Probabilistic GMP Calculation Method based on BIM (BIM기반 확률론적 GMP 산정방안에 관한 연구)

  • Go, Gun-Ho;Jin, Zheng-Xun;Kim, Hyun-Joo;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.122-123
    • /
    • 2018
  • Recently, CM at Risk delivery system(CM@R) that could solve the problems of Design Bid Build delivery(DBB) system has been emerging. In the CM@R delivery system, the contractor negotiates for a maximum guaranteed price(GMP) with the client at the design stage, and the contractor carries out the construction within the GMP. In CM @ R, the construction company with expertise in construction participates from the design stage to reflects the construction know-how in the design. On the other hand, the modification design frequently occurs due to the change of the construction cost when negotiating the GMP. In addition, uncertainties are inherent in the GMP calculation because the calculation is based on unfinished drawings and documents. This study proposes a probabilistic GMP estimation method applying MCS to the BIM - based cost prediction model, in order to extract the accurate quantity information when estimating the GMP and to cope with the change of the construction cost inherent in uncertainty.

  • PDF

Virtual Constructions Design using 3ds Max (3ds Max를 이용한 가상 건축물 설계)

  • Han, Jung-Soo;Kim, Gui-Jung
    • Journal of Digital Convergence
    • /
    • v.11 no.4
    • /
    • pp.273-278
    • /
    • 2013
  • This paper simulated the virtual constructions design that helps make constructions design effectively done by assembling materials as components and patterns using studs in steel house method. We also propose the virtual constructions design technology which makes change of constructing easy and reduces the cost effectively through a simulation of construction design like design, analysis, change information, and assembly in the construction field. It especially is possible for designers and users to change internal and external of a construction easily by using patterns.

3D Virtual Building Technic using Pattern (패턴을 이용한 3D 가상 건축 기술)

  • Han, Jung-Soo;Kim, Gui-Jung
    • The Journal of the Korea Contents Association
    • /
    • v.10 no.8
    • /
    • pp.66-72
    • /
    • 2010
  • This paper is focus on 3D virtual building design technic that construction materials are showed by components and these components are part of patterns, and building design using pattern is possible. To use this technique in process of construction, design, analysis, change, assembly, etc, we will develop flexible building design system that it supports efficient building change and low cost by construction design simulation. Specially also the designer and the user use a pattern and easily will be able to change the building and according to change pattern information of the materials, design of the buildings which are changed creates automatic. Also we will implement knowledge retrieval engine which is necessary to personal skill or visualization.

A Study on the Change of Critical Elements of the Design Evaluation during the last two Decades - Focused on Architectural Competition in Germany - (최근 20년간 디자인 평가항목 변천에 관한 연구 - 독일설계경기를 중심으로 -)

  • Cho, Ja-Yeon
    • Korean Institute of Interior Design Journal
    • /
    • v.20 no.2
    • /
    • pp.3-9
    • /
    • 2011
  • In this study, the change of critical elements of the design evaluation was investigated during two decades at the architectural competition which was held nationwide in Germany. Specifically, the periods of investigation span both from July 1989 to June 1990 and from July 2009 to June 2010. The results of the analysis show that the cost of construction, the maintenance cost, the design of facade and the energy conservation are being magnified for the new important elements. The images of buildings and the economic aspects are meant to be high. The frequency of the critical elements for interior spaces is approximately two times more important than those for the forms and outdoor spaces. Overall, many juries of the architectural competition in Germany were interested in the elements for interior spaces. The field of function accounts for roughly the half of four basic architectural fields such as function, others, aesthetic and construction fields. The critical elements are required persistently such as context, Circulation, organization of space, form, landscape and outdoor space design, arrangement of building, cost of construction, function, design of facade, location of main entrance. These items are regarded as the most important elements of the design evaluation at the competition. Knowing the change of critical elements of the design evaluation, we can understand the trend of architecture in Germany. The results of this study can be applied in Korea to develop the critical elements of design.

