• Title/Summary/Keyword: cargo operation

Search Result 307, Processing Time 0.021 seconds

Motion and sloshing analysis for new concept of offshore storage unit

  • Ha, Mun-Keun;Kim, Mun-Sung;Paik, Bu-Keun;Park, Chung-Hum
    • Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
    • /
    • 2000.10a
    • /
    • pp.189-195
    • /
    • 2000
  • New concept of LNG-FPSO ship with moonpool and bilge step in bottom is considered and investigated in the point of motion reduction and sloshing phenomena of the cargo and operation tanks. The cargo capacity of the ship of which principle dimensions is L x B x D x t(design) =270.0 x 51.0 x 32.32 x 13.7(m) 16K at 98% loading condition. The two moonpools and rectangular step at bilge part are setted up specially for getting the effect of motion decrease. For the motion analysis, linearized three dimensional diffraction theory with the simplified boundary conditions is used. The six-degree of freedom coupled motion responses are calculated for the LNG-FPSO ship. Viscous effects on the roll motion responses of a vessel are taken into account in this calculation program using an empirical formula suggested by Ikeda, Himeno and Tanaka is used. The case study for the moonpool size had been carried out by theoretical estimation and experimental method. For the optimization of the moonpool size and effect of the step, 9 cases of its size and with and without step are considered. From the results of calculation and experiment, it can be concluded that this designed LNG-FPSO ship have possibility to carry out her missions in the rough sea as for the owner's demand waves condition. The motion responses, especially roll motion, for the designed LNG-FPSO ship are much lower than those of another drillship and shuttle tanker and limit criterions are satisfied. For the check of the cargo tank and operation tank sizes we have performed sloshing analysis in the irregular waves which focuses on the pressure distribution on the tank wall and the time history of pressure and free surface for No.2 and No5. tanks of LNG-FPSO with chamfers. Finally we got the tank size which has no resonance and no impact pressure in all filling in the bow quartering and beam sea.

  • PDF

Motion and Sloshing Analysis for New Concept of Offshore Storage Unit

  • Ha, Mun-Keun;Kim, Mun-Sung;Paik, Bu-Keun;Park, Chung-Hum
    • International Journal of Ocean Engineering and Technology Speciallssue:Selected Papers
    • /
    • v.5 no.1
    • /
    • pp.22-28
    • /
    • 2002
  • A New concept for the LNG-FPSO ship, with moonpool and bilge step in bottom, is proposed. This concept is investigated with regard to motion reduction and sloshing phenomena of the cargo and operation tanks. The principal dimensions of the ship are $L\timesb B\times D\times t(design)=270.0\times51.0\times32.32\times13.7(m)$, with a total cargo capacity of 161KT; a 98% loading condition is considered for this study. The moonpools and rectangular step at the bilge have been designed for the purpose of decreasing the motion within the tank. For the motion analysis, linearized three-dimensional diffraction theory, with the simplified boundary condition was used. The six-degree of freedom coupled motion responses were calculated for the LNG-FPSO ship. Viscous effects on the roll motion responses of a vessel were taken into account in this calculation program, using an empirical formula suggested by Himeno(1981). The case study for the moonpool size has been conducted using theoretical estimation and the experimental method. For the optimization of the moonpool size and effect of the bilge step, 9 cases of its size, both with and without bilge step, were involved in the study. no motion responses, especially roll motion, for the designed LNG-FPSO ships are much lower than those of other drill ships and shuttle tankers. The limit criterions are satisfied. To check the cargo tank and operation tank sizes, we performed a sloshing analysis in the irregular waves which focuses on the pressure distribution on the tank wall and the time history of pressure and free surface for No.2 and 5 tanks of LNG-FPSO with chamfers. Finally, optimum tank sire was estimated.

  • PDF

Sloshing design load prediction of a membrane type LNG cargo containment system with two-row tank arrangement in offshore applications

  • Ryu, Min Cheol;Jung, Jun Hyung;Kim, Yong Soo;Kim, Yooil
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.8 no.6
    • /
    • pp.537-553
    • /
    • 2016
  • This paper addresses the safety of two-row tank design by performing the extensive sloshing model tests. Owing to the uncertainties entangled with the scale law transforming the measured impact pressure up to the full scale one, so called comparative approach was taken to derive the design sloshing load. The target design vessel was chosen as 230 K LNG-FPSO with tow-row tank arrangement and the reference vessel as 138 K conventional LNG carrier, which has past track record without any significant failure due to sloshing loads. Starting with the site-specific metocean data, ship motion analysis was carried out with 3D diffraction-radiation program, then the obtained ship motion data was used as 6DOF tank excitation for subsequent sloshing model test and analysis. The statistical analysis was carried out with obtained peak data and the long-term sloshing load was determined out of it. It was concluded that the normalized sloshing impact pressure on 230 K LNG-FPSO with two-row tank arrangement is higher than that of convectional LNG carrier, hence requires the use of reinforced cargo containment system for the sake of failure-free operation without filling limitation.

