• Title/Summary/Keyword: chloride-induced corrosion

Search Result 109, Processing Time 0.03 seconds

Stress Corrosion Cracking of Heat Exchanger Tubes in District Heating System

  • Cho, Sangwon;Kim, Seon-Hong;Kim, Woo-Cheol;Kim, Jung-Gu
    • Corrosion Science and Technology
    • /
    • v.18 no.2
    • /
    • pp.49-54
    • /
    • 2019
  • The purpose of this paper is to present failure analysis, of the heat exchanger tube in a district heating system. SS304 stainless steel is used, as material for the heat exchanger tube. The heat exchanger operates in a soft water environment containing a small amount of chloride ions, and regularly repeats operation and standstill period. This causes concentration of chloride ions on the outer surface of the tube, as well as repeat of thermal expansion, and shrinkage of the tube. As a result of microscopic examination, cracks showed transgranular as well as branched propagation, and many pits were present, at the initiation point of each crack. Energy disperstive spectroscopy analysis showed Fe and O peak, as well as Cl peak, meaning that cracks were affected by Cl ion. Failure of the tube was caused by chloride-induced stress corrosion cracking by thermal stress, high temperature, and localized enrichment of chloride ions.

Strength deterioration of reinforced concrete column sections subject to pitting

  • Greco, Rita;Marano, Giuseppe Carlo
    • Computers and Concrete
    • /
    • v.15 no.4
    • /
    • pp.643-671
    • /
    • 2015
  • Chloride induced reinforcement corrosion is widely accepted to be the most frequent mechanism causing premature degradation of reinforced concrete members, whose economic and social consequences are growing up continuously. Prevention of these phenomena has a great importance in structural design, and modern Codes and Standards impose prescriptions concerning design details and concrete mix proportion for structures exposed to different external aggressive conditions, grouped in environmental classes. This paper focuses on reinforced concrete column section load carrying capacity degradation over time due to chloride induced steel pitting corrosion. The structural element is considered to be exposed to marine environment and the effects of corrosion are described by the time degradation of the axial-bending interaction diagram. Because chlorides ingress and consequent pitting corrosion propagation are both time-dependent mechanisms, the study adopts a time-variant predictive approach to evaluate residual strength of corroded reinforced concrete columns at different lifetimes. Corrosion initiation and propagation process is modelled by taking into account all the parameters, such as external environmental conditions, concrete mix proportion, concrete cover and so on, which influence the time evolution of the corrosion phenomenon and its effects on the residual strength of reinforced concrete columns sections.

Influence of Binder Type on the Chloride Threshold Level for Steel Corrosion in Concrete

  • Moon Han-Young;Ann Ki-Yong;Jung Ho-Seop;Shin Dong-Gu
    • Journal of the Korea Concrete Institute
    • /
    • v.17 no.4 s.88
    • /
    • pp.663-670
    • /
    • 2005
  • The present study concerns the influence of binder type on the chloride-induced corrosion being accompanied by the chloride threshold level (CTL), chloride transport and as their results the corrosion-free lift. Two levels of cement content, $30\%$ PFA and $65\%$ GGBS concrete were employed. It was found that the most dominant factor to the CTL is the entrapped air void content at the steel-concrete interface, irrespective of the chloride binding capacity, binder type and acid neutralisation capacity of cement matrix. The CTL for lower interfacial air void contents was significantly increased up to $1.52\%$ by weight of cement, whereas a same mix produced $0.35\%$ for a higher level of voids. Because of a remarkable reduction in the diffusion fur GGBS concrete, its time to corrosion ranges from 255 to 1,250 days, while the corrosion-free life for control varies from 20 to 199 days sand for $30\%$ PFA concrete from 200 to 331 days.

