Correlation analysis of the quality and civil construction engineer in apartment house (공동주택 토목공사의 책임기술자와 품질의 상관관계 분석)

  • Jeong, Sangl-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.70-71
    • /
    • 2015
  • Construction period is longer than the non-disclosure in civil construction of apartment house. And this process is intensive at the beginning and end of construction. Because this project management expertise is required. Nevertheless, subsidiary work(Working avoid a tendency of advanced technician, Frequent turnover and employment contracts, etc.) management attention of construction is at a lower level. Because of, there are the bad factors(trial and error, finish degradation, etc.). Therefore, this study analyzed Hindrance Factor of quality control on apartment complex construction work and presented importance of civil construction engineer's role. Also, forms of civil construction engineer, Performance experience and technical Strength of apartment complex construction was investigated for the construction. To this end, It analyzes the relationship between forms of civil construction engineer, Performance experience and technical Strength of apartment complex construction and Construction of evaluation as required by Construction Technology Management Act.

  • PDF

A Conceptual Model for Automated Cost Estimating Using Work Information Classification System of Apartment House (공동주택의 공사정보분류체계를 활용한 적산 자동화 개념 모형 개발)

  • Lee, Yang Kyu;Park, Hong Tae
    • Journal of the Society of Disaster Information
    • /
    • v.10 no.1
    • /
    • pp.15-24
    • /
    • 2014
  • The study presents work information classification system of apartment house which can organize all construction management services throughout the planning and management of a construction such as the decomposition of the design process, the assembly of construction process and cost estimating, etc. In addition, the study suggested a way to connect work information classification system based on a relational database in working order and built a conceptual model for automated cost estimating by utilizing established data base. A conceptual model for automated cost estimating will resolve the fundamental problems of the existing cost estimating system and will be able to take advantage of scientific cost estimating system at the construction site of apartment house.

The Study on Case Analysis of an Apartment House Defects (공동주택 하자사례 분석에 관한 연구)

  • 이희두;이해진;김진호;임남기
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2001.11a
    • /
    • pp.130-135
    • /
    • 2001
  • In this study, I have researched into the causes of defects in apartment house, The results of this study are listed below. (1) Water leakages which result from land sinking and cracks, results of misuse of back filling method, are the main reason of defects in civil engineering work and architectural work. (2) Inexperience and unwillingness are the main reason of defects in plaster work. (3) In windows work and painting work, the main reasons are lacks of precision construction and efflorescence resulting from outdoor air, respectively. (4) Defects in waterproofing work and electric work result from fault construction by low unit Costs. (5) Equipment work requires uses of standardized construction materials and management, and landscape architecture work requires minimizing human mistakes, for instance, degin carelessness. For the reasons stated above, the causes of defects in apartment house are insufficient construction labors, inferior construction materials, urgent construction process time, and conscientiousless industrialists who only seek after a profit margin.

  • PDF

A Study on the Term of Warranty Liability by the Law-suit Requesting of the Guarantee against Defects in the Apartment Building (공동주택 하자보증금 청구소송에 의한 하자담보책임기간 연구)

  • Koo, Hae-Shik
    • KIEAE Journal
    • /
    • v.12 no.3
    • /
    • pp.11-18
    • /
    • 2012
  • The purpose of this study is to contribute to solution of the defect dispute in apartment house in advance. We want to propose the improved devices in defect problems by investigating the money that exacted from the practical business of the inspection company and the money that a judge gave a decision in a civil court in 50 cases of the lawsuit to requesting the guarantee against defects and the improved schemes of the applied rate by analyzing the diagnosis money of each applied years about the term of warranty liability in 40 cases of the lawsuit separately from that. As the result, we have to reflect the defect of non construction and error construction on apartment building defects, which recognizes very important factor when we compute the defect repair warranty money and it needs to be rearranged the applied ratio in guarantee peried of housing law practically.

