• Title/Summary/Keyword: collaborative project

Search Result 298, Processing Time 0.026 seconds

Introduction of Profile of Foreign Mining Company, Xstrata, in Argentina (아르헨티나에서 외국광산기업, 엑스트라타, 개요소개)

  • Lee, Han-Yeang
    • The Journal of the Petrological Society of Korea
    • /
    • v.17 no.4
    • /
    • pp.231-237
    • /
    • 2008
  • Famous foreign mining companies in Argentina are Xstrata, Barrick Gold, Yamana Gold, and Anglogold Asaanti respectively. Among these companies firstly a profile of Xstrata including company history, current and future mining projects, production, and financial condition are introduced in this paper for the Korean mining companies those are sincerely looking for reliable collaborative partners not to make serious mistake in investment.

Relating Use Cases and Classes to Identify Components and its Experience for Enterprise Software Development (컴포넌트 인식을 위한 유즈케이스와 클래스의 연관과 전사적 소프트웨어개발에서의 적용)

  • Lim, Joa-Sang
    • Journal of Information Technology Services
    • /
    • v.5 no.1
    • /
    • pp.177-190
    • /
    • 2006
  • Since their first inception a few decades ago, software components have received much attention mainly due to their alleged benefits of quality and productivity improvement. Despite this, it is yet to be agreed upon what and how components should be designed. This paper aims to bridge the gap by proposing a collaborative process where the voice of the customer is captured and documented by employing the event and entity models. These requirement elements (WHAT) are cross-tabulated in three relation matrices in accordance with the weights provided by the business users. The requirements are fed into the algorithm invented by the authors to optimize the component grouping (HOW). This collaborative process has been successfully validated at an enterprise wide software development project. The process was effective to help the users more actively involved in the design of the system and made the whole process faster and more adaptive to the changes.

Holistic, Collaborative, Ecological, and Coevolutionary Characteristics of Service Design Process

  • Lee, Dong-Seok
    • Journal of the Ergonomics Society of Korea
    • /
    • v.31 no.1
    • /
    • pp.7-13
    • /
    • 2012
  • Objective: This paper discussed the characteristics of service design process by comparing with product design process. Background: Service design has different design outcomes, project participants, and design constraints than product design. Method: The comparison took two perspectives: one was shorter-term, design process of a service, and the other was longer-term, process of service development. Results: It was discussed that service design process is similar in overall, but has four differences. First, the role of design is required earlier and longer in the process, which means service designers need to participate from the begging of the project to service operation. Thus service designers are required to have holistic viewpoint of the project. Second, service design requires many design expertise thus collaboration needs to be well defined and managed throughout the process. Third, since service provider has limited resources, regulations, and market competition, some service features cannot be provided. Service designers are required to know both customers' needs and functional constraints. Last, service design is highly coupled with service operation. Designing and providing service happens at the same time and evolves over time. Conclusion: Consequently it was asserted that the role of designers in service design is essential for success. In specific, the role of service design architect, who manages design process and design outcomes, is a new and important role in service design project.

A Study of Project Management Capability in Global Information System Projects (글로벌 IS 프로젝트 관리 역량에 관한 연구)