Third Wave of Gas Management System in LNG Carrier - VaCo System (LNG 운반선에서의 신개념 증발 가스 처리 시스템 - VaCo 시스템)

  • Choi, Jung-Ho;Yoo, Hong-Sung;Yoo, Kyung-Nam;Heo, An;Lee, Dou-Yeong;Lyy, Sung-Kak
    • Special Issue of the Society of Naval Architects of Korea
    • /
    • 2007.09a
    • /
    • pp.89-93
    • /
    • 2007
  • The Boil-off gas (BOG) generation during the voyage is inevitable since Natural Gas (NG) in normally liquefied below -160 degree C in atmosphere condition and small heat ingress due to relatively hot outside keeps evaporating continuously. The one of major issue in LNG carriers is to handle generated BOG from cargo tank. The generated BOG affects to increase the cargo tank pressure and Gas Management System (GMS) for LNG carriers is closely related to cargo tank pressure maintenance. Economically, BOG is generally used as fuel in LNG carrier. Newly developed GMS for LNG carrier in boiler propulsion system, VaCo System, not only accomplish automatic control in GMS but also ensure safer operation.

  • PDF

Ice Collision Analyses for Membrane Tank Type LNG Carrier

  • Suh, Yong-Suk;Ito, Hisashi;Chun, Sang-Eon;Han, Sang-Min;Choi, Jae-Yeon;Urm, Hang-Sub
    • Journal of Ship and Ocean Technology
    • /
    • v.12 no.1
    • /
    • pp.35-44
    • /
    • 2008
  • As arctic energy resource is attracting public attention, arctic shipping market will also be growing in large as expected to increase in LNG trade from Arctic area to the western countries by shipping. During the voyages through such routes, collision with icebergs may be possible. In the present report, ice collision analyses are carried out from a practical point of view to verify the safety of hull structural strength of LNG carriers equipped with GTT $MKIII^{TM}$ membrane type cargo containment system. From the results of collision analyses and the operation-friendly design concept of no-repairing of cargo containment system, a safe operating envelope against ice collision is proposed for LNG carriers of membrane type cargo containment system. Based on the currently proposed safety criteria, it is concluded that LNG carriers with membrane tank type can operate safely with regard to the integrity of CCS in regions where collision between LNG carrier and iceberg is expected.

An Analysis on the Logistics Efficiency of Shanghai Port for Global Supply Chain

  • SHENG, Yi-Peng;KIM, Yong-Jeong
    • Journal of Distribution Science
    • /
    • v.19 no.7
    • /
    • pp.29-39
    • /
    • 2021
  • Purpose: As China experienced a crisis due to Covid-19, the global supply chain collapsed and affected the world. Therefore, it is time for a change in port operational efficiency, increasing in importance with changes in the global supply chain. This study analyzed Shanghai Port's efficiency, the world's largest port and representative hub port in Northeast Asia, by looking at the relationship between facility factors and cargo throughput to present hub port development's timely implications. Research design, data and methodology: This study applied the Charnes, Cooper, and Rhodes (CCR) and Banker, Chames, and Cooper (BCC) models of the data development analysis (DEA) to construct an analysis from the input-oriented and output-oriented perspectives. Results: As a result, Yidong Container Terminal can be considered the most optimized in facilities and operation processes. Yidong and Shengdong Container Terminal should maintain current operating levels, while Pudong Container Terminal should review facility investments. Also, Zhendong, Huong, Mingdong, and Guandong Container Terminal should be reviewed to increase cargo throughput or to adjust current input variables in the current state. Conclusions: Therefore, the utilization of the container terminal input variables should be reviewed, and the factors of inefficiency should be improved. Moreover, the strategic focus of container terminal operations should be on increasing annual cargo throughput.