A Study on Current Status of Landscaping Supervision Quality Control and Improvement Measures in Apartment House Construction (공동주택 건설사업에서 조경 감리의 품질관리 현황과 개선방안 연구)

  • Kim, Jung-Chul
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.49 no.1
    • /
    • pp.1-18
    • /
    • 2021
  • This study was intended to present measures for the improvement of the apartment house landscaping supervision system by examining the adequacy of landscaping supervision, which is aimed at improving the quality of landscape plants and facilities in apartment house landscaping sites. Additionally, this study aims to identify the problems occurring in the process of the performance of landscaping supervision and to provide the evidence for legislative activities and revision of the laws currently being pushed forward for the mandatory deployment of apartment house landscaping supervision personnel. The results of the analysis showed that no landscaping supervision personnel was deployed to apartment complexes with less than 1,500 households and that the landscaping comprised 19% to 46% of the entire construction process. The civil engineering firm performed the landscaping supervision, which made it impracticable to fully focus on the construction quality in the field of landscaping. The quality control in terms of landscape plants revealed differences in quality control, depending on the competence and experience of the civil engineer supervising the personnel, where the landscaping supervision personnel was not deployed. The apartment houses landscaping supervision activity index was analyzed, and the results showed that the supervision activity index for apartment house A was 72.0, B was 70.4, and apartment houses C to G ranged from 38.7 to 46.9, which suggested that the difference in quality control, process control, and technical support affected the construction quality and occurrence of defects.The improvement of landscaping process quality control and process management will be carried out more smoothly and the rate of defects will be drastically reduced if the landscaping supervision personnel placement threshold is lowered from 1,500 households to 300 households in complexes. The results of this study are expected to be useful in promoting and re-establishing the landscaping industry based on the improvement of construction quality in the field of landscaping in connection with the construction of apartment houses.

Comparison of Construction Cost Applied by RC and PC Construction Method for Apartment House and Establishment of OSC Economic Analysis Framework (공동주택 RC 및 PC공법 적용 공사비 비교 및 OSC의 포괄적 경제성 분석 프레임워크 구축)

  • Yun, Won-Gun;Bae, Byung-Yun;Kang, Tai-Kyung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.6
    • /
    • pp.30-42
    • /
    • 2022
  • OSC is a type of supply chain and value chain that spans the entire process of construction production (planning, design, construction, maintenance, etc.). It is a method of producing the final object by manufacturing it in a factory, transporting it to the site, installing and construction. This research as is the construction cost was compared for each case A, which applied the PC method, and case B, which applied the RC method. In the case of applying the PC method (excluding the PC design cost), compared to the case where only the RC method was applied, the frame construction cost per unit quantity (m3) increased by about 70% (50% based on the total RC construction type). Of the total frame construction cost of PC method application, PC accounted for 90.2%, 'PC manufacturing cost' 54.8%, 'PC assembly cost' 28.5%, and 'transportation cost' accounted for 6.89%. Also a decision-making framework that can consider both costs and benefits was established. In the case of benefits, the construction period, defect repair, disaster occurrence, energy efficiency, noise/dust/waste, and greenhouse gas emission indicators reflecting OSC technical advantages were presented. It can contribute to providing a basis for helping decision-making on the introduction of PC apartment houses using OSC.

Analysis of Factors for Improvement of Economic Feasibility of Construction Cost to Spread Application of OSC Construction Method for Apartment Housing (공동주택 OSC공법 적용 확산을 위한 공사비 분야 경제성 개선 요인 분석 - PC 부재 설계, 제작, 운송, 시공을 중심으로 -)

  • Yun, WonGun;Shin, Eun-Young;Kang, Tai-Kyung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.55-63
    • /
    • 2021
  • Recently, as the problem of the traditional on-site labor-intensive construction production method has been raised due to changes in construction work labor and site conditions, the OSC method is gradually spreading as an alternative to this. Even in apartment houses, the application of the PC method is expanding centered on the underground parking lot, but the high cost structure is a problem compared to the conventional formwork method. In this study, factors affecting the calculation of construction cost in the economic evaluation, which are the core of determining the construction method for apartment buildings, are derived through domestic and foreign literature review and expert advice, the importance was analyzed through an opinion survey targeting industry experts. The measures to reduce construction cost were mainly derived from the improvement of the design and manufacturing process. It is expected that the factors affecting the construction cost and improvement measures of the PC method derived from this study will serve as a direction for technology development to spread the application of the PC method for apartment houses in the future.

