• Title/Summary/Keyword: completion casing

Search Result 3, Processing Time 0.021 seconds

Temperature distribution during heavy oil thermal recovery considering the effect of insulated tubing

  • Zhang, Songting
    • Geomechanics and Engineering
    • /
    • v.19 no.6
    • /
    • pp.523-532
    • /
    • 2019
  • Based on the formation characteristics, wellbore parameters and insulated tubing (IT) parameters of the Shengli oilfield, Shandong, China, a geomechanical model is built to predict the temperature distributions of the wellbore and formation. The effects of the IT heat conductivity coefficient (HCC), well depth and IT joint on the temperature distribution of the IT, completion casing, cement sheath, and formation are investigated. Results show the temperature of the formation around the wellbore has an exponentially decreasing relation with the distance to the wellbore. The temperature of the formation around the wellbore has an inverse relation with the IT HCC when the temperatures of the steam and the formation are given. The temperature of the casing outer wall is mainly determined by the steam temperature and IT HCC rather than by the initial formation temperature. The temperature of the casing at the IT joint is much larger than that of the other location. Due to the IT joint having a small size, the effects of the IT joint on the casing temperature distribution are limited to a small area only.

An Analytical Study on Casing Design for Stabilization of Geothermal Well (지열정 안정화를 위한 케이싱 설계에 대한 해석적 연구)

  • Lee, Eun-Ji;Jeon, Yong Seok;Kim, Yongchan;Jeon, Jongug
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.24 no.11
    • /
    • pp.784-791
    • /
    • 2012
  • The casing has been used as a protective conduit during all phases of drilling operations and productions for the oil and gas industries. The casing is manufactured in various diameters, wall thicknesses, lengths, strengths, and connections. When the casing is designed, it has to be considered to withstand a variety of forces, such as collapse, burst, and tensile failure, as well as chemically aggressive brines. Once the casing is damaged, serious problems in geothermal well have been detected continuously. Therefore, this paper describes the casing design for stability of geothermal well to determine influence of casing parameters on the strength and load. In addition, the casing design program was developed. The estimated collapse, burst, tension and depth pressure can provide benefit in the casing design and completion method. This program provides a safety factor and predicts the casing stress more easily.

Drilling and Completion of CO2 Injection Well in the Offshore Pohang Basin, Yeongil Bay (포항분지 해상 CO2 주입정 시추 완결 및 구축)

  • Won, Kyoung-Sik;Lee, Dae-Sung;Kim, Sang-Jun;Choi, Seong-Do
    • The Journal of Engineering Geology
    • /
    • v.28 no.2
    • /
    • pp.193-206
    • /
    • 2018
  • In this study, as part of the "Small-scale $CO_2$ Injection-Demonstration Project in Offshore Pohang Basin", we performed drilling and completion of a $CO_2$ injection well from the offshore platform installed in the Yeongil Bay, Pohang city, Gyeongsang buk-do. The drilling of injection well was carried out from an offshore platform installing on the sediment formations of the Pohang Basin. Drilling diameters were reduced by stages, depending on the formation pressure and groundwater pressure along a depth and the casing installation and cement grouting in drilled hole were performed at each stage. The injection well was drilled to a final depth of 816.5 m with a hole diameter of 4 7/8 inches (${\Phi}124mm$) and the perforated casing for an injection section was installed in a depth of 746.5~816.5 m. Injection tubing, packer, and christmas tree were installed for the completion of an injection well for $CO_2$. The validation project of the $CO_2$ injection was accomplished successfully by drilling the injection well and installing the injection facilities, and through the suitable $CO_2$ injection process. The current injection facility is a facility for small-scale injection demonstration of 100 tons. In the case of large-scale demonstration facility test of a capacity of 10,000 tons, research is underway through the upgrading of the injection facilities.