Basic Analysis for Improvement of Mooring Stability Under Long Wave Impact

  • Ha, Chang-Sik;Moon, Seung-Hyo;Lee, Joong-Woo
    • Journal of Navigation and Port Research
    • /
    • v.41 no.5
    • /
    • pp.329-336
    • /
    • 2017
  • This study suggests a general process of analyzing the mooring and cargo handling limit waves, which is an incident to the new energy port under long wave agitation. To reduce damages of ships and harbor structures due to strong wave responses, it is necessary to predict the change of wave field in the mooring berth to make the proper decision by dock master. The berthing area at a new LNG port in the east coast of Korea in this study is frequently affected by oscillations from waves of 8.5~13s periods in the wintertime. The long period waves give difficulties on port operation by lowering the annual berthing ratio. It needs to find the event waves from the real time offshore wave records, which cause over the mooring limits. For that purpose, the wave records from field measurement and offshore wave buoy were analyzed. From numerical simulation, the response characteristics of long period waves in the berthing area were deduced with or without breakwater expansion plan, analyzing the offshore field wave data collected for two years. Some event wave cases caused over the cargo handling and mooring limits as per the standard Korean port design guideline, and those were used for the decision of port operation by dock master, comparing with the real time offshore wave observations.

Research on Deriving Requirements through Operational Scenarios and Interface Analysis of Future Logistics Transportation System based on Underground Tunnels (지하터널기반 미래물류 운송체계의 운영 시나리오 및 인터페이스 분석을 통한 요구사항 도출 연구)

  • Myung Sung Kim; Sung Jin Lee;Young Min Kim;Na Hyun Yi
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.20 no.spc1
    • /
    • pp.65-75
    • /
    • 2024
  • As the demand for logistics services increases rapidly in modern society, the existing freight delivery system through road transportation is caused various problems such as traffic congestion and greenhouse gas emissions. To solve that, the development of an 'underground logistics tunnel-based cargo transportation system' is currently being considered in Korea. In order to build a new concept stable and safe logistics system, derive system design requirements and functional specifications, and reflect them at the development of target system. In this study, to make foundation for development of an "underground logistics tunnel-based cargo transportation system," define system components through analysis from a hierarchical perspective, and the functions of each component were analyzed and defined. We identified what interfaces the components have at each stage of the operating process. Lastly, we defined a detailed operation scenario based on the previously derived results, deriving target system functional requirements.

The Operation, Problems and Long-term Development Policy of Gwangyang Port in Northeast Asia - With Regard to Logistics Hub Strategy - (동북아시대 광양항의 운영실태와 장기 발전방안 -물류거점화를 중심으로-)

  • 정봉현;최정우
    • Journal of Korea Port Economic Association
    • /
    • v.20 no.1
    • /
    • pp.21-42
    • /
    • 2004
  • This paper addresses the operation, problems, and development policy of Gwangyang Port, Korea. This paper aims to analyze the operation condition and problems of Gwangyang Port and suggest long-term policies for developing Gwangyang Port as a logistic hub in northeast period. It is made up of three main sections: the operation, problems, and forecast of freight volumes; analysis of operational results of Gwangyang Port; development strategies of Gwangyang Port as a Logistics Hub. This paper was mainly based on a review of current papers/reports, an analysis of secondary data, and questionnaire survey. The major development strategies identified consisted of expansion regular service sea-route, formation of inter-modal transportation system, strengthening of port sales for Gwangyang port's recognition, securing operation-profits by fixed cargo volume, and promotion of free tread zone.

  • PDF

Comparative Analysis on the Competitiveness between Busan New Port and Shanghai's New Yangshan Port (상하이 양산항과 신항(Busan New Port)의 경쟁력 비교분석)

  • Han, Chul-Hwan
    • Journal of Korea Port Economic Association
    • /
    • v.22 no.1
    • /
    • pp.39-59
    • /
    • 2006
  • The purpose of this paper is to analyze the competitiveness between Busan New Port and Shanghai's New Yangshan Port, on an island 20 miles off the Chinese mainland coast. For this aim, the paper examines backgrounds of Yangshan Port construction and its related projects, namely, Donghai Bridge and Luchao Logistics Park including operation strategies of Yangshan New Deepwater Port. The main results of this paper are as follows: Busan New Port has competitive advantage over Yangshan Port in terms of ideal location, especially in Asia-North America route, and connection between terminal and hinterland logistics park. Because Busan New Port is operated by fully on-dock system. Nevertheless, Yangshan Port has more strength in its centrality, port tariff and port productivity, which are represented by crane productivity, quay productivity and area productivity. Therefore, Korean ports are recommended by transformation from cargo attraction-type to cargo generation-type port through early activation of port logistics center along with Free Economic Zone.

  • PDF