The ultimate goal of construction is to complete the given work in the most economical and safest way within the required construction period while meeting the quality standards specified in the design drawing. There are a few characteristics of finish work. First, executed in subdivided processes, finish work involves a very diverse and complex structure. Second, there are no criteria for each segmented process with regard to the appropriate time of input. Third, it is not very necessary to set priorities for lead and lag works. This study intends to provide information on the completion of a project in accordance with the required duration by setting priorities in the delay of each detailed process of finish work to minimize delay in finish work. In this study, finish work is divided into wet work and other types of finish work, and the importance of each process is classified based on the given details of each process. In addition, the study employs a survey to analyze delay factors of a designer, a constructor, and a supplier. Using the survey results, the study sets priorities in delay of final work to provide information on the completion of an apartment project within the planned construction period.
Background: Return to work after treatment completion is important for both cancer survivors and society. Financial distress is one of the factors that may influence the return to work in cancer survivors. However, this relationship has not been well investigated. This study aimed to determine the rate of return to work and its relation to financial distress among Iranian cancer survivors. Materials and Methods: This descriptive-correlational study was undertaken among 165 cancer survivors who completed their initial treatments and had no signs of active cancer. The Return to Work questionnaire and Financial Distress/Financial Well-Being Scale were used for data collection. Data were analyzed using SPSS statistical software. Results: After initial treatments, 120 cancer survivors (72%) had returned to work, of which 50 patients (42%) had returned to full-time work and 70 (58%) reduced their work hours and returned to part-time work. Cancer survivors also reported high levels of financial distress. In addition, the financial distress was lower among patients who had returned completely to work, in comparison to patients who had quit working for cancer-related reasons (p= 0.001) or returned to work as part-time workers (p=0.001). Conclusions: The findings showed that a high percent of Iranian cancer survivors had not returned to their jobs or considerably reduced working hours after treatment completion. Accordingly, due to high levels of financial distress experienced by participants and its relation to return to work, designing rehabilitation programs to facilitate cancer survivor return to work should be considered.
A construction project with a total construction cost of over 10 billion KRW should be evaluated whether construction works are appropriately executed. The evaluation is carried out on quality management, process management, construction management, safety management, environmental management. The implementation period is within 60 days after completion of construction of the construction, from the time when the construction rate of the construction work has progressed by more than 90% to the construction cost. However, the participating construction engineers should prepare the evaluation within the period according to the evaluation criteria, but there are difficulties in preparation for the evaluation due to the reasons such as the change of engineers in charge and loss of data. Therefore, this study proposes the procedure of construction evaluation and adjusts timing of construction evaluation.
The 2th International Conference on Construction Engineering and Project Management
/
pp.376-385
/
2007
Construction project is necessary element for human life to upgrade the quality and convenience. However, due to its contradictory nature to the environment preservation, environmental pollution and damage, deterioration of natural scenery, noise/vibration, water quality pollution, etc. caused in the process of construction greatly affect the environment. For the building or construction project, its possible impact on environment during construction work and after completion must be predicted at its design phase, which will result in the completion of the architecture convenient for human being with its environmental pollution reduced to minimum level. In this study, the checklist of environmental factors was suggested, which should be taken into account at its design phase in conducting the construction work. Proposed checklist was linked with the developed web-based system for the convenience of users like designer and construction manager, etc. It is expected that the checklist suggested by this study will help the designer and construction manager to continue the steady development from the environmental viewpoint during the design phase.
2018년 일학습병행에 PBL(Project Based Learning) 방식이 P-Tech 유형에 처음 도입된 이후 2020년 시범사업으로 운영되고 있는 학위연계형 고숙련마이스터 과정에도 도입되면서 각 학과에서는 PBL 운영 규정에 맞게 표준이수체계를 개편하며, 그에 맞게 PBL 기반의 학습 및 훈련과정을 개발하여 운영하고 있다. 2021년 일학습병행 PBL의 확대 시행에 따라 그 운영 규정은 더욱 정교하게 개정되었다. 본 논문에서는 문헌연구를 통해 일학습병행 PBL의 특성, 학위연계형 고숙련마이스터 과정의 운영 절차 별 PBL 운영 규정과 가장 최근 시행된 PBL 운영 규정의 변경 내용을 상세히 고찰하였다. 이러한 사전 연구를 기반으로 한국기술교육대학교 IT융합SW공학과의 PBL 기반 표준이수체계 도출 과정 및 개발 결과, 운영 이후 표준이수체계의 적합성 검증을 위해 수행한 설문 조사 결과 사례를 소개하고, 변경되고 있는 일학습병행 PBL 운영 규정과 관련한 학위연계형 고숙련마이스터 과정의 도전 과제와 바람직한 개선 방향을 제시하였다. 본 연구는 대학에서 일학습병행 PBL을 원활하게 적용하기 위한 훈련과정개발의 참조를 제공할 수 있다. 또한 고숙련마이스터 과정을 포함하여 일학습병행의 PBL이 어떻게 발전해 나아가야 하는지에 대한 담론을 제시함으로써 일학습병행의 특성이 잘 반영된 고유의 PBL 제도 정착 및 안정적 확산에 기여할 것으로 사료된다.
