• Title/Summary/Keyword: completion inspection

Search Result 56, Processing Time 0.062 seconds

Preliminary Analysis on Artificial Intelligence-based Methodology for Selecting Repair and Rehabilitation Methods of Bridges (인공지능 기반의 교량 보수공법 선정 기술 개발을 위한 선행 분석)

  • Kim, Jonghyeob;Jung, In-Su;Yun, Won-Gun;Kim, Jung-Yeol;Park, In-Seok
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.24 no.6_2
    • /
    • pp.861-872
    • /
    • 2021
  • An efficient cost management is important for the domestic social overhead capital(SOC) based on a long lifecycle after 30 years since completion. Maintenance in South Korea have had the restrictions of consistency and suitability of decision-making by the establishment of a budget plan based on the company estimate and repair and reinforcement methods determined by the inspection and diagnosis engineers' subjective determination for each facility. To resolve this issue, the Korea Institute of Civil Engineering and Building Technology is currently in development of a methodology to propose an optimum maintenance method according to the damage of components by artificial intelligence. This study has deduced the primary factors by analyzing information generated during bridge maintenance and management as a prior step for the development of technologies, and conducted a preliminary analysis to select the optimum artificial intelligence technology.

Stress Variation Characteristics of Temporary Fixed Steel Rod in FCM Bridge Construction Method (FCM 교량 가설 공법에서 임시 고정 강봉의 응력 변화 특성 )

  • Hyun-Euk Kang;Wan-Shin Park;Young-Il Jang;Sun-Woo Kim;Hyun-Do Yun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.27 no.3
    • /
    • pp.21-29
    • /
    • 2023
  • In this study, the stress characteristics of temporary fixed steel rods were analyzed in the "temporary fixing system using internal prestressing tension", which is mainly applied to the construction of superstructures by FCM. It was difficult to confirm the changes in initial tensile force in this system because the steel rod was internally connected to the pier and the PSC BOX. Therefore, measurement was performed before and after the completion of each segment using an FBG sensor to measure the change in the micro length of the steel rod. The results of the analysis showed that 75% to 90% of the maximum vertical contraction of the steel rod that occurred until the completion of the cantilever segment occurred in the fixing ~ 1segment, and the maximum loss of initial prestressing force was 39%. Such excessive loss of tension force to 1 segment means that tension is needed to improve the precision of construction during the fixation, and re-tension is needed to secure stability for conduction of cantilever segments after the completion of 1segment. In the 2 ~ last segment, the stress of the steel rod decreased gradually, and in the summer, the decrease in stress tended to partially recover due to the increase in the length of the steel rod corresponding to the increase in the vertical volume of PSC BOX. The dominant factor in the stress change in 2~ last segment in this phenomenon is judged to be the change in the length of the steel rod according to the temperature. Unlike the change in length, the relaxation was 1.2-2.7%, which was mostly offset by the opposite stress corresponding to the temperature stress. Therefore, a plan was proposed to improve the internal stress, such as adjusting the fixation time.

Development of Robotic Inspection System over Bridge Superstructure (교량 상판 하부 안전점검 로봇개발)

  • Nam Soon-Sung;Jang Jung-Whan;Yang Kyung-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.180-185
    • /
    • 2003
  • The increase of traffic over a bridge has been emerged as one of the most severe problems in view of bridge maintenance, since the load effect caused by the vehicle passage over the bridge has brought out a long-term damage to bridge structure, and it is nearly impossible to maintain operational serviceability of bridge to user's satisfactory level without any concern on bridge maintenance at the phase of completion. Moreover, bridge maintenance operation should be performed by regular inspection over the bridge to prevent structural malfunction or unexpected accidents front breaking out by monitoring on cracks or deformations during service. Therefore, technical breakthrough related to this uninterested field of bridge maintenance leading the public to the turning point of recognition is desperately needed. This study has the aim of development on automated inspection system to lower surface of bridge superstructures to replace the conventional system of bridge inspection with the naked eye, where the monitoring staff is directly on board to refractive or other type of maintenance .vehicles, with which it is expected that we can solve the problems essentially where the results of inspection are varied to change with subjective manlier from monitoring staff, increase stabilities in safety during the inspection, and make contribution to construct data base by providing objective and quantitative data and materials through image processing method over data captured by cameras. By this system it is also expected that objective estimation over the right time of maintenance and reinforcement work will lead enormous decrease in maintenance cost.

