A Basic Study of Automatic Rebar Length Estimate Algorithm of Columns by Using BIM-Based Shape Codes Built in Revit (BIM 기반 형상코드를 이용한 기둥 철근길이 자동 산정 기초 연구)

  • Oh, Jin-Hyuk;Kim, Sun-Kuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.21-22
    • /
    • 2023
  • In reinforced concrete constructions, reinforcing bar generates more CO2 per unit weight than other construction materials. In particular, cutting and bending rebar is the main source of rebar waste in the construction industry. Rebar-cutting waste is inevitable during the construction of a reinforced concrete structure since the rebar is not manufactured as designed. Large amounts of waste can be avoided by utilizing optimal cutting patterns and schedules. This research provides a fundamental analysis of the automatic calculation of column rebar length using BIM-based shape codes to minimize cutting waste to near zero. By employing this approach in practice, it is possible to minimize the rate of rebar-cutting waste, reduce costs, shorten construction duration, and reduce CO2 emissions. In addition, the development of this research will serve as a clue for the development of BIM-based rebar layout automation algorithms.

  • PDF

Advancing an Automated Algorithm for Estimating Rebar Quantities in Columns

  • Rachmawati, Titi Sari Nurul;Widjaja, Daniel Darma;Kim, Sunkuk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.4
    • /
    • pp.497-508
    • /
    • 2023
  • Manual estimation of rebar quantities by contractors often yields discrepancies between projected and actual amounts used in the construction phase, leading to cost inaccuracies and potential logistical challenges. To address these issues, there is a clear need for a method that allows precise estimation of rebar quantities during the design phase. Such a method would enhance contractor competitiveness during project bids, promote accurate cost calculations, and avert superfluous rebar purchases on-site. Given that columns are the primary structural components in reinforced concrete(RC) buildings and necessitate considerable amounts of rebar, this study focuses on creating an automated algorithm for estimating column rebar quantities. An analysis of the accurate quantities obtained via the study and those derived from manual estimation reveals a discrepancy of 0.346 tons or 2.056%. This comparison affirms the proposed algorithm's efficacy in eliminating errors from overestimation or underestimation of rebar quantities. The practical implications of this study are significant for construction companies as it fosters efficient and precise estimation of rebar quantities, ensuring compliance with related specifications and governing regulations.

Seismic behavior of rebar-penetrated joint between GCFST column and RGC beam

  • Li, Guochang;Fang, Chen;An, Yuwei;Zhao, Xing
    • Steel and Composite Structures
    • /
    • v.19 no.3
    • /
    • pp.547-567
    • /
    • 2015
  • The paper makes the experimental and finite-element-analysis investigation on the seismic behavior of the rebar-penetrated joint between gangue concrete filled steel tubular column and reinforced gangue concrete beam under low cyclic reversed loading. Two specimens are designed and conducted for the experiment to study the seismic behavior of the rebar-penetrated joint under cyclic loading. Then, finite element analysis models of the rebar-penetrated joint are developed using ABAQUS 6.10 to serve as the complement of the experiment and further analyze the seismic behavior of the rebar-penetrated joint. Finite element analysis models are also verified by the experimental results. Finally, the hysteretic performance, the bearing capacity, the strength degradation, the rigidity degradation, the ductility and the energy dissipation of the rebar-penetrated joint are evaluated in detail to investigate the seismic behavior of the rebar-penetrated joint through experimental results and finite element analysis results. The research demonstrates that the rebar-penetrated joint between gangue concrete filled steel tubular column and reinforced gangue concrete beam, with full and spindle-shaped load-displacement hysteretic curves, shows generally the high ductility and the outstanding energy-dissipation capacity. As a result, the rebar-penetrated joint exhibits the excellent seismic performance and meets the earthquake-resistant requirements of the codes in China. The research provides some references and suggestions for the application of the rebar-penetrated joint in the projects.

Feasibility study on corrosion monitoring of a concrete column with central rebar using BOTDR

  • Sun, Yijie;Shi, Bin;Chen, Shen-En;Zhu, Honghu;Zhang, Dan;Lu, Yi
    • Smart Structures and Systems
    • /
    • v.13 no.1
    • /
    • pp.41-53
    • /
    • 2014
  • Optical fiber Brillouin sensor in a coil winding setup is proposed in this paper to measure the expansion deformation of a concrete column with a central rebar subjected to accelerated corrosion. The optical sensor monitored the whole dynamic corrosion process from initial deformation to final cracking. Experimental results show that Brillouin Optical Time Domain Reflectometer (BOTDR) can accurately measure the strain values and identify the crack locations of the simulated reinforced concrete (RC) column. A theoretical model is used to calculate the RC corrosion expansive pressure and crack length. The results indicate that the measured strain and cracking history revealed the development of the steel bar corrosion inside the simulated RC column.