Seismic damage estimation of reinforced concrete framed structures affected by chloride-induced corrosion

  • Anoop, M.B.;Rao, K. Balaji
    • Earthquakes and Structures
    • /
    • v.9 no.4
    • /
    • pp.851-873
    • /
    • 2015
  • A methodology for estimation of statistical properties (viz. mean and standard deviation) of the expected seismic damage to reinforced concrete framed structures subject to corrosion of reinforcement, over a specified reference time (typically the service life of the structure) is proposed in this paper. The damage to the structure under the earthquake loading is characterised by the damage index, determined using the modified Park and Ang damage model. The reduction in area, yield strength and strain at ultimate of steel reinforcement, and the reduction in compressive strength of cover concrete due to corrosion are taken into account in the estimation of damage. The proposed methodology is illustrated through an example problem. From the results obtained, it is noted that there is an increase of about 70% in the mean value of expected seismic damage to the reinforced concrete frame considered over a reference time of 30 years when effect of corrosion is taken into consideration. This indicates that there is a need to consider the effect of corrosion of reinforcement on the estimation of expected seismic damage.

Evaluation of Performance of Protective Surface Coating for Concrete

  • Ahn, Tae Song;Cheong, Hai Moon
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2003.05a
    • /
    • pp.1061-1066
    • /
    • 2003
  • Chloride penetration into concrete is the main cause of the steel corrosion in concrete structures exposed to chloride-rich environments. Protective surface coatings are increasingly being applied to concrete structures to reduce chloride penetration. In this study, the performance of various surface coatings was evaluated. Most coatings showed good results for the various tests of the performance evaluation. Surface coatings can delay deterioration such as chloride-induced reinforcing bar corrosion effectively.

  • PDF

Correlation between chloride-induced corrosion initiation and time to cover cracking in RC Structures

  • Hosseini, Seyed Abbas;Shabakhty, Naser;Mahini, Seyed Saeed
    • Structural Engineering and Mechanics
    • /
    • v.56 no.2
    • /
    • pp.257-273
    • /
    • 2015
  • Numerical value of correlation between effective parameters in the strength of a structure is as important as its stochastic properties in determining the safety of the structure. In this article investigation is made about the variation of coefficient of correlation between effective parameters in corrosion initiation time of reinforcement and the time of concrete cover cracking in reinforced concrete (RC) structures. Presence of many parameters and also error in measurement of these parameters results in uncertainty in determination of corrosion initiation and the time to crack initiation. In this paper, assuming diffusion process as chloride ingress mechanism in RC structures and considering random properties of effective parameters in this model, correlation between input parameters and predicted time to corrosion is calculated using the Monte Carlo (MC) random sampling. Results show the linear correlation between corrosion initiation time and effective input parameters increases with increasing uncertainty in the input parameters. Diffusion coefficient, concrete cover, surface chloride concentration and threshold chloride concentration have the highest correlation coefficient respectively. Also the uncertainty in the concrete cover has the greatest impact on the coefficient of correlation of corrosion initiation time and the time of crack initiation due to the corrosion phenomenon.

Prediction of Steel Corrosion and Corrosion Cracking in Reinforced Concrete Structures (철근콘크리트 구조물의 철근부식과 부식균열의 발생 예측)

  • 김호진;조호진;송하원;변근주
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2003.05a
    • /
    • pp.657-662
    • /
    • 2003
  • In this study. a micro-corrosion model of steel in RC structure is established for micro-structure development in view to micro-mechanics and the model is composed of chloride penetration model and oxygen diffusion model to evaluate for corrosion rate and accumulated corrosion amounts. Also the model is composed of corrosion-cracking model for prediction of corrosion-cracking. The time and space dependent induced corrosion-cracking of RC structures including changes of corrosion rates and concentrations of chloride ion are simulated using the finite element analysis adopted the proposed model Then, results of the analysis are compared with test results for verification.