  • Kim, Gyeung-Min
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.33 no.3
    • /
    • pp.225-232
    • /
    • 2010
  • 글로벌 IS 소싱이 확산됨에 따라 다국적 팀원들로 구성된 글로벌 프로젝트 팀이 급격히 늘어나고 있다. 상이한 시간대에 위치한 팀원 간의 상호작용이 필수적인 글로벌 프로젝트는 이러한 시간적, 공간적 복잡성 때문에 프로젝트의 성공적 수행에 많은 어려움을 겪고 있다. 본 연구는 성공적인 글로벌 프로젝트 수행에 필요한 프로젝트 관리 역량에 대한 탐색적인 연구 조사를 하고자 한다. 본 연구는 글로벌 프로젝트 관리 역량을 정보 기술적 역량(IT capability)과 인적 자원 역량(human resource capability)의 관점에서 고찰하였다. 연구 결과에 따르면 기술적 역량으로는 팀원 간의 조정 및 지식 공유 등을 지원하는 협업 도구(collaborative tools)가 프로젝트 성공에 중요한 역할을 하고, 인적 자원 역량과 관련해서는, 기존에 중요시 여겨지던 기술적 지식들 보다는 경영학적 관리 지식 및 의사 소통 능력 등이 중요시 여겨지는 것으로 나타났다. 인적 역량의 관점에서, 본 연구 결과는 해외소싱이 활발해 짐에 따라 프로젝트 관리자(Project Manager, PM)들이 가져야 하는 주요지식으로 기존의 기술적 지식의 비중은 급격히 줄어든 반면, 의사소통 능력, 해외개발 인력관리, 소싱전략 등과 같은 관리에 대한 지식과 비즈니스 업무지식이 점차 중요해 지고 있음을 보여주고 있다. 한국의 해외 소성은 매우 초기 단계에 있지만 본 연구는 차제에 한국의 IT 인력 특히 PM 인력들이 갖추어야 하는 지식요건과 해외소성을 관리하기 위한 기술적 역량 등에 대한 방향을 제시하고 있다는 점에서 의의가 있다.

SEISMIC ISOLATION OF LEAD-COOLED REACTORS: THE EUROPEAN PROJECT SILER

  • Forni, Massimo;Poggianti, Alessandro;Scipinotti, Riccardo;Dusi, Alberto;Manzoni, Elena
    • Nuclear Engineering and Technology
    • /
    • v.46 no.5
    • /
    • pp.595-604
    • /
    • 2014
  • SILER (Seismic-Initiated event risk mitigation in LEad-cooled Reactors) is a Collaborative Project, partially funded by the European Commission in the $7^{th}$ Framework Programme, aimed at studying the risk associated to seismic-initiated events in Generation IV Heavy Liquid Metal reactors, and developing adequate protection measures. The project started in October 2011, and will run for a duration of three years. The attention of SILER is focused on the evaluation of the effects of earthquakes, with particular regards to beyond-design seismic events, and to the identification of mitigation strategies, acting both on structures and components design. Special efforts are devoted to the development of seismic isolation devices and related interface components. Two reference designs, at the state of development available at the beginning of the project and coming from the $6^{th}$ Framework Programme, have been considered: ELSY (European Lead Fast Reactor) for the Lead Fast Reactors (LFR), and MYRRHA (Multi-purpose hYbrid Research Reactor for High-tech Applications) for the Accelerator-Driven Systems (ADS). This paper describes the main activities and results obtained so far, paying particular attention to the development of seismic isolators, and the interface components which must be installed between the isolated reactor building and the non-isolated parts of the plant, such as the pipe expansion joints and the joint-cover of the seismic gap.

Collaborative Archiving Project with Citizens: A Case Study on the Paju Central Library (시민과 함께 하는 기록화 사업 :파주중앙도서관 사례)

  • (Myung Hee Yoon
    • Journal of Korean Society of Archives and Records Management
    • /
    • v.23 no.3
    • /
    • pp.165-173
    • /
    • 2023
  • With the objective of recording the life stories of Paju's long-time residents, the Paju Central Library has been implementing the "Human in Paju" project by forming the Citizen Oral History team since 2017. Building upon the success of this initiative, Paju Central Library became the first library in the country to establish a Records Management team. Subsequently, regulations were enacted, and a committee comprising citizens and officials was formed to ensure the continuous development of the archival project. Moreover, they emphasized public discourse and collaboration at every stage by creating a system to raise awareness of the importance of archiving throughout Paju and support citizens in becoming active participants in the project. This paper aims to present a case study of this exemplary local government library.

