occurred with limited damages in the connection regions. In particular, flexural capacity of beam-column joint was increased due to additional load transfer through tube - beam web connection. Also, connection details such as increase of tube thickness and using vertical plate connection were effective in improving the resistance of panel zone.

Evaluation on Structural Performance of Precast Bridge Deck Joint using HSFRC (고강도 강섬유보강콘크리트를 적용한 프리캐스트 바닥판 이음부의 구조성능 평가)

  • Lee, Han-Joo;Chung, Chul-Hun;Shin, Dong-Ho;Park, Se-Jin;Kim, In-Gyu
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.21 no.6
    • /
    • pp.196-205
    • /
    • 2017
  • In precast deck system, structural performance and serviceability are mostly determined by the connection methods between the precast decks. This study proposes precast deck system with asymmetric ribbed connection details using High Strength Fiber Reinforced Concrete(HSFRC) with filler. To verify the proposed method, the flexural performance experiment was carried out with variation of joint cross section type and splice rebar details. From the test results, regardless of joint details, spliced tensile rebars of specimens were deformed to yielding strain level. Also, all types of specimens resulted in sufficient flexural performance. These test results show that the minimum lap splice length specified in current Korea Highway Bridge Design Code is conservative for precast deck joint using HSFRC. Therefore, splice details can be simplified and joint width can be reduced by using HSFRC with filler between the precast decks, and the proposed precast deck systems can be applied to the connection part of precast decks effectively.

An experimental study on different socket base connections under cyclic loading

  • Pul, Selim;Husem, Metin;Arslan, Mehmet Emin;Hamzacebi, Sertac
    • Computers and Concrete
    • /
    • v.13 no.3
    • /
    • pp.377-387
    • /
    • 2014
  • This paper presents an experimental study on socket base connections of precast reinforced concrete columns. The main purpose of this study is to determine socket base connection which has the closest behavior to monolithic casted column-base joints. For this purpose, six specimens having different column-socket base connection details were tested under cyclic loading. For each test, strength, stiffness, ductility and drift ratios of the specimens were determined. Test results indicated that a suggested connection type is 10%-30% stronger than the other type of connections under lateral loading. The welded connection (PC-5) had better lateral load carrying capacity and ductility. On the other hand, performance of standard connection (PC-1) which is commonly used in construction was weaker than other connections. Thus, decision of connection type should be referred not only performance but also applicability.

Behavior of Stud Connection Subjected to both Constant Axial and Various Bending Moments (축력과 휨을 받는 스터드볼트 접합부의 거동에 관한 실험적 연구)

  • 김승훈;이태석;서수연;이리형;홍원기;백승대
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2000.10a
    • /
    • pp.535-540
    • /
    • 2000
  • When the stud connection is considered as pin joint in the practical design, it is required to have high deformability. The rotational capacity as well as moment of the connection are evaluated through experimental works. Considered in the test are the reinforcement ratios of concrete member, the magnitude of axial force and connection details. It is shown that the stud connection has some quantity of moment capacity buy on the other hand it has low deformability. The strength and deformability of the connection depend on the axial force and reinforcements around the studs. The strength and ductility of the connection ate increased by using closed C-type.

  • PDF

Performance of Precast Concrete Beam-Column Connections Subjected to Cyclic Loading (반복하중을 받는 프리캐스트 콘크리트 보-기둥 접합부의 거동 연구)

  • Kim, Kyu-Rhee;Park, Hong-Gun
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2004.11a
    • /
    • pp.619-622
    • /
    • 2004
  • In this study, a moment resisting precast concrete beam-column connection is proposed. An experimental study was carried out to investigate the connection behavior subjected to cyclic loading. Three precast beam-column interior connections and one monolithic connection were tested. Variable included the detailing used at the joint to achieve structural constructability and the location of mild steel reinforcement and high strength bar. During specimen fabrication, the joint details enables ease and speed of construction. Connection performance is evaluated on the basis of ductility, energy dissipation capacity, connection strength, and drift capacity. Based on test results, the precast concrete beam-column connection is capable of matching or exceeding the performance of the monolithic connection.

  • PDF

Performance Evaluation of Connection of Seismic Rectangular Steel Tube Column-H Beam Using One-side Bolts (원사이드 볼트를 이용한 내진 각형강관 기둥-H형강 보 접합부의 구조성능평가)

  • Shim, Hyun-Ju;Jang, Bo-Ra;Chung, Jin-An;Lee, Eun-Taik
    • Journal of Korean Society of Steel Construction
    • /
    • v.22 no.4
    • /
    • pp.355-363
    • /
    • 2010
  • The objective of this study is to examine the structural performance on the Rectangular Steel Tube Column-to-H Beam connections using one-side bolts and T-stub. Although a rectangular steel tube comparing with a H-shaped steel has many advantages and is more efficient, its application is limited due to the lack of experiences and connection details. Existing steel moment connections using the rectangular steel tube are mainly using through plate diaphragms. Its processing of construction is so complicated that it is hard to apply in the field. In this study, the structural performance and the earthquake capacity for T-stub connection with one-side bolts were investigated. And it is performed a comparative analysis of strength, rigidity, total rotation and energy absorption capacity for the various connection details.

