• Title/Summary/Keyword: computerizing system

Search Result 42, Processing Time 0.018 seconds

Development of an Application System for Efficient Management of Underground Water Supply Facility - Pilot Study in Chonju City - (상수도 지하시설물의 효율적 관리를 위한 응용시스템 개발 -전주시를 대상으로-)

  • 오권호;진철하;이근상;정승현;조기성
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.18 no.2
    • /
    • pp.111-120
    • /
    • 2000
  • Water, waste, electric and gas facilities are urban based facilities that needed in our life and are often located in underground. Therefore, underground facilities are more difficult to manage efficiently than ground facilities. It is needed to carry out survey/probe into underground facilities and to build database in order to prevent city-misfortunes being occurred because of negligent management and in order to minimize budget-waste and a traffic jam according to repetition of road excavation constructions. Also, the development of application system is required to manage efficiently underground facility. Chonju city has launched underground water supply facility computerizing project as a part of National Geographic Information System project until December 1998 and executed survey/probe into 402.89 km water supply that is 80 mm up inside central town area 39.6 $km^2$. Also, chonju city built database into 537 km water supply that is 80 mm below based on water supply card without other survey/probe works. Also, existing work process each department is changed into GIS applied work process and underground water supply facility management system is developed by its work process basis. Water supply underground facility management system that is developed is composed of sub-system like base-map management, water supply inspect, water supply management and water supply inquiry, construction work management, administration management and map management. This research presents the procedure and method of underground water supply facility survey/probe and problem being occurred during survey/probe procedure and also show the functions of each sub-systems composing underground water supply facility management system.

  • PDF

A Study on Application Enhancement Plan through Utilization-Case Analysis of National Geotechnical Information GIS DB in Construction Field (국토지반정보 GIS DB의 건설분야 활용사례 분석을 통한 활용 향상방안 연구)

  • Jang, Yong-Gu;Lee, Jun-Woo
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.17 no.2
    • /
    • pp.19-26
    • /
    • 2009
  • The Ministry of Land, Transport and Maritime Affairs(MLTM) project for the DB construction of national geotechnical information was automatically computerized the geotechnical investigation results on the construction site in 2007. So 'the rule for computerizing of geotechnical investigation results and its application' were promoted the establishment and applicable project. It was promoted in earnest that all organization and affiliation of MLTM, local governments included the project because of stabilization of the law from 2008. We have analyzed a application-ratio of geotechnical information about users of geotechnical information system and distribution data and established a plan of applying enhancement for the DB construction and DB utilization in 2008. In this paper, we propose the result for application-ratio analysis and application plan through the application-case study of national geotechnical information DB. In the application-ratio analysis, the analysis in the field shows the most high as 39% in construction planning and preliminary investigation, the analysis in the effect of capabilities shows the most high as 25% in the increased efficiency of business. Also the analysis in the field of application shows the most high as 95% a application-ratio of geotechnical information in architecture and civil.

  • PDF