• Title/Summary/Keyword: collaborative planning

Search Result 158, Processing Time 0.029 seconds

A Study on Affecting Factor-Construction of Collaborative Planning Process and Effect on Comprehensive Rural Village Development Project (농촌마을종합개발사업의 협력적 계획과정과 계획효과의 영향구조 분석)

  • Kim, Tae-Gu;Lee, Seong-Keun
    • Journal of Korean Society of Rural Planning
    • /
    • v.20 no.2
    • /
    • pp.23-43
    • /
    • 2014
  • This study aims to analyze the affecting factors-construction of collaborative planning process and effect on Comprehensive Rural Village Development Project. To this end, targeting the 36 districts which were selected for 2004 Comprehensive Rural Village Development Project and completed their 2010 5-year projects, components of collaborative planning process and planning effect will be drawn and the affecting factors-construction of collaborative planning and effect on Comprehensive Rural Village Development Project will be analyzed below. According to the results of this study, the affecting factors of collaborative planning process of Comprehensive Rural Village Development Project on planning effect, The level of effect of individual component on endogenous variable appeared greatest mostly in the upper groups. In terms of the level of individual component effect, social learning process and interaction among participants affected greatest. The process of Comprehensive Rural Village Development Project is evaluated that it reflected collaborative planning theory of Healey enough. Therefore, in the course of Comprehensive Rural Village Development Project progress, collaborative planning model must pass social learning process and interaction among participants which are the most important components out of collaborative planning process as we saw in the upper groups. And in order to maximize the performance and results of Comprehensive Rural Village Development Project, the following sequential affecting factors model as Figure 7 must be suggested as optimal collaborative planning models of Comprehensive Rural Village Development Project. Based on the results of the study, the policy implication was drawn as follows. First, systematic supplementations in the form of a consultative body are required to perform Comprehensive Rural Village Development Project efficiently. Second, network needs to be built among different participants in Comprehensive Rural Village Development Project process. Third, systematic mechanism is required to improve social learning among different participants. Fourth, systematic rearrangement is required to guarantee the residents' realistic participation in the course of Comprehensive Rural Village Development Project process.

Developing a Collaborative Model for Early Childhood Teacher's Knowledge on Early Childhood Curriculum at First Career Period (유치원 초임교사의 교육계획안 개발에서 실천적 지식 함양을 위한 협력 모형 구안)

  • Hwang, Yoon-Se;Kang, Hyeon-Suk
    • Korean Journal of Child Studies
    • /
    • v.28 no.5
    • /
    • pp.233-251
    • /
    • 2007
  • This study explored the contents of practical knowledge about educational planning in early childhood curriculum as constructed by kindergarten teachers at early career stages and then developed a collaborative model of educational planning. Subjects were 6 teachers at early career stages. Using the ethnographic method, data were collected by in-depth interviews. Research outcomes were : (1) teachers specifically worked on 'difficulties in adapting to the teaching job', 'age of children that the teacher cares for', 'integration of theory and practice', and 'variety of actual teaching situations.' (2) A model for collaborative educational planning was constructed on the basis of review of the literature on teachers' knowledge, educational planning for early childhood curriculum, and learning of community.

  • PDF

COLLABORATIVE PROCESS PLANNING AND FLOW ANALYSIS FOR AUTOMOTIVE ASSEMBLY SHOPS

  • Noh, S.D.;Kim, G.
    • International Journal of Automotive Technology
    • /
    • v.7 no.2
    • /
    • pp.217-226
    • /
    • 2006
  • To maintain competitiveness in the modern automotive market, it is important to carry out process planning concurrently with new car development processes. Process planners need to make decisions concurrently and collaboratively in order to reduce manufacturing preparation time for developing a new car. Automated generation of a simulation model by using the integrated process plan database can reduce time consumed for carrying out a simulation and allow a consistent model to be used throughout. In this research, we developed a web-based system for concurrent and collaborative process planning and flow analysis for an automotive general assembly using web, database, and simulation technology. A single integrated database is designed to automatically generate simulation models from process plans without having to rework the data. This system enables process planners to evaluate their decisions quickly, considering various factors, and easily share their opinions with others. By using this collaborative system, time and cost put into the assembly process planning can be reduced and the reliability of the process plan would be improved.