  • PDF

The Inhibitive Effect of Electrochemical Treatment Applied to Fresh/hardened Concrete (철근 부식 방식을 위한 굳지 않은/굳은 콘크리트의 전기방식 적용에 관한 연구)

  • Kim, Sung-Wook;Moon, Jae-Heum;Ann, Ki-Yong
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.17 no.5
    • /
    • pp.67-76
    • /
    • 2013
  • In this study, the inhibitive effect of electrochemical treatment subjected to fresh and hardened concrete and literature reviews in terms of the treatment were performed. In hardened concrete, chloride ions are mixed during casting to destroy the passivity of steel, and then the current was provided for 2 weeks with 250, 500 and $750mA/m^2$. After completion of electrochemical treatment, the extraction of chloride ions was quantified and repassivation of steel was observed. Simultaneously, the equated levels of current density for 2 weeks were applied to fresh concrete. Steel-concrete interface in concrete was observed by BSE image analysis and the concrete properties in terms of the diffusivity of chloride ions and the resistance of steel corrosion was measured. As the result, electrochemical treatment is very effectiveness to rehabilitate the passive film on the steel surface and 63-73% of chloride ions in concrete were extracted by the treatment. As the treatment was applied to fresh concrete, the resistance of steel corrosion was improved due to the densification of $Ca(OH)_2$ layers in the vicinity of steel. However, an increase in the current density resulted in an increase in surface chloride content of concrete.

The Effect of Composite Ratio and Wall Thickness on the Shear Behavior of Composite Basement Wall (합성율과 벽체두께가 합성지하벽의 전단거동에 미치는 영향)

  • Seo, Soo-Yeon;Kim, Seong-Soo;Yoon, Yong-Dae
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.14 no.1
    • /
    • pp.93-101
    • /
    • 2010
  • When doing underground excavation works for the purpose of constructing large underground structures for a building in the limited space in downtown area, the stability of the adjacent ground must be top priority, and to accomplish this, it is essential to review the retaining wall construction carefully. H-Pile, which has been mainly used as a stress-carrying material in temporary earth-retaining structures, is most likely to be abandoned after completion of the works for the basement exterior wall in relation to contiguous bored piles, so it will result in a waste of material. To improve this situation, Basement Composite Wall where H-Pile and basement wall are compounded, has been developed. This wall is being used most frequently in many local construction sites. In this study, five specimens are made in order to evaluate the shear resistance of the basement composite wall and tested. Test parameter is the composition ratio and wall thickness according to shear connectors. Test result shows that the shear strength is improved when the composite ratio is increased but the magnitude is not much. A formula, which considers the contribution of concrete, web of H-pile as well as flange' effect in calculation of shear strength of composite basement wall, is suggested and used to calculation of the strength of specimens. It is found that there is a good co-relation between test result and the calculated one by the formula.

Research on Vibration and Noise Characteristics of Steel Plate Girder Bridge with Embedded Rail Track System (레일매립궤도 시스템이 적용된 판형교의 진동 및 소음특성에 대한 연구)

  • Park, Jeung-Geun;Koh, Hyo-In;Kang, Yun-Suk;Jeong, Young-Do;Yi, Seong-Tae
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.23 no.1
    • /
    • pp.94-101
    • /
    • 2019
  • Most of the existing rail structures have undergone a lot of aging since a considerable period of time has passed from completion. In particular, among existing railway bridges, many of the plate girder bridges are older bridges that have lived 40 to 60 years or more. Since the treadmill is directly connected to the girder without the ballast, the running load of the vehicle is directly transmitted to the bridge. Therefore, the shock and noise applied to the bridge are larger than those of the ballast bridge, and the dynamic shock and vibration are also relatively large. Therefore, it is very urgent to develop appropriate maintenance, repair and reinforcement technology for existing steel plate bridge. In this study, the authors introduced the characteristics of embedded rail (ERS) developed for improving the performance of the existing plate girder bridge and the techniques solving the vibration and noise problems. In order to evaluate the vibration and noise reduction performance of ERS, a non-ballast plate girder bridge with 5m length of sleepers installed and a plate girder bridge with ERS were fabricated. And, then, the vibration response generated under the same excitation condition was measured and analyzed. Also, the radiated noise analysis was performed using the vibration response data obtained from the experiment as the input data of the acoustic analysis model. As a result of experiments and analyses, it was confirmed that the plate girder bridge's vibration using ERS was reduced by 15.0~18.8dB and the average noise was reduced by 7.7dB(A) more than the non-ballast bridge.

