CONSTRUCTION MATERIAL MANAGEMENT USING SMART MOBILE COMPUTING

  • Kwang-Pyo Lee;Hyun-Soo Lee;Moonseo Park
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.221-228
    • /
    • 2011
  • As construction works have become larger and more complex, improving productivity by introducing Information Technology (IT) is pursued and more effective construction management is needed in construction industry. In this circumstance, many different kinds of project management system is being introduced, and various IT technologies are applied such as Personal Digital Assistant (PDA), Bar Code, Radio Frequency Identification (RFID), Web Camera, and so on. However, these kinds of technologies might cause re-processing of information and ineffectiveness of project because of lack of real time information processing technology or separation between construction sites and management offices. Meanwhile, these technologies rather decrease the construction productivity except for the data saving and database function. Therefore, this research aims to develop Application that can be applied efficiently for construction material management, by understanding problems of former management system with questionnaires and extracting functions with analysis of requirements. In virtue of the construction material management Application which will be developed in this study, it will be possible to input information automatically, to process and check material information in real time, and to identify the location of necessary material. Then, the problem of separation between construction sites and management offices are solved, and as a result, more efficient management of materials in construction sites will become possible. At the same time, this study will investigate the possibility and applicability of new IT device, Smart Phone to construction sites.

  • PDF

A Risk Performance Measurement System for the Construction Project

  • Seon Gyoo Kim;Jin Bong Kim;Moon Serk Young;Bong Cheol Jeon;Han Kim;Young Jeong Yu
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1591-1598
    • /
    • 2009
  • Recently, the researches on the urban regeneration projects have been performed very actively. It is a part of the effort that solves some social and economical problems occurred by deteriorated buildings and degraded infrastructures through new urban regeneration projects or redevelopment projects. However, the urban regeneration projects show the characteristics that can not guarantee in the project performance because the projects have various and complex stakeholders related to these projects and are exposed to lots of risks due to its huge scale. This study proposed the risk performance index method to improve the efficiency of the overall performance measurement for a mega-project by extending from the traditional cost/schedule based performance measurement system. The risk performance index method proposed in this study has a similar system to the EVMS, and makes possible to perform a three dimensional integrated performance measurement in cost/schedule/risk through 18 different indexes that compose the risk performance index.

  • PDF

원가산정을 위한 표준분류체계 활용한 지식체계 개발 (Knowledge Structure for Cost Estimates Based on Standardized Cost Database)

  • 임혜경;강남희;최재현
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.235-236
    • /
    • 2016
  • The importance of construction management has been increasing due to the fact that complex construction projects blend several different industries depending on the traits of the construction. This research was conducted to search for a method to enhance efficiency in cost management of construction project and meet the need for reusability of accumulated construction information. The process of detailed estimation and methodology for using standard unit price information has been developed to strengthen the interoperability in cost information by utilizing a standard classification system. The concept of ontology is proposed as a method of connecting construction information based on a standard breakdown structure to increasing the connectivity of the cost information in the construction project. Therefore, construction information knowledge framework is developed in order to improve the efficiency of the detailed estimation work process.

  • PDF

공사 진척관리 현황분석을 통한 진척관리 개선방안에 관한 연구 (A Study on the Improvement through Analysis with Present Condition of Progress Management for Construction Project)

  • 박원호;심재광;윤석헌
    • 한국건축시공학회지
    • /
    • 제10권3호
    • /
    • pp.137-144
    • /
    • 2010
  • 건설 프로젝트가 대형 복잡화가 되어짐에 따라 프로젝트의 공정관리의 중요성이 대두되고 있다. 프로젝트 공정관리 기술은 한국에서 널리 사용되고 있지 않지만 점차적으로 증가하고 있는 추세다. 요즘 대부분의 연구 프로젝트들도 공정쪽에 초점을 두고 있다. 프로젝트 진척관리 또한 프로젝트 공정관리의 하나로써 매우 중요하다. 이에 본 연구에서는 국내 진척관리의 상태를 분석하기로 하며 진척관리의 현재 상태에 대해 전문가와 현장사람들에 대한 인터뷰를 진행하였다. 본 연구는 질적, 양적으로 프로젝트 진척분석을 위한 방법으로 BIM 기반의 진척관리를 제안하고 있다. 현재 BIM은 설계, 시공, 유지관리단계등에서 사용되고 있으며 또한 BIM을 이용한 진척관리는 프로젝트에 대해 이해하고 정확성을 키우는데 이바지 할 것이라고 생각된다.

LNG 공사의 건설사업관리 의사결정지원모델 개발 - 시공단계 중심 - (Development of a Decision Making Model for Construction Management in LNG Plant Construction - Focused on Construction Stage -)

  • 박환표;한재구;진경호
    • 한국건설관리학회논문집
    • /
    • 제15권3호
    • /
    • pp.47-57
    • /
    • 2014
  • LNG 플랜트사업은 그 특성상 해외에서 사업을 추진하기 때문에 사업관리도 일반적인 사업관리방식과는 차이점이 있다. LNG 플랜트 사업 프로세스는 가스탐사 및 생산, 물리적인 액화 및 화학적인 전환공정, 수송, 저장 등의 가치사슬로 구성되며, 주로 천연가스를 액체원료나 연료로 전환하는 장치를 중심으로 액화공정(초저온 액화) 및 FEED 패키지, 제어 운영, 건설수행 등 EPC 기술을 대상으로 하고 있다. 이러한 해외에서 수행되고 복잡한 LNG 플랜트공사의 성공은 사업관리 의사결정에 따른 사업의 성패가 달라질 수 있다. 따라서 본 연구는 LNG 플랜트공사의 시공단계 사업관리 의사결정지원 모델을 구축하기 위하여 EPC 단계별로 9개의 사업관리요소 항목을 도출하고, 각 항목별 중요도를 평가하였다. 중요도 평가결과, EPC 단계별로 사업관리와 리스크관리 항목이 공통적으로 중요한 것으로 도출되었다. 특히 본 연구는 사업관리 요소항목과 중요도 평가결과를 기반으로 LNG 플랜트공사의 시공단계의 의사결정지원모델을 개발하였다. 개발된 의사결정지원모델은 향후 시공단계의 사업관리 의사결정지원 시스템 구축의 기반이 될 것이다.

