• Title/Summary/Keyword: clear-cutting method

Search Result 33, Processing Time 0.02 seconds

Rewetting Strategies for the Drained Tropical Peatlands in Indonesia (인도네시아의 배수된 열대 이탄지에 대한 재습지화 전략)

  • Roh, Yujin;Kim, Seongjun;Han, Seung Hyun;Lee, Jongyeol;Son, Yowhan
    • Korean Journal of Environmental Biology
    • /
    • v.36 no.1
    • /
    • pp.33-42
    • /
    • 2018
  • The tropical peatlands have been deforested and converted to agricultural and plantation areas in Indonesia. To manage water levels and increase the overall productivity of crops, canals have been constructed in tropical peatlands. The canals destructed the structure of the tropical peatlands, and increased the subsidence and fire hazard risks in the region. The Indonesian government enacted regulations and a moratorium on tropical peatlands, in order to reduce degradation. A practical method under the regulations of rewetting tropical peatlands was to permit a canal blocking. In this study, four canal blocking projects were investigated regarding their planning, construction priority, design, building material, construction, monitoring, time and costs associated with the canal blockings. In the protected areas, regulations restricted the development of the tropical peatlands areas that were noted as deeper than 3 m, and the administration stopped issuing new concessions for future work projects for this noted criteria of land use. A noted purpose of canal blockings in these areas was to effectuate the restoration of the lands in the region. The main considerations of the restoration efforts were to maintain a durability of the blockings, and to encourage the participation of the area stakeholders. In the case of a concession area, regulations were set into place to restrict clear-cutting and shifting cultivation, and to maintain groundwater level in the tropical peatland. The most significant priorities identified in the canal blocking project were the efficiency and cost-effectiveness of the project. Nevertheless, the drainage of tropical peatlands has been continued. On the basis of a literature review on regulations and rewetting methods in tropical peatlands of Indonesia, we discussed the improvements of the regulations, and adequate canal blockings to serve the function to rewet the tropical peatlands in Indonesia. Our results would help establishing an adequate direction and recommended guideline on viable rewetting methods for the restoration of drained tropical peatlands in Southeast Asia.

A Study of Experimental Image Direction for Short Animation Movies -focusing in short film and (단편애니메이션의 실험적 영상연출 연구 -<탱고>와 <페스트 필름>을 중심으로)

  • Choi, Don-Ill
    • Cartoon and Animation Studies
    • /
    • s.36
    • /
    • pp.375-391
    • /
    • 2014
  • Animation movie is a non-photorealistic animated art that consists of formative language forming a frame based on a story and cuts describing frames that form the cuts. Therefore, in expressing an image, artistic expression methods and devices for a formative space are should be provided in a frame while cuts have the images between frames faithfully. Short animation movie is produced by various image experiments with unique image expressions rather than narration for expressing subjective discourse of a writer. Therefore, image style that forms unique images and various image directions are important factors. This study compared the experimental image directions of and , both of which showed a production method of film manipulation. First, while uses pixilation that produces images obtained from live images through painting and many optical disclosure process on a cell mat, was made with diverse collage techniques such as tearing, cutting, pasting, and folding hundreds of scenes from action movies. Second, expresses non-causal relationship of characters by their repetitive behaviors and circulatory image structure through a fixed camera angle, resisting typical scene transition. On the other hand, has an advancing structure that progresses antagonistic relationship of characters through diverse camera angles and scene transition of unique images. Third, in terms of editing, uses a long-take short cut technique in which the whole image consists of one short cut, though it seems to be many scenes with the appearance of various characters. On the other hand, maximizes visual fun and commitment by image reconstruction with hundreds of various short cuts. That is, both works have common features of an experimental work that shows expansion of animated image expressions through film manipulation that is different form general animation productions. On top of that, delivers routine life of diverse human beings without clear narration through image of conceptualized spaces. expresses it in a new image space through image reconstruction with collage technique and speedy progress, setting a binary opposition structure.

Environmental Interpretation on soil mass movement spot and disaster dangerous site for precautionary measures -in Peong Chang Area- (산사태발생지(山沙汰發生地)와 피해위험지(被害危險地)의 환경학적(環境學的) 해석(解析)과 예방대책(豫防對策) -평창지구(平昌地區)를 중심(中心)으로-)

  • Ma, Sang Kyu
    • Journal of Korean Society of Forest Science
    • /
    • v.45 no.1
    • /
    • pp.11-25
    • /
    • 1979
  • There was much mass movement at many different mountain side of Peong Chang area in Kwangwon province by the influence of heavy rainfall through August/4 5, 1979. This study have done with the fact observed through the field survey and the information of the former researchers. The results are as follows; 1. Heavy rainfall area with more than 200mm per day and more than 60mm per hour as maximum rainfall during past 6 years, are distributed in the western side of the connecting line through Hoeng Seong, Weonju, Yeongdong, Muju, Namweon and Suncheon, and of the southern sea side of KeongsangNam-do. The heavy rain fan reason in the above area seems to be influenced by the mouktam range and moving direction of depression. 2. Peak point of heavy rainfall distribution always happen during the night time and seems to cause directly mass movement and serious damage. 3. Soil mass movement in Peongchang break out from the course sandy loam soil of granite group and the clay soil of lime stone and shale. Earth have moved along the surface of both bedrock or also the hardpan in case of the lime stone area. 4. Infiltration seems to be rapid on the both bedrock soil, the former is by the soil texture and the latter is by the crumb structure, high humus content and dense root system in surface soil. 5. Topographic pattern of mass movement spot is mostly the concave slope at the valley head or at the upper part of middle slope which run-off can easily come together from the surrounding slope. Soil profile of mass movement spot has wet soil in the lime stone area and loose or deep soil in the granite area. 6. Dominant slope degree of the soil mass movement site has steep slope, mostly, more than 25 degree and slope position that start mass movement is mostly in the range of the middle slope line to ridge line. 7. Vegetation status of soil mass movement area are mostly fire field agriculture area, it's abandoned grass land, young plantation made on the fire field poor forest of the erosion control site and non forest land composed mainly grass and shrubs. Very rare earth sliding can be found in the big tree stands but mostly from the thin soil site on the un-weatherd bed rock. 8. Dangerous condition of soil mass movement and land sliding seems to be estimated by the several environmental factors, namely, vegetation cover, slope degree, slope shape and position, bed rock and soil profile characteristics etc. 9. House break down are mostly happen on the following site, namely, colluvial cone and fan, talus, foot area of concave slope and small terrace or colluvial soil between valley and at the small river side Dangerous house from mass movement could be interpreted by the aerial photo with reference of the surrounding site condition of house and village in the mountain area 10. As a counter plan for the prevention of mass movement damage the technics of it's risk diagnosis and the field survey should be done, and the mass movement control of prevention should be started with the goverment support as soon as possible. The precautionary measures of house and village protection from mass movement damage should be made and executed and considered the protecting forest making around the house and village. 11. Dangerous or safety of house and village from mass movement and flood damage will be indentified and informed to the village people of mountain area through the forest extension work. 12. Clear cutting activity on the steep granite site, fire field making on the steep slope, house or village construction on the dangerous site and fuel collection in the eroded forest or the steep forest land should be surely prohibited When making the management plan the mass movement, soil erosion and flood problem will be concidered and also included the prevention method of disaster.

  • PDF