Case Study of Characteristic of Ground Deformation and Strut Axial Force Change in Long Span Deep Excavation(I) (장지간 깊은 굴착에서 지반변형 및 버팀보 축력변화 특성 사례연구(I))

  • Kim, Sung-Wook;Han, Byung-Won
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.03a
    • /
    • pp.308-319
    • /
    • 2009
  • In the case of relatively good ground and construction condition in the deep excavation for the construction of subway, railway, building etc., flexible earth retaining systems are often used in an economical point of view. It is generally known that the mechanism of behavior in the flexible earth retaining system is relatively more complicated than the rigid earth retaining system. Moreover in the case of long span strut supporting system the analysis of strut axial force change becomes more difficult when the differences of ground condition and excavation work progress on both sides of excavation section are added. When deeper excavation than the specification or installation delay of supporting system is done or change of ground condition is faced due to the construction conditions during construction process, lots of axial force can be induced in some struts and that can threaten the safety of construction. This paper introduces two examples of long span deep excavation where struts and rock bolts were used as a supporting system with flexible wall structure. And the sections of two examples are 50 meters apart in one construction site, they have almost similar design and construction conditions. The characteristics of ground deformation and strut axial force change were analysed, the similarity and difference between measurement results of tow examples were compared and investigated. The effort of this article aims to improve and develop the technique of design and construction in the coming projects having similar ground condition and supporting method.

  • PDF

Deduction and Management of Change Order Management Factors through Dispute Case Analysis - Focusing on Korean Commercial Arbitration Board Arbitration Case - (설계변경 분쟁 사례분석을 통한 설계변경 관리요인 도출 및 관리방안 - 대한상사중재원 중재 사례 분석 중심 -)

  • Yeon, Heejung;Hyun, Chang-Taek;Lee, Sanghoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.365-366
    • /
    • 2023
  • The purpose of this study is to prevent dispute due to change orders in construction projects and to handle change orders smoothly. For this purpose, this study analyzed arbitration cases caused by change order handled by the Korea Commercial Arbitration Board. Based on this, dispute factors were analyzed and change order management factors and management plans were presented. Change order management factors were derived from responsibility, contract, design, process, construction cost, and schedule management, and a detailed management plan according to the relevant factor was presented.

  • PDF

Research Integrated Change Process for Configuration Management of Construction Nuclear Power Plant (건설원전 형상관리를 위한 통합변경프로세스 연구)

  • Park, Youjin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.231-232
    • /
    • 2016
  • Configuration Management (CM) is a process of identifying and documenting the characteristics of a Structures, Systems and Components (SSCs), and of ensuring that changes to these characteristics are properly assessed, approved, issued, implemented and verified. There are requirement management, change control, facility configuration information management for CM activities. In order to improve safety of Nuclear Power Plant(NPP), it is necessary to manage change item systematically. Existing CM concept is focused on the NPP in operation. On the other hand, NPP under construction is difficult to efficiently manage the change because of different change process from varoius stake-holders. This research considers method of consolidation change process for NPP to ensure that approved changes are accurately reflected in the design requirements, facility configuration information, and the physical configuration.

  • PDF

A Study on the Analysis of Change Order - Claim in Design-Build (설계시공 일괄입찰공사에서 설계변경 클레임요인의 분석에 관한 연구)

  • Lee, Sang-Beom;Hwang, Jae-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.301-304
    • /
    • 2006
  • The insistence of rights and interests in contract is being generalized by opening in construction market which is following F.T.A, internationally. Conditions of contract in construction have different specialities compared with other industries. Different conditions of contract should be established because of a specific character that is different from each construction, such as work, environment, circumference conditions. Although the order of Turn-key is being expanded by increasing construction scale and demanding hybrid function, the suitable regulations of contract are not settled. As a result, various factors of claim is occurring in Change Order-Claim, because they just obey a part of guide-line. This study suggests useful solutions in detail concerned with the main factor of Change Order-Claim by each D/B phases through practical sorting and analysis of the causes of Change Order-Claim.

  • PDF

A study on Performance Contents of the Slope and Soft Clay Structures (사면 및 연약지반 구조물 기초의 성능기준 항목에 관한 연구)

  • Yang, Tae-Seon;Koo, Jai-Dong;Kim, Je-Kyung
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.03a
    • /
    • pp.507-511
    • /
    • 2009
  • This paper describes the performance design requirements of the slope and soft clay structures to confirm several contents of foundations systems to change existing design code to new one in the construction market. The concepts of performance design explain systematical needs for specific performance guidelines.

  • PDF

Developing an Urban Planning Model for Climate Change Adaptation

  • Kim, Jong-Kon;Rhim, Joo-Ho;Lee, Sung-Hee
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.51-53
    • /
    • 2015
  • As abnormal climate phenomena occur more frequently due to climate change, damage which results from meteorological disaster increases accordingly and its scale and variety are becoming wider. This paper draws out planning and design elements and application techniques to build cities more adaptive to climate change from urban development cases in US and Europe. An urban model is suggested, that enables built environment to be more resilient to risks caused by climate change is applicable to urban development projects in practice.