• Title/Summary/Keyword: complex gap

Search Result 326, Processing Time 0.028 seconds

End to End Anastomosis of Type A(long gap) Esophageal Atresia in 1,200 gram Premature Baby A Case Report (1,200gram 미숙아에서 Type A 식도 폐쇄증의 식도 단단문합술 -1례 보고-)

  • Jo, Sam-Hyeon;O, Bong-Seok;Lee, Dong-Jun;Choe, Yeong-Ryun
    • Journal of Chest Surgery
    • /
    • v.30 no.2
    • /
    • pp.236-240
    • /
    • 1997
  • The management of neonate with long gap atresia without a fistula(type A) is complex and controversial. Various esophageal reconstruction include use of native esophagus or replacement with colon, stomach and small bowel. A severe premature male, at 28 weeks gestation weighing 1.2kg, was born with type A esophageal atresia in Chonnam University Hospital. Initial treatment consisted of gastrostomy under the local anesthesia and suctioning of proximal pouch, and than underwent delayed esophageal end to end anastomosis. A minimal leakage and mediastinitis ocurred postoperatively, but was treated by adequate drainage and negative suction from the leakage site through the gastrostomy. The patient was discharged in good general condition and normal weight of 5.4kg after 4 months after the surgery.

  • PDF

A Spatial Data Stream Processing System for Spatial Context Analysis in Real-time (실시간 공간 상황 분석을 위한 공간 데이터 스트림 처리 시스템)

  • Kwon, O-Je;Kim, Jae-Hun;Li, Ki-Joune
    • Spatial Information Research
    • /
    • v.18 no.1
    • /
    • pp.69-76
    • /
    • 2010
  • Spatial data streams from sensors are useful in context-awareness for many types of applications. However, an important gap is found between spatial data stream management in real-time and complex computation for spatial context-awareness, and this brings about serious difficulty to integrate spatial data stream processing and context-awareness. In this paper, we present a system called SCONSTREAM(Spatial CONtext STREAm Management) that we have developed to resolve the gap between spatial data stream and context-awareness. The key approach of our system is to filter off unnecessary spatial data streams and convert them to the spatial context streams, which are smaller and more suitable to be processed by the context-awareness module than raw data from sensors. By experimentation, We show that SCONSTREAM resolves the functional gap between spatial stream processing and spatial context-awareness module.

Reconstruction of a long defect of the median nerve with a free nerve conduit flap

  • Campodonico, Andrea;Pangrazi, Pier Paolo;De Francesco, Francesco;Riccio, Michele
    • Archives of Plastic Surgery
    • /
    • v.47 no.2
    • /
    • pp.187-193
    • /
    • 2020
  • Upper limb nerve damage is a common condition, and evidence suggests that functional recovery may be limited following peripheral nerve repair in cases of delayed reconstruction or reconstruction of long nerve defects. A 26-year-old man presented with traumatic injury from a wide, blunt wound of the right forearm caused by broken glass, with soft tissue loss, complete transection of the radial and ulnar arteries, and a large median nerve gap. The patient underwent debridement and subsequent surgery with a microsurgical free radial fasciocutaneous flap to provide a direct blood supply to the hand; the cephalic vein within the flap was employed as a venous vascularized chamber to wrap the sural nerve graft and to repair the wide gap (14 cm) in the median nerve. During the postoperative period, the patient followed an intensive rehabilitation program and was monitored for functional performance over 5 years of follow-up. Our assessment demonstrated skin tropism and sufficient muscle power to act against strong resistance (M5) in the muscles previously affected by paralysis, as well as a good localization of stimuli in the median nerve region and an imperfect recovery of two-point discrimination (S3+). We propose a novel and efficient procedure to repair >10-cm peripheral nerve gap injuries related to upper limb trauma.

Fabrication of Photo Sensitive Graphene Transistor Using Quantum Dot Coated Nano-Porous Graphene