Estimation of production length of PC beam by using splice length of bottom rebar (하부철근 이음길이에 따른 PC 보 제작 길이 산정)

  • Sung, Soojin;Lim, Chaeyeon;Kim, Sunkuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.84-85
    • /
    • 2014
  • Green frame is column-beam structure composed of precast concrete members. Based on Revision of Structural Concrete Design Code, the bottom rebar of beam shall be extend at least 150mm into the support member. However, if the bottom rebar extend to satisfy Revision of Structural Concrete Design Code, the installation fo beam is impossible due to interference between the columns and beams. Thus, the aim of this study is estimation of production length of precast concrete beam by using splice length of bottom rebar. In this study to solve this problem, lap splice were used on the join. This study was calculated length of the reinforcement by the diameter. According to the length of the rebar, the production length of beam concrete was calculated. The results of this study will satisfy the Revision of Structural Concrete Design Code about column-beam connection when green frame will be applied.

  • PDF

Constructability and Economic Evaluation of Continuous Hoop Reinforcement Method

  • Kang, Su-Min;Park, Sung-Woo;Jang, Se-Woong;Jin, Jong-Min;Eom, Tae-Sung;Park, Hong-Gun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.3
    • /
    • pp.291-305
    • /
    • 2013
  • This paper presents the continuous hoop reinforcement method as a means to overcome the difficulty of rebar construction due to the seismic detail of lateral reinforcement. Because the continuous hoop has no seismic hook, and there is less interference during the rebar work, rebar quantities and construction time can be reduced. Since the details of column and beam continuous hoops are different from those of conventional lateral reinforcements, the construction method should be developed through mock-up tests. The length of the beam mock-up is 8m and the section size is $500mm{\times}700mm$, the height of the column mock-up is 2.8m and 4m, and the section size is $800{\times}800mm$. The length and the size are determined based on the elements that are generally used in reinforced concrete basement parking lots and office buildings. The results of the mock-up test showed that the quantities of rebar could be reduced by 20% and the time could be reduced by up to 40% compared with conventional lateral reinforcements.

Connection Method of Composite Precast Concrete Columns Using Thread Rebar (나사형 철근을 사용한 합성 PC기둥의 접합방법)

  • Kim, Tae-Koo;Lee, Sung-Ho;Kim, Sun-Kuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.14-15
    • /
    • 2013
  • Green Frame is precast concrete column-beam structure. There are three types on column connection. The coupler type which is one of the three, need to be improved because of unstability caused by pre-installation of column before casting the slab, and quality deterioration caused by lack of workspace. Therefore, in this study, new coupler connection type with thread rebar is suggested. The result of this study shall be used for the efficiency analysis of the new coupler connection.

  • PDF

Assessment of Accuracy for the Rebar Detecting Device at Reconstruction Site (재건축현장 철근탐사 검사장비의 정확도 평가)

  • Park Sung-Mo;Rhim Hong-Chul;Rhim Byung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.05a
    • /
    • pp.163-166
    • /
    • 2006
  • The purpose of the research is to assess the accuracy of steel bar detector among other nondestructive testing equipment. The result of previous research shows that the average errors of rebar detector are 14.7% for the cover depth, 2.3% for the rebar spacing, and 11% for the rebar diameter. But this experiment was performed at the laboratory and the mortar was used for covering the steel bars instead of concrete. In situ condition can be different from the laboratory's so the outcomes do not correspond with those of laboratory. This research was performed at the buildings to be reconstructed. Nondestructive and destructive testing can be performed side by side since the building if to be destroyed. Steel bar detector was operated on the beam and the column and concrete cover of those members was removed for the actual measurement of rebar depth, spacing, and diameter finally, presumed value can be directly compared with actual data.

  • PDF

Economic Analysis of Connection and Anchorage Methods of Bottom Rebar for Composite Precast Concrete Girder (합성 PC 보의 하부철근 이음 및 정착방법에 따른 경제성 검토)

  • Cho, Wonhyun;Lim, Chaeyeon;Kim, Sunkuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.11-12
    • /
    • 2015
  • Green Frame is a Rahmen structure made of composite precast concrete members. According to the concrete design code, a lower rebar of precast concrete girder, should be extended to the inner precast concrete column. However, such extension of lower rebar may sharply reduce its constructability. To satisfy the criteria, the connection and anchorage of beam rebar should be taken into consideration, yet it is difficult to use lapping as it is not easy to ensure enough space when Green Frame method is adopted. To solve this, a new method of lower rebar connection and anchorage was developed, and this study is intended to review economic feasibility prior to applying the method developed onto sites. The study result can be used as basic data for selection of the optimal joint and anchorage method for lower rebar of the green frame construction.

  • PDF

Behavior of exterior reinforced concrete beam-column joints including a new reinforcement

  • Fisher, Matthew J.;Sezen, Halil
    • Structural Engineering and Mechanics
    • /
    • v.40 no.6
    • /
    • pp.867-883
    • /
    • 2011
  • Six reinforced concrete beam-column joint specimens were constructed and tested under reverse cyclic loading to failure. The six specimens were divided into three groups, each group representing a different joint design. The main objectives of this study are to investigate the response of joints with three different design, reinforcement detailing and beam strengths, and to evaluate and compare the responses of beam-column joints reinforced with traditional steel rebar and a recently proposed steel reinforcement called prefabricated cage system (PCS). Each of the three test specimen designs included equivalent amount of steel reinforcement and had virtually identical details. The results of the research show that the PCS reinforced joints had a slightly higher strength and significantly larger deformation capacity than the equivalent rebar reinforced joints.