• Title/Summary/Keyword: completion of work

Search Result 277, Processing Time 0.029 seconds

Delay Factors Based on the Importance of Finish Work in Apartment Construction Project (공동주택 마감공사 중요도 기반 작업지연 요인 분석)

  • Lee, Seung-Hoon;Lee, Sang-Hyo;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.125-129
    • /
    • 2010
  • The ultimate goal of construction is to complete the given work in the most economical and safest way within the required construction period while meeting the quality standards specified in the design drawing. There are a few characteristics of finish work. First, executed in subdivided processes, finish work involves a very diverse and complex structure. Second, there are no criteria for each segmented process with regard to the appropriate time of input. Third, it is not very necessary to set priorities for lead and lag works. This study intends to provide information on the completion of a project in accordance with the required duration by setting priorities in the delay of each detailed process of finish work to minimize delay in finish work. In this study, finish work is divided into wet work and other types of finish work, and the importance of each process is classified based on the given details of each process. In addition, the study employs a survey to analyze delay factors of a designer, a constructor, and a supplier. Using the survey results, the study sets priorities in delay of final work to provide information on the completion of an apartment project within the planned construction period.

  • PDF

Return to Work and Its Relation to Financial Distress among Iranian Cancer Survivors

  • Ghasempour, Mostafa;Rahmani, Azad;Davoodi, Arefeh;Sheikhalipour, Zahra;Ziaeei, Jamal Evazie;Abri, Fariba
    • Asian Pacific Journal of Cancer Prevention
    • /
    • v.16 no.6
    • /
    • pp.2257-2261
    • /
    • 2015
  • Background: Return to work after treatment completion is important for both cancer survivors and society. Financial distress is one of the factors that may influence the return to work in cancer survivors. However, this relationship has not been well investigated. This study aimed to determine the rate of return to work and its relation to financial distress among Iranian cancer survivors. Materials and Methods: This descriptive-correlational study was undertaken among 165 cancer survivors who completed their initial treatments and had no signs of active cancer. The Return to Work questionnaire and Financial Distress/Financial Well-Being Scale were used for data collection. Data were analyzed using SPSS statistical software. Results: After initial treatments, 120 cancer survivors (72%) had returned to work, of which 50 patients (42%) had returned to full-time work and 70 (58%) reduced their work hours and returned to part-time work. Cancer survivors also reported high levels of financial distress. In addition, the financial distress was lower among patients who had returned completely to work, in comparison to patients who had quit working for cancer-related reasons (p= 0.001) or returned to work as part-time workers (p=0.001). Conclusions: The findings showed that a high percent of Iranian cancer survivors had not returned to their jobs or considerably reduced working hours after treatment completion. Accordingly, due to high levels of financial distress experienced by participants and its relation to return to work, designing rehabilitation programs to facilitate cancer survivor return to work should be considered.

Adjust timing of Construction Construction Evaluation (건설공사 시공평가 시기 조정)

  • Yoon, Ji-Ho;Nam, Keong-Woo;Jang, Myung-Houn
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.78-79
    • /
    • 2019
  • A construction project with a total construction cost of over 10 billion KRW should be evaluated whether construction works are appropriately executed. The evaluation is carried out on quality management, process management, construction management, safety management, environmental management. The implementation period is within 60 days after completion of construction of the construction, from the time when the construction rate of the construction work has progressed by more than 90% to the construction cost. However, the participating construction engineers should prepare the evaluation within the period according to the evaluation criteria, but there are difficulties in preparation for the evaluation due to the reasons such as the change of engineers in charge and loss of data. Therefore, this study proposes the procedure of construction evaluation and adjusts timing of construction evaluation.

  • PDF

CHECKLIST FOR ENVIRONMENTAL FRIENDLY CONSTRUCTION MANAGEMENT IN DESIGN PHASE

  • In-Su Jung;Hyun-Su Park;Chan-Sik Lee
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.376-385
    • /
    • 2007
  • Construction project is necessary element for human life to upgrade the quality and convenience. However, due to its contradictory nature to the environment preservation, environmental pollution and damage, deterioration of natural scenery, noise/vibration, water quality pollution, etc. caused in the process of construction greatly affect the environment. For the building or construction project, its possible impact on environment during construction work and after completion must be predicted at its design phase, which will result in the completion of the architecture convenient for human being with its environmental pollution reduced to minimum level. In this study, the checklist of environmental factors was suggested, which should be taken into account at its design phase in conducting the construction work. Proposed checklist was linked with the developed web-based system for the convenience of users like designer and construction manager, etc. It is expected that the checklist suggested by this study will help the designer and construction manager to continue the steady development from the environmental viewpoint during the design phase.