Effects of Seismic Loads with Different Return Period on Residential Building with RC Shear Wall Structure under Construction (주거용 RC 벽식 건물의 시공 중 재현주기에 따른 지진하중의 영향)

  • Choi, Seong-Hyeon;Kim, Jea-Yo
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.26 no.2
    • /
    • pp.43-50
    • /
    • 2022
  • Even though the structural safety is confirmed in the design stage, the structural safety is not guaranteed in the construction stage because the structural system is not completed. In addition, since the construction period is shorter than the period of use of the building after completion, it is excessive to apply the same seismic load to the construction stage as in the design stage. ASCE 37-14 presents the concept of seismic load reduction factor during construction, but does not provide a clear application method. Therefore, in this study, the seismic load reduced according to the return period was applied to the example model of a residential middle-rise RC building. The construction stage of the example model was divided into five-story units, and seismic load with the change of the return period was applied to the construction stage models to analyze the change of seismic load during construction and to check the sectional performances of structural members. By comparing the design strength ratio of the shear wall at the design stage and the construction stage, the range of seismic load magnitudes that can assure the safety during construction of a residential middle-rise RC building was analyzed in terms of the return period.

Evaluation of Short and Long-Term Modal Parameters of a Cable-Stayed Bridge Based on Operational Modal Analysis (운용모드해석에 기반한 사장교의 장단기 동특성 평가)

  • Park, Jong-Chil
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.26 no.4
    • /
    • pp.20-29
    • /
    • 2022
  • The operational modal analysis (OMA) technique, which extracts the modal parameters of a structural system using ambient vibrations, has been actively developed as a field of structural health monitoring of cable-supported bridges. In this paper, the short and long-term modal parameters of a cable-stayed bridge were evaluated using the acceleration data obtained from the two ambient vibration tests (AVTs) and three years of continuous measurements. A total of 27 vertical modes and 1 lateral mode in the range 0.1 ~ 2.5 Hz were extracted from the high-resolution AVTs which were conducted in the 6th and 19th years after its completion. Existing OMA methods such as Peak-Picking (PP), Eigensystem Realization Algorithm with Data Correlation (ERADC), Frequency Domain Decomposition (FDD) and Time Domain Decomposition (TDD) were applied for modal parameters extraction, and it was confirmed that there was no significant difference between the applied methods. From the correlation analysis between long-term natural frequencies and environmental factors, it was confirmed that temperature change is the dominant factor influencing natural frequency fluctuations. It was revealed that the decreased natural frequencies of the bridge were not due to changes in structural performance and integrity, but to the environmental effects caused by the temperature difference between the two AVTs. In addition, when the TDD technique is applied, the accuracy of extracted mode shapes is improved by adding a proposed algorithm that normalizes the sequence so that the autocorrelations at zero lag equal 1.

A Study on the Effectiveness of the Hazardous Chemical Transport Vehicle Management System (유해화학물질 운반차량 관리제도 실효성 연구)

  • Kim, Sungbum;Lee, HyunSeung;Jeong, Seongkyeong
    • Journal of the Society of Disaster Information
    • /
    • v.17 no.4
    • /
    • pp.794-801
    • /
    • 2021
  • Purpose: The effectiveness of the transport vehicle management system of the Chemical Substances Control Act will be studies and used as basic data for future system improvement plans. Method: After the enforcement of the Chemical Substances Control Act, the effectiveness for the transport vehicle management system was studies by comparing the transport plan, guidance and inspection status, safety training completion management, ect., and the reduction rate of chemical accidents. Results: The average number of chemical accidents in transport vehicles nationwide is 20 each year. And It is decreasing with the stabilization of the Chemical Substances Control Act('15.1.1). The first reason for the decrease in chemical accidents is the increase in submission of transport plans. Second, as the guidance and inspection rate increased every year, the shipper company's management of transport companies was naturally strengthened. Finally, it is judged that chemical accident caused by transport vehicles decrease through safety education. Conclusion: The current tranport vehicle management system of the Chemical Substances Control Act is effective. However, further research is needed to improve the practical and efficient transport vehicle management system.

Effect of Preventive and Prepared Fire Administration on Response Fire Administration (예방소방행정과 대비소방행정이 대응소방행정에 미치는 영향)

  • Lee, Wonjoo;Lim, Jae Hoon;Moon, Kwang Min
    • Fire Science and Engineering
    • /
    • v.34 no.2
    • /
    • pp.120-130
    • /
    • 2020
  • This study aimed to provide an empirical analysis of the effect of preventive fire administration (PVFA) and prepared fire administration (PPFA) on response fire administration (RPFA) in fire service organizations in Korea. To this end, panel data was collected from 16 metropolitan councils from the period of 2008 to 2018 and statistically analyzed using PVFA, PPFA, and RPFA. The independent variables were PVFA and PPFA, while the dependent variable was RPFA. The analysis of the current situation of the specific target for firefighting (STFF), public use facilities, proof of completion of safety families for public use facilities, and special fire inspection were sub-variables of PVFA. Fire safety education (FSE) and the mobilization for fire suppression (MFS) were sub-variables of PPFA and RPFA, respectively. In the results, STFF and FSE had a significant positive influence on the MFS. This study will contribute to the basic research regarding the investigation of the effectivity of fire service organizations in Korea.