• Title/Summary/Keyword: concrete lining

Search Result 319, Processing Time 0.027 seconds

A Study on Building Wall with Glossing Design-Concrete (건축벽체용 광택문양콘크리트의 성능평가 연구)

  • 김종원;김재은;윤상혁;양동일;조상영;정상진
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2003.05a
    • /
    • pp.573-578
    • /
    • 2003
  • Contemporary architecture calls for a wide range of surface textures and treatments. A surface compatible with the architect's design may vary from a glass-smooth finish to one requiring special sculptured ornamentation. These surfaces require many different types of form sheathing and lining. The purpose of study development new design form and made elaborateness shape. Easy to used in field that architecture finish material not used expect effective reduce of working hours, personnel expenses, architecture finish material, cost. After this, building wall apply a variety shape in concrete surface

  • PDF

An Study on Heat Transfer Analysis to Concrete PC Pannel Lining under Tunnel Fire Scenario (터널 화재시나리오에 따른 콘크리트 PC패널 라이닝의 전열특성에 관한 해석적 연구)

  • Kim, Hyung-Jun;Kim, Heung-Youl;Park, Kyung-Hoon;Shin, Hyun-Jun
    • Proceedings of the Korea Institute of Fire Science and Engineering Conference
    • /
    • 2009.04a
    • /
    • pp.487-492
    • /
    • 2009
  • This study was performed FE numerical analysis under 120-minute fire conditions, using the ABAQUS, a wide use software, on the basis of the test results by concrete tunnel lining fire strengths (ISO, RWS, and MHC). The concrete material test was to secure the material properties of concrete linings, which were numerical analysis input conditions. And then built the material properties, such as specific heat, heat transfer rate, heat expansion rate, density, elasticity coefficient and compression strength under high temperature conditions, as database at 20 $^{\circ}C$ to 800 $^{\circ}C$, applying them to analysis as input values. As a result, the tunnel linings under RWS fire conditions saw fire temperature rose to maximum 1119 $^{\circ}C$at the location of 5 mm above a thermal surface, and saw surface temperature amount to 1214 $^{\circ}C$ in the middle part.

  • PDF

Design and Construction of Bottom Drainage Tunnel and the Watertight Tunnel (배수형 터널과 방수형 터널의 설계와 시공)

  • Kim, Seung-Ryeol;Park, Gwang-Jun;Park, Bong-Gi
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1993.03a
    • /
    • pp.49-58
    • /
    • 1993
  • Reappraisal of the design and the construction concept of the bottom drainage tunnel has been made through the seepage analysis. An appropriate design approach for this tunnel has also been proposed. It was revealed from this study that water pressures acting on the concrete lining in the bottom dralnage tunnel much depend on the permeability of the surrounding ground, the source of water supply and the discharge capacity of dralnage facilities. The full release of these water pressures by the current drainage system could not be expected if this type of tunnel is constructed in the ground including alluvial deposits having a high permeability. The necessity of a proper reinforcement of the concrete lining or a modification of its shapes corresponding to the water pressure has been suggested.

  • PDF

A Study on the Drain Performance & Pore Structure of Cellular Mortar which Drain Material of the Composite Lining Method (Composite 라이닝 공법의 배수공 재료인 경량기포모르타르의 공극구조와 배수성능에 대한 고찰)

  • Choi, Hee-Sup;Ma, Sang-Joon;Lee, Heung-Soo;Seo, Shin-Seok
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2009.05a
    • /
    • pp.425-426
    • /
    • 2009
  • As a result of the Mercury Intrusion Porosimetry(MIP) test, FCR Batch with the continuous voids in excellent permeability is appeared with the Cellular Mortar that is most suitable which Drain Material of the Composite Lining Method.

  • PDF

An Evaluation of the Mechanical Property for the Backfilling Material of the NATM Composite Lining Tunnel using the Lightweight Foamed Mortar (경량기포 모르타르를 이용한 NATM Composite 라이닝 터널 뒤채움재의 역학적 특성 평가)

  • Ma, Sang-Joon;Choi, Hee-Sup;Kim, Dong-Min;Lee, Heung-Soo;Kim, Kyung-Duk
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.04a
    • /
    • pp.717-720
    • /
    • 2008
  • This paper, an evaluation of the mechanical property for the backfilling materials of the NATM Composite lining tunnel using the lightweight foamed mortar, relates to the performance of permeability, compressive strength and unit volume weight. Therefore, this study is aimed to prove the three main factor that refered to the above line for development of new tunnel method. As the result of this study, it would be confirmed that the D mix is better than other mixs a side of all tests and its relation that is for the tunnel backfilling materials.