A Study of Transformation tendency of an Apartment Unit Plan after The Enforcement of Price Deregulation (분양가 자율화이후 공동주택 단위평면의 변화경향에 관한 연구)

  • Ko, Young-Seok;Kweon, Young;Kim, Yong-Sung
    • Proceedings of the Korean Institute of Interior Design Conference
    • /
    • 2003.05a
    • /
    • pp.74-77
    • /
    • 2003
  • After the Enforcement of Price Deregulation of Apartment, Apartment house get down to originality goods, The Housing Market have reorganized the nucleus by a user, have demanding the development for discriminative unit plan. The purpose of this study is that before and after the Price Decontrol of Apartment take part a variety of unit plan, search for transformation factor and analyze into the tendency of the distinction plan of Housing Goods. Before and after the Price Decontrol of Apartment, Apartment unit have analyzed from 85 $m^2$ till 152 $m^2$ private area; ten corporations of civil construction' unit in Seoul and The national capital region supply apartment, will supply apartment. For selected examples, first, unit plan is normalized from the ratio of front to side wall, bay, a Room' organization and a kind of Room, number, and for examples of unit plan of apartment, the examples were analyzed with respect to change of a Room' organization and the number of a room and the ratio of front wall to side wall for item investigated. Finally, I search out course of transformation tendency of an apartment unit plan after Enforcement of Price Deregulation and analyzed a factor. The results of the study are follows, after Enforcement of Price Deregulation, unit plan of apartment lead to change lay out, to secure each family's privacy, to secure feeling for open hearted, tendency of flexibility.

  • PDF

Deriving Factors Affecting Energy Usage for Improving Apartment Energy Consumption Evaluation (공동주택 에너지 사용량 평가 개선을 위한 에너지 사용량 영향 요인 도출)

  • Eum, Mi-Ryeong;Hong, Won-Hwa;Lee, Ji-Ae
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.7
    • /
    • pp.27-34
    • /
    • 2018
  • The energy consumption of apartment houses is affected by various factors. The criteria for assessing current energy usage are area, region and purpose. The purpose of this study is to obtain the reliability of the method of evaluating the existing energy consumption certificate and to derive usable evaluation factors according to the correlation of factors affecting energy consumption. The research process collects energy usage data for apartment houses in Daegu and calculates statistical results through correlation analysis and multiple regression analysis. As a result, it was found that the power energy is influenced by the yearly factor of physical characteristics, and the heat energy and total energy usage are influenced by the energy source which is energy characteristic factor.

A Study on the Presumption of Construction Cost of Public Apartment by Analyzing Actual Construction Cost (실적공사비 분석을 통한 공공주택 공사비 추정에 관한 연구)

  • Yoon, Woo-Sung;Lee, Hyun-Chul;Lee, Han-Min;Go, Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.2
    • /
    • pp.132-144
    • /
    • 2009
  • In this study, the basic data for calculating the proper construction cost as minimizing the uncertainty at the stage of forecasting construction cost with the basis of the analysis on the actual construction cost within completed domestic public apartment house. In this regard, 23 public apartment houses by each region which were ordered by the Korea National Housing Corporation and completed from 2004 to 2007 were selected as the objects of study. Four works such as common temporary installation, construction work, civil work and machine/equipment work which are the important direct cost items based on the actually inputted and settled construction costs were classified by completion year, region, architectural area, and the distribution type considering inflation rate. The sequent actual construction costs per 3.3m2 were compared and analyzed by each work, the proper construction costs were analogized and the calculating formula were presumed with the basis of average actual construction costs to be analyzed and presented.