KSII Transactions on Internet and Information Systems (TIIS)
/
제14권1호
/
pp.183-200
/
2020
This paper presents an efficient interactive framework for perspective scene completion and editing tasks, which are available largely in the real world but rarely studied in the field of image completion. Considering that it is quite hard to extract perspective information from a single image, this work starts from a friendly and portable interactive platform to obtain the basic perspective data. Then, in order to make this interface less sensitive, easier and more flexible, a perspective-rectification based correction mechanism is proposed to iteratively update the locations of the initial points selected by users. At last, a complanate mesh is generated by the geometry calculations from these corrected initial positions. This mesh must approximate the perspective direction and the structure topology as much as possible so that the filling process can be conducted under the constraint of the perspective effects of the original image. Our experiments show the results with good qualities and performances, and also demonstrate the validity of our approaches by various perspective scenes and images.
In any form of construction work, it is essential that accidents be prevented at every stage from foundation preparation to build completion. For this, it is necessary to use models that can assess risk and provide instruction for safe work processes so that the risk of accidents is reduced. Currently, however, very few models can perform these tasks. In this paper, we presents a model that assesses risk quantitatively by analyzing risk factors involved in stage of construction such as foundation work, erection work, structural work, equipment work, finishing work and etc work. The model performs assessment based on examples of accidents and by investing actual conditions during construction. In addition, we presents in this paper a safety management system was developed to assess risk during construction and to effectively train laborers.
The current evaluation time period for the construction management service is the project completion or after project completion. Therefore, the construction manager has the following problems. First, it is difficult to prepare the evaluation due to the new field movement of the existing participating engineer. Next, the CM work is complex as well as extensive. Therefore, the critical success factors of the construction technology services evaluation are required as a systematic performance standard of CM work. In this study, we extracted the critical success factors that can systematically prepare the evaluation from the early stage of the project through in - depth interviews with experts. And, this study was analyze the priority of each factor by using AHP technique. As a result, the most important factors were related to the systemization of the preparation process, the construction manager work capabilities and practical construction management. And the priorities of all factors were analyzed high in the factors suggested by the owner groups. The results of this analysis are expected to provide the standards that construction management service performer carry out structured management of construction management throughout the project.
국내 건설기업들은 체계적이고 효율적인 공정관리를 위한 여러 가지 관리기법 및 도구들을 개발하여 실무에 도입하고 있다. 하지만, 이러한 공정관리 기법 및 도구들의 도입에도 불구하고 건설 현장 내에서 발생하는 계획 대비 공사진척율은 상당한 차이를 보이고 있다. 본 연구는 통제 가능한 관리요소 중 공정관리 프로세스 상에 한계점과 공정관리도구들의 미비한 활용에 초점을 맞추어 국내 건설 현장의 공정관리 실태를 분석함으로써 공정관리 프로세스 및 공정관리 도구의 문제점 및 개선방안을 제시하고자 한다.
In any form of construction work, it is essential that accidents be prevented at every stage, from foundation preparation to build completion. For this, it is necessary to use models that can assess risk and provide instructions for safe work processes so that the risk of accidents is reduced. Currently, however, very few models can perform these tasks. In this paper, we present a model that assesses risk quantitatively by analyzing the risk factors involved in each stage of construction, such as foundation work, temporary work, structural work, equipment work, and finishing work. The model performs assessment based on examples of accidents and by investigating actual conditions during construction. In addition, we present in this paper a safety management system developed to assess risk during construction and to effectively train laborers.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.