A Critical Path Search and The Project Activities Scheduling (임계경로 탐색과 프로젝트 활동 일정 수립)

  • Lee, Sang-Un
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.12 no.1
    • /
    • pp.141-150
    • /
    • 2012
  • This paper suggests a critical path search algorithm that can easily draw PERT/GANTT chart which manages and plans a project schedule. In order to evaluate a critical path that determines the project schedule, Critical Path Method (CPM) is generally utilized. However, CPM undergoes 5 stages to calculate the critical path for a network diagram that is previously designed according to correlative relationship and execution period of project execution activities. And it may not correctly evaluate $T_E$ (The Earliest Time), since it does not suggest the way how to determine the sequence of the nodes activities that calculate the $T_E$. Also, the sequence of the network diagram activities obtained from CPM cannot be visually represented, and hence Lucko suggested an algorithm which undergoes 9 stages. On the other hand, the suggested algorithm, first of all, decides the sequence in advance, by reallocating the nodes into levels after Breadth-First Search of the network diagram that is previously designed. Next, it randomly chooses nodes of each level and immediately determines the critical path only after calculation of $T_E$. Finally, it enables the representation of the execution sequence of the project activity to be seen precisely visual by means of a small movement of $T_E$ of the nodes that are not belonging to the critical path, on basis of the $T_E$ of the nodes which belong to the critical path. The suggested algorithm has been proved its applicability to 10 real project data. It is able to get the critical path from all the projects, and precisely and visually represented the execution sequence of the activities. Also, this has advantages of, firstly, reducing 5 stages of CPM into 1, simplifying Lucko's 9 stages into 2 stages that are used to clearly express the execution sequence of the activities, and directly converting the representation into PERT/GANTT chart.

Study(VII) on Development of Charts and Equations Predicting Bearing Capacity for Prebored PHC Piles Socketed into Weathered Rock through Sandy Soil Layers - Allowable Axial Compressive Bearing Capacity Formulae - (사질토를 지나 풍화암에 소켓된 매입 PHC말뚝에서 지반의 허용압축지지력 산정도표 및 산정공식 개발에 관한 연구(VII) - 지반의 허용압축지지력 산정공식 -)

  • Kwon, Oh-Kyun;Nam, Moon S.;Lee, Wonje;Yea, Geu Guwen;Choi, Yongkyu
    • Journal of the Korean Geotechnical Society
    • /
    • v.35 no.12
    • /
    • pp.69-89
    • /
    • 2019
  • Design chart solution and table solution were proposed by Choi et al. (2019a), which conducted a parametric numerical study for the bored PHC piles socketed into weathered rocks through sandy soil layers. Based on the Choi et al. (2019a), the new prediction formulae for mobilized capacity components such as total capacity, total skin friction and skin friction of sand at the settlement of 5% pile diameter were proposed in this study. The proposed prediction formulae (EQ-G1) considers pile diameter, relative embedment length and ${\bar{N}}$ (i.e, corrected N) value and their verification results are as follows. The SRF calculated from the new proposed design method was 71~94%, which are greatly improved compared with results by the existing design method. The design efficiency of bearing capacity was in the range of reasonable design except 4 cases, and the design efficiency of the PHC pile was evaluated as 85%. Therefore, it is possible that allowable compressive load (Pall) of PHC pile can be utilized in the resonable design by means of the new proposed method using EQ-G1 equations. And the other new proposed equations of EQ-G2-3 can be utilized approximately in calculation of axial compressive bearing capacity components for prebored PHC pile.

Application of Fractal Dimension on Consistent Calculation of Coastline Length - Focused on Jeju Island (일관된 해안선 길이 산출을 위한 프랙탈 차원 적용 방안 연구 - 제주도를 중심으로 -)

  • Woo, Hee Sook;Kwon, Kwang Seok;Kim, Byung Guk;Cho, Seck Hyun
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.24 no.4
    • /
    • pp.83-88
    • /
    • 2016
  • The use of consistent coastlines is an important element for the systematic management of maritime boundaries and the interests of local governments. The Hydrographic and Oceanographic Agency conducted a preliminary survey for consistent coastline production, since 2001. As a result, the length of coastline was different by year. Because of the lack of systematic management, the use of incorrect data, etc. We also changed the coastline on the sea chart to show on a digital map for realization of terrain expression method. However, there was a variation in shoreline length due to various surveying techniques and shoreline extraction methods. In this paper, the characteristics of Jeju-do coastline were analysed by using a modified divider method of fractal dimension. The accuracy of the vectorization was determined by converting the actual distance in the Public Survey Amendment for proper divider use. With 1:5,000 and 1:25,000 digital maps of Jeju-si and Seogwipo-si each fractal dimensions were calculated. Jeju-si=1.14 and Seogwipo-si=1.12 in 1: 5,000. Jeju-si=1.13 and Seogwipo-si=1.10 in 1: 25,000. Calculated fractal dimension were correlated to data from digital maps. It was considered that complexity and scale of coastlines affected. In the future coastline length statistics and minimum ratio of calculated coastline length to original length need to be determined for consistency of coastline length statistics.

A Study on the Method and Work Measurement for Productivity Improvement of Clothing Products-With concentration in MTM Analysis- (의류제품의 생산성 향상을 위한 방법 및 작업측정에 관한 연구-MTM법을 중심으로-)

  • 김옥경;이순흥
    • Journal of the Korean Society of Costume
    • /
    • v.41
    • /
    • pp.185-206
    • /
    • 1998
  • The purpose of this study was to improve productivity for maximum effects with the present equipments and staff. This study compared and analyzed the mea-sured time by using stop watch method and MTM, which was the new measuring method. The flow and results of this study were as follows: 1. This study investigated the theoretical background the efficiency for production management, and the way of productivity improvement through documentary research. 2. Setting up the standard flow on the experi-mental company production, making out a process chart and measuring the actual working hour. 3. The study measured the allowance time applying work sampling. 4. Each process of the movement analysis was filmed by video to use basic data. 5. MTM analysis was taken by choosing 10 processes from front bodice according to the basic movement of MTM. Through the results, this study exclude unneccesary movements and suggest a method for working ways. 6. Using the actual working hour measured by a stop watch calculated the pitch time and presumed the amount of daily productivity. 7. The result of the work sampling came out as 38% of allowance rate. It was 13% higher than the standard amount of woman's jacket allowance rate, which was 25%. The most influencing factor was work discussion. That was because there were commuication problem of the work way between the operator and leader. More adequate use of flow table and level passing table was needed. There were the problems that inappropriate places and sizes made the distance of movements longer and often needed more adjustment of works and surroundings. To prevent breakdowns equipments check ups were necessary before works. 8. The results of MTM analysis were as follow : the time was reduced 40% than the actual measured time by a stop watch. This was because the leveling of the operator was included in the real calculation. Also, leveling was included in MTM analysis and all the conditions were standarized. Therefore MTM method was a scientidic measuring way of establishing the standard time. The presented method of this study, suggested an ideal method eliminating unneccesary motions, and presented standardization of works. Improvement of working methods, work condition and simplifying motions in each 10 processes reduced the working time from total 656 seconds to 301 seconds. 9. The way and time of working was linked together in the MTM analysis methods. Thus data from MTM help suggest not only establishing standard time but also establishing stan-dard work. Plus it includes various ability for improvements of working ways. So it is an objective method which can be widely used in other work studies. 10. The function of a time study is to determine the amount of work produced with a given method. The work rate is used to establish the cost of labor. The wage of worker must be calculated per unit time which is deter-mined before the time study is made. This study tried to introduce the incentive rule for deciding wages according to the standard time by MTM method.

  • PDF