INTEROPERABILITY ISSUES IN CROSS-DISCIPLINARY COLLABORATIONS OF IRREGULARLY SHAPED BUILDINGS: THE CASE OF DONGDAEMUN DESIGN PLAZA AND PARK

  • Ohyoon Kwon;Ghang Lee;Seonwoo Kim;Yunah Sin;Jeashik Hwang;Kabsu Chae
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.331-337
    • /
    • 2009
  • This paper summarizes some of approaches that could be taken for data exchange in a non-interoperable work environment and reports lessons learned from the Dongdaemun Design Plaza and Park project. Today's widespread application of building information modeling (BIM) to the construction and architectural design industries requires a change in the cooperation between business organizations and their methods of communication. In particular, the interoperability of information between interdisciplinary organizations, which use specific programs for different purposes, has become a critical issue. More than just a technical problem, it is also highly related to an organization's collaboration culture and the particulars of a specific project. This paper describes the interoperability issue that occurred during the construction documentation phase of the irregularly shaped building project, Dongdaemun Design Plaza and Park, designed by Zaha Hadid Architects and Samoo Architects and Engineers, from the perspective of the technological problem and the collaborative organizations' communications. Although the perfect compatibility of information is not possible, this paper deals with a practical approach to the interoperability issue by examining the way the end-users of computer-aided design (CAD) resolved the interoperability problems in practice.

  • PDF

Constructing a Model for National Authority Control Utilizing VIVO (VIVO를 활용한 국가적 전거구축모델에 관한 연구)

  • Oh, Sam G.;Han, Sangeun;Son, Teaik;Kim, Seonghun
    • Journal of the Korean Society for information Management
    • /
    • v.35 no.3
    • /
    • pp.165-187
    • /
    • 2018
  • Despite repeated efforts to develop a methodological foundation for assembling collaborative authority data in South Korea, issues such as the establishment of a standard authority model and standard authority construction as well as the reconfiguration of existing entities in authority building have prevented such research from generating a cooperative push for nation-wide authority data and progressing toward concrete implementation. The formulation of a collaborative and well-utilized collection of national authority data accordingly calls for 1) a practical approach to supporting both established authority data contributors and newly organized avenues of mutual participation in authority building, 2) committed involvement on the part of national institutions capable of providing the project with sustained assistance, and 3) a standard identification system which allows multiple organizations to merge their data. This study addresses the challenges of the current environment by taking stock of the key components necessary for the creation of collaborative authority data and using a Semantic Web-based interoperable VIVO ontology model to propose a viable national authority data framework.

Remote Versioning on the CoSpace Client for the CoSlide Collaborative System (CoSlide 협업시스템을 지원하는 CoSpace 클라이언트의 원격 버전 관리)

  • Park, Jong-Moon;Lee, Myung-Joon
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.14 no.1
    • /
    • pp.233-241
    • /
    • 2010
  • CoSlide is a collaborative system, extending the Jakarta Slide WebDAV server. The CoSlide server provides group workspaces for collaborators. CoSpace is a client which supports various collaborative authoring activities on the CoSlide server through the WebDAV protocol. CoSpace provides graphic user interfaces to support effective interaction among the collaborators, managing the shared resources for them. However, during collaboration, simultaneous modifications on the content of shared resources might cause conflicts among the content of the revisions made by the collaborators, leading to serious problems on project progress. In this paper, we describe an extension of the CoSpace client to solve the problem. The extended CoSpace client supports the remote version management facility through which the collaborators can manage the versions of the associated server resources in the distance. Also, to identify the changes of the text files such as program source codes, the extended client provides the facility for comparing two versions and displaying the differences in a visual manner. In addition, it provides the version management of a whole workspace and the removal of all the unnecessary versions of the designated resources.

THE SUBMILLIMETER ARRAY: CURRENT STATUS AND FUTURE PLAN

  • OHASHI NAGAYOSHI
    • Journal of The Korean Astronomical Society
    • /
    • v.38 no.2
    • /
    • pp.103-106
    • /
    • 2005
  • The Submillimeter Array (SMA), a collaborative project of the Smithsonian Astrophysical Observatory (SAO) and the Academia Sinica Institute of Astronomy & Astrophysics (ASIAA), has begun operation on Mauna Kea in Hawaii. A total of eight 6-m radio telescopes comprise the array with currently working receiver bands at 230, 345, and 690 GHz. The array will have 8 receiver bands covering the frequency range of 180-900 GHz. The backend is flexible analog-digital correlator with a full bandwidth of 2GHz, which is very powerful to cover several line emissions simultaneously. The current status and future plans of the SMA are described with emphasis on Taiwanese efforts.