사회연결망분석을 이용한 건축공사 현장조직의 신뢰도네트워크 분석 (Analysis of Reliability Network in Construction Organizations Using SNA)

  • 박용규;김재엽
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.199-201
    • /
    • 2013
  • In a construction project in which cooperation among project members gets its importance, trust among construction site members should be foundation to enhance team spirit and achievement. This study analyzes the trust network among staff by using social network analysis (SNA) theory for organizations in apartment complex construction sites in Korea. The analysis illustrates higher level of trust for those positioning in the higher positions in hierarchy and having greater experiences. It might be attributable to own features of construction works where skills are acquired by site experience.

  • PDF

Basic Research on Nuclear Power Plant Construction Claims and Dispute Management Processes Development

  • Son, HyeJin;Lee, SangHyun;Byon, SuJin
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.710-711
    • /
    • 2015
  • A nuclear power plant construction is a complex form of construction which comprises various stakeholders and contractors. Therefore, contract disputes will occur due to conflicting interests of contracting parties and unpredictable factors which arise during construction work. Even if the contract is well prepared, it cannot fully prepare for future situations in actuality. Claims management is very important in carrying out construction management. This study intends to define claim, and delve into development of claims management processes from the viewpoint of owners and contractor through consideration on international contract terms on claims management and the details of the claims management of the Construction Extension to the PMBOK. In addition, it is needed to accumulate and manage data on claims that have occurred so that they can be referenced in the future. As information should be accumulated so that type classification can be carried out and that lessons can be learned on claims that have occurred in each business site, study on establishing data-based systems relating to claims processes will be needed in the future.

  • PDF

FRAMEWORK FOR HIGHLY INTEGRATED, INTEROPERABLE CONSTRUCTION SIMULATION ENVIRONMENTS

  • Simaan M. AbouRizk
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.71-82
    • /
    • 2009
  • This paper describes the use of a highly interactive and inter-operative application for complex simulation environments, or Synthetic Environments (SE), as deployed for construction as Construction Synthetic Environments (CSE). Based on the High Level Architecture (HLA), this research focuses on implementing simulation technology in a software environment, COSYE, that will be the foundation for building CSE applications. This framework is discussed in the context of tunneling and industrial construction applications, including steel fabrication and pipe-spool manufacture. The framework is demonstrated using the NEST sanitary tunnel project in Edmonton, Canada, in which COSYE was used for scenario-based analysis and planning.

  • PDF

Profit-oriented Impact Analysis of Demand Management Strategy on Design-Build Firms Using System Dynamics

  • Yoo, Wi-Sung
    • 한국건축시공학회지
    • /
    • 제12권2호
    • /
    • pp.169-182
    • /
    • 2012
  • In the past, a strategic management of work demands has been increasingly challenged to design-build (DB) firms. Such a management is capable of providing sufficient profitable impact of a project on them. Total project profit is mainly related to actual resources, work completion time, amount of rework, and costs. The degree of recycling work packages in the DB project delivery system is used as a measure of the quality of the performed work. However, there are few models available to evaluate the impact of a demand management strategy on the DB firms and to predict its behavior. We propose a decision-making support model as an aid for assessing the amount of rework and for predicting project profit resulting in a convincible demand management strategy. This model is constructed by using a dynamic feedback approach that can analyze the problems arising in complex managerial systems. For the purpose of illustration, widely acceptable strategies were applied into the model to explore their impacts on the DB firms. The results indicate that the model is helpful for the managers in selecting the most appropriate demand management strategy for successfully achieving their objectives.

초고층 주상복합 건물의 개발사업 단계에 따른 주변지역 아파트가격의 변화에 관한 연구 (A Study on the Changes of the Apartment price in Accordance with Project process of Super high-rise mixed use buildings)

  • 김상환;최원철;김주형;김재준
    • KIEAE Journal
    • /
    • 제10권5호
    • /
    • pp.159-164
    • /
    • 2010
  • High-rising buildings are a sort of solution to recent cities. Till now real estate development was concentrated in new development on vacant lots, and it resulted urban sprawl. Generally large cities are confronted with the exodus of industry and population from city. High-rising buildings solve many problems associated with this problem. The purpose of this research is to identify the effect of super high-rise mixed use building project process on apartment price. For this study, the hypothesis is that price of apartments is influenced by project process of super high-rise mixed use building. The study concerned 4 variations of project process that is building permits stage, sale stage, construction starting stage and stage of moving into building. The target projects of buildings are selected by number of floor(over 40 floors) and construction time. And 48 apartment complex are selected around super high-rise mixed use building. This study uses hedonic price function to analysis effect of project process of super high-rise mixed use building. A price of apartments is defined as a dependent variable. Characteristics of residence, complex, district and super high-rise building are defined as independent variables. The results are as follows; first, there is no error in price model of this study. Second, it is found that apartment price was influenced negatively by building permit stage and sale stage of super high-rise mixed use building. But that was influenced positively by construction starting stage and stage of moving into building of that. Third, as the project process of super high-rise mixed use building was proceeded, price of apartments was increased.