  • ;Lee, Jae-Hyeon;Choe, Sun-Hyeong;Im, Se-Yun;Lee, Jong-Un;Bae, Yun-Gyeong;Hwang, Jong-Seung;Hwang, Seong-U;Hwang, Dong-Mok
    • Proceedings of the Korean Vacuum Society Conference
    • /
    • 2013.02a
    • /
    • pp.658-658
    • /
    • 2013
  • Graphene is an attractive material for various device applications due to great electrical properties and chemical properties. However, lack of band gap is significant hurdle of graphene for future electrical device applications. In the past few years, several methods have been attempted to open and tune a band gap of graphene. For example, researchers try to fabricate graphene nanoribbon (GNR) using various templates or unzip the carbon nanotubes itself. However, these methods generate small driving currents or transconductances because of the large amount of scattering source at edge of GNRs. At 2009, Bai et al. introduced graphene nanomesh (GNM) structures which can open the band gap of large area graphene at room temperature with high current. However, this method is complex and only small area is possible. For practical applications, it needs more simple and large scale process. Herein, we introduce a photosensitive graphene device fabrication using CdSe QD coated nano-porous graphene (NPG). In our experiment, NPG was fabricated by thin film anodic aluminum oxide (AAO) film as an etching mask. First of all, we transfer the AAO on the graphene. And then, we etch the graphene using O2 reactive ion etching (RIE). Finally, we fabricate graphene device thorough photolithography process. We can control the length of NPG neckwidth from AAO pore widening time and RIE etching time. And we can increase size of NPG as large as 2 $cm^2$. Thin CdSe QD layer was deposited by spin coatingprocess. We carried out NPG structure by using field emission scanning electron microscopy (FE-SEM). And device measurements were done by Keithley 4200 SCS with 532 nm laser beam (5 mW) irradiation.

  • PDF

X-ray/gamma radiation shielding properties of Aluminium-Bariume-Zinc Oxide nanoparticles synthesized via low temperature solution combustion method

  • K.V. Sathish;K.N. Sridhar;L. Seenappa;H.C. Manjunatha;Y.S. Vidya;B. Chinnappa Reddy;S. Manjunatha;A.N. Santhosh;R. Munirathnam;Alfred Cecil Raj;P.S. Damodara Gupta;B.M. Sankarshan
    • Nuclear Engineering and Technology
    • /
    • v.55 no.5
    • /
    • pp.1519-1526
    • /
    • 2023
  • For the first time Aluminium-BariumeZinc oxide nanocomposite (ZABONC) was synthesized by solution combustion method where calcination was carried out at low temperatures (600℃) to study the electromagnetic (EM) (X/γ) radiation shielding properties. Further for characterization purpose standard techniques like PXRD, SEM, UV-VISIBLE, FTIR were used to find phase purity, functional groups, surface morphology, and to do structural analysis and energy band gap determination. The PXRD pattern shows (hkl) planes corresponding to spinel cubic phase of ZnAl2O4, cubic Ba(NO3)2, α and γ phase of Al2O3 which clearly confirms the formation of complex nano composite. From SEM histogram mean size of nano particles was calculated and is in the order of 17 nm. Wood and Tauc's relation direct energy band gap calculation gives energy gap of 2.9 eV. In addition, EM (X/γ) shielding properties were measured and compared with the theoretical ones using standard procedures (NaI (Tl) detector and multi channel analyzer MCA). For energy above 356 keV the measured shielding parameters agree well with the theory, while below this value slight deviation is observed, due to the influence of atomic/crystallite size of the ZABONC. Hence synthesized ZABONC can be used as a shielding material in EM (X/γ) radiation shielding.

The Meaning and Usefulness of Simulation Method for Business Process Reengineering -Focused on the Korean Supreme Court BPR Project (1994-2003)-

  • Hong, Sung-wan;Roh, Tae-hoon;Kang, Sung-min;Lee, Jung-woo;Kang, Ga-na
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 2001.10a
    • /
    • pp.170-202
    • /
    • 2001
  • Simulation is used to reduce a risk involved in the new project and decision-making in an organization and to save cost and time by forecasting different situations. The objectives of this research are to acknowledge the need of simulation through the real life sample and to encourage the use of the simulation method in the future consulting project by continuously making the necessary improvements. This research analyzed the effectiveness of the simulation based on the sample use of simulation method in 1994 and 1997 for the BPR project of certification issuance process at the Supreme Court. In order to evaluate the value of the proposed simulation model, we examined the gap, which existed between the simulation result and the operational data collected by visiting the actual sites where AROS (Automated Registry Office System: automation system developed by LG-EDS Systems) is being utilized. We also identified the causes for the existing gap. According to the analysis result, (1) the gap came from the status change of thinking that the concentration of certification issuance request has eased after the computerization, (2) the gap existed in the operational process because they failed to consider the situational factors of each registry office in the simulation model, and (3) lastly the gap came from the difficulty of formulating the mathematical model for predicting the complex and diverse behavior pattern of individuals requesting the certification issuance. In order to narrow the existing gaps, we made a proposal to improve the certification issuance process where software of certification issuance vending machine was upgraded in order to help the people to use the service conveniently, more part time workers were hared when there was a overload of certification issuance request, and the quality of the certification Issuance vending machine is improved, In this research, we examined an efficient way of resource allocation based on the simulation conducted in 1994 and 1997. By reflecting changes since the simulation of 1994 and allocating the clerk and machine based on the predicted results of the simulation, we maximized the efficiency of the certification issuance process. In conclusion, this research examined the future usability of simulation method based on the analysis result and identified the key issues to consider when using the simulation method in the future consulting project.

