• Title/Summary/Keyword: clearwell modification

Search Result 3, Processing Time 0.257 seconds

Case study on Remodeling Clearwell Hydraulic Structure using Transient CFD Simulation Technique (Transient CFD 모사기법을 이용한 정수지 최적설계 사례연구)

  • Kim, Seon-Jin;Kim, Seong-Su;Park, No-Suk;Cha, Min-Whan;Wang, Chang-Keun
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.24 no.4
    • /
    • pp.425-432
    • /
    • 2010
  • From the results of tracer test for the existing clearwell in Y water treatment plant, $T_{10}$ and T10/T were calculated as 150 min and 0.24, respectively. Therefore it required the modification schemes for improving hydraulic efficiency, surrogated by $T_{10}$ and $T_{10}$/T, and disinfection performance. In this study, using transient CFD(Computational Fluid Dynamics) simulation technique, tracer tests on dynamic condition for the suggested schemes were simulated. From the results of simulation, it was revealed that 8~6 baffles are necessary to guarantee the disinfection ability in the existing clearwell. Also, installing orifice baffle in the vicinity of inlet could increase plug flow fraction within clearwell.

Internal Short-circuiting Estimation in Clearwell : Part B. Improving T10/T Using Intra Basin and Diffuser Wall by Applying ISEM to Field (정수지 내부 단락류 발생 평가 : Part B. 내부 단락류 평가 방법의 현장 적용을 통한 내부 도류벽과 정류벽을 이용한 T10/T 증가분석)

  • Shin, Eunher;Lee, Seungjae;Kim, Sunghoon;Park, Heekyung
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.22 no.1
    • /
    • pp.113-120
    • /
    • 2008
  • A large majority of clearwell must be modified with maintaining the present baffles since they were underground built with the material like concrete. Therefore it is unreasonable to apply the previous research in clearwell modification which is studied with the assumption that distance between baffles is constant. In this study, internal short-circuiting estimation method (ISEM), which has the advantage of being applied at any condition, is applied to evaluate modification of A clearwell and modify B and C clerwell which have unusual characteristics. After analyzing the hydraulic efficiency at current state, modifications, where baffles, intra basins and diffuser walls are additionally installed, are considered and evaluate using ISEM. And the effect of intra basin and diffuser wall on $T_{10}/T$ is estimated and application feasibility of ISEM is evaluated. The improvement of intra basins is almost same with that of baffles. Also, short-circuiting in effluent zone can be reduced with the same level of channel zone if intra basin is added in effluent zone. However, effect range is restricted to the next channel zone. Diffuser wall can obtain the lower ISI than minimum ISI of cases where baffles and intra basins are installed. Therefore, additional improvement of $T_{10}/T$ value can be expected after $T_{10}/T$ value converges maximum only using baffles

Characteristics of Disinfection Performance in Water Treatment Plants with Introducing Treatment Technigue Requirement (정수 처리기술 기준 도입을 앞둔 전국 정수장의 소독능 관리 현황 및 특색)

  • Yeom, Cheolmin;Cho, Soonhaing;Jung, Haewoong;Yoon, Jeyong
    • Journal of Korean Society on Water Environment
    • /
    • v.18 no.3
    • /
    • pp.327-336
    • /
    • 2002
  • Disinfection process in water treatment plants (WTPs) is one of the most important step in order to inactivate waterborne disease. However, what is the necessary disinfection in WTPs was not properly established in Korea. This study was conducted to evaluate disinfection performance in nationwide water treatment plants (n=474). Disinfection requirement based on the SWTR (Surface Water Treatment Rule) of the U.S. (1-log Giardia removal) was chosen in estimating the compliance. The scope of unit process for evaluating disinfection performance includes postdisinfection process in clearwells, pipeline, and storage tank. The worst water quality condition in individual WTPs was applied for the disinfection performance evaluation. The major results are as follows. First, it was appeared that 184 WTPs (39 %) provided insufficient disinfection performance. Disinfection performance was significantly improved during past 2 years. The ratio of the number of WTPs providing insufficient disinfection performance in 1999 and 2001 was 78 % and 41 %, respectively. One of major factors for this improvement was due to the improvement of $T_{10}/T$ value in clearwell, as a result of modification of clearwell facility. Second, if disinfection criteria is 3-log Giardia inactivation at worst water quality condition, then 19 % of all WTPs can not meet this disinfection criteria. And if disinfection criteria is strengthened to 4-log Giardia inactivation, then 58 % of all WTPs can not meet this disinfection criteria. Since disinfection criteria is decided by contamination level of Giardia in source water, it also needs the investigation of Giardia occurrence in source water.