  • PDF

Prediction of Chloride Profile considering Binding of Chlorides in Cement Matrix

  • Song, Ha-Won;Lee, Chang-Hong;Ann, Ki Yong
    • Corrosion Science and Technology
    • /
    • v.8 no.2
    • /
    • pp.81-88
    • /
    • 2009
  • Chloride induced corrosion of steel reinforcement inside concrete is a major concern for concrete structures exposed to a marine environment. It is well known that transport of chloride ions in concrete occurs mainly through ionic/molecular diffusion, as a gradient of chloride concentration in the concrete pore solution is set. In the process of chloride transport, a portion of chlorides are bound in cement matrix then to be removed in the pore solution, and thus only the rest of chlorides which are not bound (i.e. free chlorides) leads the ingress of chlorides. However, since the measurement of free/bound chloride content is much susceptible to environmental conditions, chloride profiles expressed in total chlorides are evaluated to use in many studies In this study, the capacity of chloride binding in cement matrix was monitored for 150 days and then quantified using the Langmuir isotherm to determine the portions of free chlorides and bound chlorides at given total chlorides and the redistribution of free chlorides. Then, the diffusion of chloride ion in concrete was modeled by considering the binding capacity for the prediction of chloride profiles with the redistribution. The predicted chloride profiles were compared to those obtained from conventional model. It was found that the prediction of chloride profiles obtained by the model has shown slower diffusion than those by the conventional ones. This reflects that the prediction by total chloride may overestimate the ingress of chlorides by neglecting the redistribution of free chlorides caused by the binding capacity of cement matrix. From the evaluation, it is also shown that the service life prediction using the free chloride redistribution model needs different expression for the chloride threshold level which is expressed by the total chlorides in the conventional diffusion model.

Current Status on the Chloride Content and Carbonation of Train Structures in the East (동해안 39개 철도구조물의 염화물 함유량과 중성화에 대한 현황분석)

  • Lee, Young-Jae;Kim, Yong-Hee;Lee, Yoon-Young
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.7 no.1
    • /
    • pp.259-266
    • /
    • 2003
  • Recently, the premature corrosion for reinforced concrete structure exposed to chloride bring about a serious problem in concrete structures. Specially, the concrete structures of sea coast are exposed much to chloride which make rapid corrosion. Thus, construction activities and maintenances for marine facilities are more demanded than those for land structures. The results of this study have been analysed to identify the extent of chloride content and incidence of carbonation for construction age. After measuring chloride content in concrete, it was conclued that about 90% of all tests on concrete samples exceed the acceptable maximum limit to risk of chloride-induced carbonation. The carbonation rate coffnient by age of train structures in the east eatimated 6. 55, 4.76 grater than 3. 727. In the basis of this result, it is necessary to maintenance for the important train facilities with the regular tests of chloride and carbonation.

Service life prediction of a reinforced concrete bridge exposed to chloride induced deterioration

  • Papadakis, Vagelis G.
    • Advances in concrete construction
    • /
    • v.1 no.3
    • /
    • pp.201-213
    • /
    • 2013
  • While recognizing the problem of reinforcement corrosion and premature structural deterioration of reinforced concrete (RC) structures as a combined effect of mechanical and environmental actions (carbonation, ingress of chlorides), emphasis is given on the effect of the latter, as most severe and unpredictable action. In this study, a simulation tool, based on proven predictive models utilizing principles of chemical and material engineering, for the estimation of concrete service life is applied on an existing reinforced concrete bridge (${\O}$resund Link) located in a chloride environment. After a brief introduction to the structure of the models used, emphasis is given on the physicochemical processes in concrete leading to chloride induced corrosion of the embedded reinforcement. By taking under consideration the concrete, structural and environmental properties of the bridge investigated, an accurate prediction of its service life is taking place. It was observed that the proposed, and already used, relationship of service lifetime- cover is almost identical with a mean line between the lines derived from the minimum and maximum critical values considered for corrosion initiation. Thus, an excellent agreement with the project specifications is observed despite the different ways used to approach the problem. Furthermore, different scenarios of concrete cover failure, in the case when a coating is utilized, and extreme deicing salts attack are also investigated.