  • PDF

Study on Parameters for Optimum Design of Integrated Subsea System (Subsea System 최적 설계 요소에 관한 연구)

  • Choi, Han-Suk;Do, Chang-Ho;Lee, Seung-Keon
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.49 no.4
    • /
    • pp.340-349
    • /
    • 2012
  • The mitigation of gap between technology and it's applicability in the oil and gas industry has led to a rapid development of deepwater resources. Historically, subsea wells have good track records. However, an ever increasing water depths and harsher environments being encountered are currently posing challenges to subsea production. Complex subsea systems are now being deployed in ways rarely encountered in previous development schemes. These increasingly complex systems present a number of technical challenges. This study presents the challenges in subsea production systems, considering the technical and safety issues in design and installation associated with current development modality.

A Study on the Optimization of Deburring Process for the Micro Channel using EP-MAP Hybrid Process (전해-자기 복합 가공을 이용한 마이크로 채널 디버링공정 최적화)

  • Lee, Sung-Ho;Kwak, Jae-Seob
    • Journal of the Korean Society of Manufacturing Technology Engineers
    • /
    • v.22 no.2
    • /
    • pp.298-303
    • /
    • 2013
  • Magnetic abrasive polishing is one of the most promising finishing methods applicable to complex surfaces. Nevertheless this process has a low efficiency when applied to very hardened materials. For this reason, EP-MAP hybrid process was developed. EP-MAP process is expected to machine complex and hardened materials. In this research, deburring process using EP-MAP hybrid process was proposed. EP-MAP deburring process is applied to micro channel, thereby it can obtain both deburring process and polishing process. EP-MAP deburring process on the micro channel was performed. Through design of experiment method, error of height in this process according to process parameter is analyzed. When the level 1 parameter A(magnetic flux density) and level 2 parameter B(electric potential), C(working gap) and level 3 parameter D(feed rate) are applied in the deburring process using EP-MAP hybrid process, it provides optimum result of EP-MAP hybrid deburring process.

Pedestrian Distribution in High-Rise Commercial Complexes: An Analysis of Integrating Spatial and Functional Factors

  • Xu, Leiqing;Xia, Zhengwei
    • International Journal of High-Rise Buildings
    • /
    • v.5 no.2
    • /
    • pp.95-103
    • /
    • 2016
  • One of the key problems in the design of high-rise commercial complex is how to guide reasonable pedestrian distribution in commercial space. In this study, pedestrian distribution in three high-rise commercial complexes in Shanghai and Hong Kong was studied using spatial configuration analysis software Space Syntax and quantification of physical elements in commercial spaces, such as functional attractiveness, entrances, escalators, level variations and passage width. Additionally, in an attempt to integrate functions with spatial integration and spatial depth, two combination variables, the spatial coefficient of function (IF) and spatial depth coefficient of function (F/D), were proposed. The results of the correlation analysis and multiple regression analyses reflected the following: (1) Regarding the influence on pedestrian distribution, there was a synergistic and complementary relationship between function and space; (2) The comprehensive flow distribution analytic model could successfully interpret flow distribution in high-rise commercial complexes and its R Square ranged up to about 70% in the three cases; (3) The spatial coefficient of function (IF) and spatial depth coefficient (F/D) could effectively integrate functions and spatial configuration, which could help close the gap between over-emphasis on function in commercial research and the lack of consideration of function in space-syntax analysis.

Design and Application of PMO-Based Project Management Systems (PMO 기반 프로젝트 관리 시스템의 설계 및 적용)

  • Jeong, Cheon-Su;Kim, Seung-Ryeol;Kim, Nam-Gyu
    • The Journal of Information Systems
    • /
    • v.20 no.4
    • /
    • pp.119-143
    • /
    • 2011
  • Recently, Information System (IS) development projects such as the next generation IS project of the financial business domain have shown tendency to become large and complex. Accordingly, a large number of enterprises have introduced a Project Management Office (PMO) to successfully manage multiple complex large-scaled projects. Many researches and empirical studies have proved the positive results of PMO-based projects. For example, most PMO-based projects have been accomplished successfully without exceeding the planned deadline and budget. However, even in the case of PMO-based projects, participants are still supported by legacy Project Management Systems (PMS) developed without considering the PMO. It implies that recent large projects are hardly performed efficiently because of the large gap between the legacy PMS tools developed only for single small projects and the real process of PMO-based project management. Therefore, we attempt to design and develop a PMO-based PMS in which the role and responsibility of PMO are completely implemented. To demonstrate our systems practicality, we applied the devised system to the real project management cases of "K" bank in The Republic of Korea. According to the results of case analysis, all of the four projects supported by our PMO-based PMS have been completed without exceeding planned deadline and budget, and the quality of their final outcome is appraised to be superior.