Web-based Collaborative Process and Material Planning for Automotive General Assembly (자동차 조립공장을 위한 Web기반 협업 공정 및 자재 계획)

  • Heo, Jun;Lee, Kang-Kul;Noh, Sang-Do;Park, Young-Jin
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.12 no.4
    • /
    • pp.198-206
    • /
    • 2004
  • To ensure competitiveness in the modem automotive market, process and material planning should be performed concurrently with new car developments. In automotive general assembly shops, thus, new business workflows and supporting environments are inevitable to reduce the manufacturing preparation time in developing a new car in the manner of concurrent and collaborative engineering. Since complete material planning for a whole general assembly system is a huge and complex job, several planners should execute their planning jobs and share information. Therefore, each planner should provide others with his/her results with continuous on-line communication and cooperation. In this research, a web-based system for concurrent and collaborative process and material planning for automotive general assembly via 3D digital mock-up S/W is developed. By using this system, savings in time and cost of process and material planning are possible, and the reliability of the planning result is improved.

Web-based Collaborative Process Planning System for the Automotive General Assembly Shop (자동차 조립 공정계획을 위한 Web 기반 협업시스템)

  • Noh, Sang-Do;Park, Young-Jin;Kong, Sang-Hoon;Lee, Kyo-Il
    • IE interfaces
    • /
    • v.16 no.3
    • /
    • pp.375-381
    • /
    • 2003
  • To ensure competitiveness in the modern automotive market, process planning should be performed concurrently with new car developments. In automotive general assembly shops, thus, new business workflows and supporting environments are inevitable to reduce the manufacturing preparation time in developing a new car in the manner of concurrent and collaborative engineering. Since complete process planning for a whole general assembly system is a huge and complex job, several process planners should execute their planning jobs and share information. Therefore, each planner should provide others with his/her results with continuous on-line communication and cooperation. In this research, a web-based system for concurrent and collaborative process planning for automotive general assembly is developed. By using this system, savings in time and cost of assembly process planning are possible, and the reliability of the planning result is improved.

Social Network Anaylsis of Collaborative Activity in Rural Community - Case study of Hong-Dong area in Chungman Province, South Korea - (농촌 공동체 협업활동의 사회연결망분석 - 충남 홍성군 홍동 지역을 중심으로 -)

  • Hwang, Baram
    • Journal of Korean Society of Rural Planning
    • /
    • v.23 no.2
    • /
    • pp.9-17
    • /
    • 2017
  • Rural development policy has changed from hardware based development to community revitalization. The purpose of this study is to analyze social network of collaborative activity among rural organizations as fundamental of community. The material used in this study is a record of collaborative activites in the community newsletter of Hong-Dong area. 161 of collaborative activities (links) and 75 of organizations (nodes) are investigated in network. 6 collaborative activity type ('Education', 'Socializing', 'Meeting', 'Culture', 'Event' and 'Labor') is classified. 'Socializing' is inclusive of approximately half of whole network (50.67%). Closeness centraization, degree centralization and betweenness centralization are measured on top in 'Education', 'Meeting' and 'Event' type. Scatter plot analysis using degree and betweenness centrality index, 'Maeul Revitalization Center', 'Balmak Library', 'Woori-Maeul Medical Co-op', 'Support Center for Female Farmers', 'Hongdong Middle School' and 'Mundang Sustainable Agriculture Education Center' are resulted as the core organization in network. Geographical distribution of collaborative activity is not only concentated in Hong-Dong Myeon but also networked with adjacent administrative district. This study finds its purpose in the detailed analysis of network characteristics of collaborative activity within Hong-Dong area which is representative developed rural community in Korea.

