The engineering process including design, analysis/evaluation and manufacturing activities is becoming one of the key issues to embody a concurrent engineering concept. This paper proposes a framework to integrated the complicated engineering design and manufacturing processes under the concurrent engineering environment. The framework offers the following facilities: (1) to represent the complicated engineering process (2) to coordinate design activities and execute the process in a distributed environment (3) to support a communication among the related engineers. The engineering processes is depicted using process flow graphs that consist in tasks and the corresponding input and output data. The engineering activities in the defined processes can be executed in a distributed environment through process controller of the framework. Engineers can communicate to suggest their opinions and to exchange product information in the framework. We have conformed the CORBA standard to integrate various distributed engineering the and communicate among them, and used a Java to support the platform independent environment on the Internet. Since the proposed framework an be a formal approach to integrate the engineering processes by providing formalism, parallelism, reusability, and flexibility, it can be effectively applied to embody the concurrent engineering concept in a distributed environment.
The 2th International Conference on Construction Engineering and Project Management
/
pp.520-529
/
2007
Apportioning responsibilities of concurrent delay to the owner and the contractor is a difficult task, due to the sophisticate nature both in the schedule and in the factors that cause the delay. This research attempts to develop a simplified yet systematic approach that can be used for a fair apportionment of concurrent delay. A concurrent delay is defined herein as when the contractor and the owner have both caused independent critical path delays during the same approximate time period. Incorporating the concepts of windows analysis and critical path method (CPM), the developed approach has three "windowing of delay" steps to quickly apportion the delay in each of these windows, and a fourth step to sum up those apportioned delays to obtain each party's final responsibilities. This developed approach is found to be simple and effective at this stage; it will be tested against real cases in the near future.
In this study, computer simulations were conducted to assess the use of a circulating concurrent-flow dryer for rapeseed drying and to determined the effect of this drying method on the germination ratio of rapeseed after the drying process was complete. The simultaneous heat and mass transfer between air and rapeseed in a concurrent-flow dryer was examined by simulation. The drying simulation was based on several parameters with sequent time series. Equations concerning air psychrometrics, physical properties, thermal properties, equilibrium moisture content, thin layer drying of rapeseed, etc. were all combined to solve the simulation models. Based on energy and mass transfer in the concurrent-flow drying model, a simulation program for the circulating concurrent-flow rapeseed dryer was built along with a detailed description of the mathematical solution to the model. A pilot scale circulating concurrent-flow dryer(200 kg/batch) was used to verify the fitness of the simulation program. A comparison between the experimental data and the model predicted results was presented and discussed. The drying parameters and germination ratio were analyzed and the accuracy of the simulation program was evaluated. The simulation program proved to be reliable and was shown to be a convenient tool for predicting rapeseed drying and germination ratio of rapeseed in a concurrent-flow dryer.
The 3th International Conference on Construction Engineering and Project Management
/
pp.440-448
/
2009
Concurrent construction (or overlapping) is an alternative project delivery process to reduce time-tomarket such that the owner can get higher profits; the increased profits due to shortened project duration would exceed the loss of profits from the increased cost, if any. For more effective concurrent construction, a new conceptual framework for concurrent construction planning is suggested. With multiple work methods available in each activity, the performance of overlapping between two activities in terms of cost is affected by the compatibility between work methods selected and the benefit to the project owner is determined by internal rate of return (RoR). The impact of the compatibility between work methods and the conceptual framework are explained by a hypothetical case study.
To survive in the intensive world wide automotive market, more and more automotive companies are investing their resources into concurrent engineering systems (CE) based on the combined CAD/CAM/CAE/ PDM technology. The main objectives of CE in automotive companies are the quality improvement of products and the reduction of cost and time to market. Remarkable effects are appearing from some of these companies. As shown in this paper, these successful automotive companies have been focusing on establishing the new process and methodology in applying CE into their car development process.
The concurrent engineering technologies have been broadly used in the field of the design, testing, manufacturing and maintenance works to reduce development time and costs. For this purpose, many design environments with the product data management system, the virtual engineering system and web database system are developed. In this research, we developed the driving simulator of the KTX(Korea Train Express) as a basic study for building the concurrent engineering design environment of rolling stock. The virtual track was developed from the Seoul to the Busan and the Daejeon to Mockpo to generate immersible driving environment. Also, fault generation systems were developed to educate drivers of the KTX. We expect to reduce the time and costs of newly developed rolling stock using the design environment developed in the research.
The design development, and production of a product is one of the greatest challenges which flexible manufacturing systems face today. No matter how a company refines and controls the manufacturing process, if the product is not properly designed, it will not operate correctly or performed well. Therefore the focus on quality of design must be balanced. One such strategy certain to address the managerial and manufacturing of the future is concurrent engineering. Concurrent engineering calls for the consideration and inclusion of product design attributes satisfying all the design constraints such as customer requirements. Furthermore, concurrent engineering has been recently promoted in many industries as a response to competitive marketing pressures. Viewed as a systematic approach of creating high quality products and bringing them to market at lower cost and in significantly less time, it also attracts the attention of quality designers. In this paperm a methodology and model for optimizing the product design, especially selection of optimal design alternative, is developed. The focus of this paper is on product design as the most critical activity of concurrent engineering. The model is based on the customer requirements for quality. Customer requirements for a certain product can be grouped based on the various design attributes. The design attributes have the priorities. The number of design functions. Design attributes value are calculated, however these values are applied to the optimization method. Numerical example will be illustrated.
한국전자거래학회 2001년도 International Conference CALS/EC KOREA
/
pp.615-624
/
2001
Internet technology opens up another domain for building future CAD/CAM environment. The environment will be global, network-centric, and spatially distributed. In this paper, we present a new approach to network-centric virtual prototyping (NetVP) in a distributed design environment. The presented approach combines the current virtual assembly modeling and analysis technique with distributed computing and communication technology fur supporting virtual prototyping activities over the network. This paper focuses on interoperability, shape representation, and geometric processing for distributed virtual prototyping. STEP standard and CORBA-based interfaces allow the bi-directional communication between the CAD model and virtual prototyping model, which makes it possible to solve the problems of interoperability, heterogeneity of platforms, and data sharing. STEP AP203 and AP214 are utilized as a means of transferring and sharing product models. In addition, Attributed Abstracted B-rep (AAB) is introduced as 3D shape abstraction for transparent and efficient transmission of 3D models and for the maintenance of naming consistency between CAD models and virtual prototyping models over the network.
This paper treats the implementation of concurrent engineering principles for ROC development of a future infantry fighting vehicle. Based on the acquisition process of weapon systems and operational requirements provided by users, Quality Function Deployment(QFD) is used to translate the requirements of the user into specific trade-off analysis. Results of these studies and the use of concurrent engineering principles are presented.
To achieve high-speed (giga-bit) connectivity for short-range wireless multimedia applications, the millimeter-wave (mmWave) wireless personal area networks with directional antennas are gaining increased interest. Due to the use of directional antennas and mmWave communications, the probability of non-interfering transmissions increases in a localized region. Network throughput can be increased immensely by the concurrent time allocation of non-interfering transmissions. The problem of finding optimum time allocation for concurrent transmissions is an NP-hard problem. In this paper, we propose two enhanced versions of previously proposed multi-hop concurrent transmission (MHCT) schemes. To increase network capacity, the proposed schemes efficiently make use of the free holes in the time-allocation map of the MHCT scheme; thus, making it more compact.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.