  • PDF

1Monitoring system for the subway structures using pre-strain controllable FBG sensors (프리스트레인 가변형 광섬유센서를 이용한 지하철 구조 모니터링시스템)

  • Kim, Ki-Soo
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.700-709
    • /
    • 2009
  • FBG sensor system is applied to the concrete lining structure in Taegu subway. Near the structure, the power cable tunnel construction started. We wanted to measure the deformation of the structure due to the construction by the FBG sensor. The applied sensor has the gauge length of 1 meter to overcome the inhomogeneity of the concrete material with enough length. In order to fix tightly to the structure, the partially stripped parts of the sensor glued to the package and slip phenomenon between fiber and acrylate jacket was prevented. Prestrain of the sensor was imposed by controlling the two fixed points with bolts and nuts in order to measure compressive strain as well as tensile strain. The behavior of subway lining structure could be monitored very well.

  • PDF

Correlation analysis of traffic and crack in concrete lining (교통량과 콘크리트 라이닝 균열 상관관계 분석)

  • Gyu-Phil Lee
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.25 no.5
    • /
    • pp.345-355
    • /
    • 2023
  • An analysis of covariance and Pearson correlation coefficient were performed to identify the relationship between both variables: traffic volume and crack. For this, it was carried out to analyse 216 tunnel inspection/diagnosis results with respect to the traffic. As a result, it has been proven that traffic volume and cracks in concrete linings are highly correlated. Therefore, it is recommended to consider traffic volume in planning of preemptive maintenance such as crack repair, etc.

The control method for axial cracks on NATM tunnel linings (NATM 터널라이닝 종방향 균열 제어공법)

  • Zheng, Xiu-Mei;Park, Inn-Joon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.11 no.4
    • /
    • pp.437-447
    • /
    • 2009
  • It is easily found by several references of NATM that the cracks on the lining concrete of NATM are more developed than those of the conventional tunnel methods. Based on the results of research, the new method is proposed to control and protect the axial cracks on the tunnel linings. Also, the efficiency of proposed method is evaluated using the Distinct Element Method.

Research of Early-age Strength Development Technology for Remove the Steel Form of Large-wide Tunnel Lining Concrete (대단면 터널 라이닝 거푸집의 조기 제거를 위한 초기 강도 발현 기법 연구)

  • Kim, Kwang-Don;Lee, Deuk-Bok
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.18 no.5
    • /
    • pp.116-127
    • /
    • 2014
  • The studies were carried out to process one cycle for a day to the large section tunnel lining concrete. Climatic characteristics of the tunnel inside are changed, when the temperature of the concrete placement is low, the mold remove time is increased that the heat of hydration speed be delayed because affects the strength development, to compensate for this, after installing the curing sheet on both sides of the steel form and installation of tunnel entrance, when it comes to providing the additional heat source of $28{\pm}2^{\circ}C$ therein, it was to be achieved early strength development control standards (4.5MPa) presented as a crack control scheme or more, thus, It was able to remove after age of 14hr from mold. On the other hand, under the conditions of $10{\pm}1^{\circ}C$ that a natural curing temperature in the tunnel, it was analyzed must ensure the curing time of 36hr or more after concrete placement. Throughout this study, the concrete strength development and the temperature in the early-age concrete, it can find that reverify the curing temperature is greatly affected, even concrete fly ash is mixed 10%, if it is possible to raise the surface temperature for a predetermined time, is not a problem in the early strength development.

The study on mechanical properties of PC panel with steam curing condition (증기양생 조건에 따른 터널 PC 패널의 물리적 특성에 관한 연구)

  • Ma, Sang-Joon;Jang, Pil-Sung;Shiin, Jin-Yong;Nam, Kwan-Woo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.10 no.1
    • /
    • pp.17-24
    • /
    • 2008
  • Many problems exist in the current cast in place concrete lining used in domestic tunnel construction. Especially, the crack of tunnel lining brings about a social and economic problem. It has a lot of influence on stability of structure and the fine finish of lining. So enormous repair-work and reinforcement of tunnel lining could occur an running out of government's budget. In our country, there are domestic production enterprises which produce a special pre-cast concrete product, but the technical level of them is still far behind compared to developed countries. Also, optimum steam coring method is important for the production of high quality product. But there is no regulation of steam curing method in our country. This study is to investigate the properties of PC panel according to the variation of steam curing conditions such as presteaming time and rate of temperature rise. The result shows that the optimum presteaming time of steam curing method in PC panel is more than 1 hour and the desirable rate of temperature in curing chamber is about $20^{\circ}C/hr$.

  • PDF