Development of Top-Down Connection System to Solve the Problem of Construction Tolerances in Installing Prefabricated Beams to Pre-founded Columns (시공오차가 있는 선기초기둥에 공장제작보의 설치가 용이한 탑다운공사용 접합기술개발)

  • Kim, Seung-Weon;Jung, Hee-Weon;Park, Dae-Yung;Kim, Dong-Gun;Park, Joo-Hyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05b
    • /
    • pp.25-30
    • /
    • 2011
  • Almost prefounded columns for top-down construction certainly have construction tolerances in plan and plumbness. Therefore, it is very difficult to connect prefabricated beams to prefounded columns at each floor level after excavation by usual top-down connection method and this usual connection method leads to long construction time, increasing cost and decreasing quality. This paper presents a new method for connecting prefabricated beam to prefounded column with GROUT-JACKET CONNECTION SYSTEM consisting of sleeve, bearing-shear bands and grout. Details and illustrations of the connections and applications by GROUT-JACKET CONNECTION SYSTEM for the top-down construction are also included in this paper.

  • PDF

Experimentally investigation of replaceable reduced beam section utilizing beam splice connection

  • Yasin Onuralp Ozkilic;Mehmet Bakir Bozkurt
    • Steel and Composite Structures
    • /
    • v.52 no.1
    • /
    • pp.109-119
    • /
    • 2024
  • This study presents a replaceable reduced beam section (R-RBS) located at the column end in moment resisting frames (MRFs). An end of the R-RBS is connected to column by using end-plate moment connection and the other end of that is connected to main beam with beam splice connection. Therefore, the RBS that is expected to yield under an earthquake can be easily replaceable. Geometry of the RBS and the thickness of the beam splice connection are the prime variables of this study. A total of eight experimental test was carried out to examine the seismic performance of the proposed R-RBS with the connection details. The results obtained from experimental studies demonstrated that plate sizes of the beam splice connection significantly affect the seismic performance of RBSs used in MRFs.

Experimental study on RC frame structures strengthened by externally-anchored PC wall panels

  • Choi, Seung-Ho;Hwang, Jin-Ha;Lee, Deuck Hang;Kim, Kang Su;Zhang, Dichuan;Kim, Jong Ryeol
    • Computers and Concrete
    • /
    • v.22 no.4
    • /
    • pp.383-393
    • /
    • 2018
  • Infill wall strengthening method has been widely used for seismic strengthening of deteriorated reinforced concrete (RC) frame structures with non-seismic details. Although such infill wall method can ensure sufficient lateral strengths of RC frame structures deteriorated in seismic performances with a low constructional cost, it generally requires quite cumbersome construction works due to its complex connection details between an infill wall and existing RC frame. In this study, an advanced seismic strengthening method using externally-anchored precast wall panels (EPCW) was developed to overcome the disadvantage inherent in the existing infill wall strengthening method. A total of four RC frame specimens were carefully designed and fabricated. Cyclic loading tests were then conducted to examine seismic performances of RC frame specimens strengthened using the EPCW method. Two specimens were fully strengthened using stocky precast wall panels with different connection details while one specimen was strengthened only in column perimeter with slender precast wall panels. Test results showed that the strength, stiffness, and energy dissipation capacity of RC frame specimens strengthened by EPCWs were improved compared to control frame specimens without strengthening.

Cyclic Test of welding connections for Steel-Plate Concrete Column to H-shaped Steel Girders (강판 콘크리트(SC) 기둥과 H형강 보의 용접 접합부에 대한 반복 이력 실험)

  • Park, Ho Young;Kang, Cheol Kyu;Choi, Byong Jeong
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.18 no.1
    • /
    • pp.63-71
    • /
    • 2014
  • This study presents an experimental study of the structural behavior for steel plate-concrete column-to-steel girder connections. Experiments were carried out to investigate the moment-rotation characteristics, failure behavior and ultimate moment capacity of these connections. The results of this experimental study involving three welded moment-resisting connections subjected to cyclic loading are presented. The specimens were fabricated at full scale to evaluate their hysteretic behavior. A description of the test specimens, the details of the joint, the test system and the testing methods are described. The test results showed that the structural behavior of these composite connections was influenced by the connection details.