  • PDF

Suggestion of Challenges and Improvement Direction for the Degree-Linked High-Skilled Professional Course in Accordance with the Full Expansion of the Work-Study Combination PBL (일학습병행 PBL 확대에 따른 학위연계형 고숙련마이스터 과정의 과제와 개선방향 제안)

  • Lee, Seung-Jun;Kim, Seung-Hee
    • Journal of Practical Engineering Education
    • /
    • v.14 no.1
    • /
    • pp.179-194
    • /
    • 2022
  • After the work-study combination PBL method was first introduced into the P-Tech type in 2018, it was introduced into the degree-linked high-skilled professional course in operation as a pilot project in 2020, and ever since each department has reorganized the standard completion system to meet the PBL operation regulations and developed and operated PBL-based learning and training courses accordingly. With the expansion of the work-study combination PBL in 2021, the operating regulations were revised more elaborately. This paper examined the characteristics of the work-study combination PBL, the PBL operation regulations for each degree-linked high-skilled professional course, and the most recently implemented PBL operation regulations in detail through literature research. Based on this research, it introduced the development process and the result of the PBL-based standard completion system by the IT Convergence SW Engineering Department of KOREATECH and the result of the survey conducted to verify the suitability of the standard completion system after an operation and presented the challenges and improvements required for the degree-linked high-skilled professional course in relation to the changing operation regulations for the work-study combination PBL. This study is expected to provide universities with a reference to the development of training courses to smoothly apply the work-study combination PBL. It is also expected to contribute to the establishment and steady expansion of a unique PBL system that reflects the characteristics of work-study combination by presenting discourses on how the work-study combination PBL should develop, including high-skilled professional courses.

An Interactive Perspective Scene Completion Framework Guided by Complanate Mesh

  • Hao, Chuanyan;Jin, Zilong;Yang, Zhixin;Chen, Yadang
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.14 no.1
    • /
    • pp.183-200
    • /
    • 2020
  • This paper presents an efficient interactive framework for perspective scene completion and editing tasks, which are available largely in the real world but rarely studied in the field of image completion. Considering that it is quite hard to extract perspective information from a single image, this work starts from a friendly and portable interactive platform to obtain the basic perspective data. Then, in order to make this interface less sensitive, easier and more flexible, a perspective-rectification based correction mechanism is proposed to iteratively update the locations of the initial points selected by users. At last, a complanate mesh is generated by the geometry calculations from these corrected initial positions. This mesh must approximate the perspective direction and the structure topology as much as possible so that the filling process can be conducted under the constraint of the perspective effects of the original image. Our experiments show the results with good qualities and performances, and also demonstrate the validity of our approaches by various perspective scenes and images.

Safety Management Information System in Construction Work;Focus on Tunnel Work (건설공사의 안전관리정보시스템 개발;터널공사 중심으로)

  • Park, Jong-Keun;paik, Shin-Won
    • Journal of the Korean Society of Safety
    • /
    • v.23 no.4
    • /
    • pp.72-78
    • /
    • 2008
  • In any form of construction work, it is essential that accidents be prevented at every stage from foundation preparation to build completion. For this, it is necessary to use models that can assess risk and provide instruction for safe work processes so that the risk of accidents is reduced. Currently, however, very few models can perform these tasks. In this paper, we presents a model that assesses risk quantitatively by analyzing risk factors involved in stage of construction such as foundation work, erection work, structural work, equipment work, finishing work and etc work. The model performs assessment based on examples of accidents and by investing actual conditions during construction. In addition, we presents in this paper a safety management system was developed to assess risk during construction and to effectively train laborers.

CSFs Extraction and AHP Importance Analysis for Construction Technology Services Evaluation in terms of Construction Manager (건설사업관리자(CMr) 측면에서 건설기술용역 평가의 CSFs 추출 및 AHP 중요도 분석)

  • Yang, Jin-Kook;Hong, Seong-Wook
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.36 no.3
    • /
    • pp.129-134
    • /
    • 2020
  • The current evaluation time period for the construction management service is the project completion or after project completion. Therefore, the construction manager has the following problems. First, it is difficult to prepare the evaluation due to the new field movement of the existing participating engineer. Next, the CM work is complex as well as extensive. Therefore, the critical success factors of the construction technology services evaluation are required as a systematic performance standard of CM work. In this study, we extracted the critical success factors that can systematically prepare the evaluation from the early stage of the project through in - depth interviews with experts. And, this study was analyze the priority of each factor by using AHP technique. As a result, the most important factors were related to the systemization of the preparation process, the construction manager work capabilities and practical construction management. And the priorities of all factors were analyzed high in the factors suggested by the owner groups. The results of this analysis are expected to provide the standards that construction management service performer carry out structured management of construction management throughout the project.

The Survey of Time Management Status in the Domestic Construction Site (국내 건설현장의 공정관리 현황 실태 조사)

  • Yoon, Byung-Sik;Lim, Chul-Woo;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.578-582
    • /
    • 2008
  • The domestic construction companies have implemented a various of management methodology and tools for time management. However, the work completion rate versus work plan have a big difference with the planned work completion rate previously despite of implementing the time management methodology and tools. The research searches the problems that the previous time management process and tools focusing on the management factors that can be controlled. Also, It suggest the improvement direction for these limits.

  • PDF

Safety Management Information System in Construction Work - Focus on Apartment Work - (건설공사의 안전관리정보시스템 개발 - 아파트공사 중심으로 -)

  • Park, Jong-Keun
    • Journal of the Korean Society of Safety
    • /
    • v.24 no.6
    • /
    • pp.124-131
    • /
    • 2009
  • In any form of construction work, it is essential that accidents be prevented at every stage, from foundation preparation to build completion. For this, it is necessary to use models that can assess risk and provide instructions for safe work processes so that the risk of accidents is reduced. Currently, however, very few models can perform these tasks. In this paper, we present a model that assesses risk quantitatively by analyzing the risk factors involved in each stage of construction, such as foundation work, temporary work, structural work, equipment work, and finishing work. The model performs assessment based on examples of accidents and by investigating actual conditions during construction. In addition, we present in this paper a safety management system developed to assess risk during construction and to effectively train laborers.