Production Flow Analysis Simulation Integration for Collaborative Process Planning (협업 공정계획을 위한 생산흐름 분석 시뮬레이션 통합)

  • Lee Ju-Yeon;Noh Sang-Do
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2005.06a
    • /
    • pp.987-992
    • /
    • 2005
  • Manufacturing companies should perform process planning and its evaluation concurrently with new product developments so that they can be highly competitive in the modern market. Process planners should make decisions in the manner of concurrent and collaborative engineering in order to reduce the manufacturing preparation time and cost when developing new products. Automated generation of analysis models from the integrated database, which contains process and material information, reduces time to prepare analyses and makes the models reliable. In this research, we developed a web-based system for concurrent and collaborative system for production flow analysis, using web, database, and simulation technology. An integrated database is designed to automatically generate analysis models from process and material plans without reworking the data. This system enables process planners to evaluate their decision fast and share their opinions with others easily. With this system, it is possible to save time and cost for assembly process and material planning, and reliability of process plans can be improved

  • PDF

Development of a Component-Based Distributed Supply Chain Planning System (컴포넌트에 기반한 분산 공급사슬계획 시스템 개발)

  • 정한일;박찬권;이기창
    • The Journal of Society for e-Business Studies
    • /
    • v.7 no.2
    • /
    • pp.143-156
    • /
    • 2002
  • The objective of supply chain planning is to satisfy the requirements for minimizing inventory costs, transportation costs, and lead times throughout the supply, production and distribution stage dispersed geographically. Therefore, the supply chain planning system should have functionalities to resolve complex optimization problems that have characteristics of multi-stage and multi-product. Ant the system should also support collaborative decision making among distributed business partners. In this study, we proposed a distributed architecture for the supply chain planning system. To do this, we analyzed functional requirements by using IDEF-0(ICAM Definition-0) methodology, defined required components, and designed each component by using object-oriented methodology. We implemented a prototype system based on CORBA (Common Object Request Broker Architecture) to show that the proposed distributed architecture based on component technology is feasible and can solve supply chain planning problem collaboratively.

  • PDF

Review of Collaborative Planning, Forecasting, and Replenishment as a Supply Chain Collaboration Program

  • Ryu, Chung-Suk
    • Journal of Distribution Science
    • /
    • v.12 no.3
    • /
    • pp.85-98
    • /
    • 2014
  • Purpose - This study primarily aims to represent the current trend of research on CPFR as a promising supply chain collaboration program and proposes a new framework for analyzing any collaboration programs in terms of three key collaborative features. Research design, data, and methodology - This study employs a literature review of selected studies that conduct research on CPFR. CPFR is analyzed based on the proposed framework that characterizes collaboration programs in terms of three key collaborative features. Results - The analysis based on the proposed framework reveals that the current form of CPFR continues to have some collaborative features that are not fully utilized to create an advanced collaboration program. The literature review indicates that most past studies ignore critical issues including the dynamic nature of the multiple-stage supply chain system and negotiation process for collaborative agreement in CPFR implementation. Conclusions - Results indicate that CPFR can become a better supply chain collaboration program by incorporating coordinative cost payment and joint decision making processes. Based on observations on the existing literature of CPFR, this study indicates several important issues to be addressed by future studies.

Design of Architecture for Collaborative Project Management System based on Business Process (프로세스 기반의 협업 프로젝트 관리 시스템 구조 설계)

  • Baek, Jae-Yong;Jung, So-Young;Kim, Bo-Hyun;Yoo, Seock-Kyu;Lee, Seok-Woo;Choi, Hon-Zong
    • Korean Journal of Computational Design and Engineering
    • /
    • v.14 no.5
    • /
    • pp.338-345
    • /
    • 2009
  • c-PMS(collaborative project management system) is a business process(BP) based tool to manage collaborative projects which accomplish common business objectives determined by mutual agreement of companies using limited resources and time. This study analyzes collaborative BP, collaborative projects, and their relation, and proposes the architecture and operation scenario of c-PMS consisted of business process asset management(BPAM) sub-system and project manage(PM) sub-system. BPAM sub-system models private and public BP using a client/server based modeler, defines collaborative BPs process from public BPs, and manages them as companies' asset on a web portal. PM sub-system globally manages collaborative project using planning, execution, monitoring, and analyzing functions.