• 제목/요약/키워드: building-up construction

검색결과 957건 처리시간 0.029초

Constructability and Economic Evaluation of Continuous Hoop Reinforcement Method

  • Kang, Su-Min;Park, Sung-Woo;Jang, Se-Woong;Jin, Jong-Min;Eom, Tae-Sung;Park, Hong-Gun
    • 한국건축시공학회지
    • /
    • 제13권3호
    • /
    • pp.291-305
    • /
    • 2013
  • This paper presents the continuous hoop reinforcement method as a means to overcome the difficulty of rebar construction due to the seismic detail of lateral reinforcement. Because the continuous hoop has no seismic hook, and there is less interference during the rebar work, rebar quantities and construction time can be reduced. Since the details of column and beam continuous hoops are different from those of conventional lateral reinforcements, the construction method should be developed through mock-up tests. The length of the beam mock-up is 8m and the section size is $500mm{\times}700mm$, the height of the column mock-up is 2.8m and 4m, and the section size is $800{\times}800mm$. The length and the size are determined based on the elements that are generally used in reinforced concrete basement parking lots and office buildings. The results of the mock-up test showed that the quantities of rebar could be reduced by 20% and the time could be reduced by up to 40% compared with conventional lateral reinforcements.

가중치 분석을 통한 도심지 Top-Down 공사에서의 공법요소 선정 모델 개발에 관한 연구 (A Study on the Sub-elements of the Top-down Construction Method Selection Model using Weighting Factor in Downtown Area)

  • 박창욱;문승윤;윤석현
    • 한국건축시공학회지
    • /
    • 제8권4호
    • /
    • pp.61-69
    • /
    • 2008
  • The size of the construction projects become huge and complex, and the depth of excavation for the underground structures become deeper. Also the working area is not enough for loading materials and temporary facilities. This is the most case of recent construction projects in downtown area. Top-down is the most useful method for this kind of construction projects. Top-down construction method consists of supporting method, retaining wall type, foundation type and construction direction such as up-down or up-up. construction managers have to select sub-elements for top-down construction method in planning phase. This study is to suggest the sub-elements selection model for the top-down construction method, and the case study is conducted for evaluating this model.

Design and Application of Self-Lifting & Slewing Multi-Cranes Platform

  • Kun Zhang;Kaiqiang Wang;Bo Chen;Qing Sun;Hui Yang;Xin Ba;Jinming Zhao
    • 국제초고층학회논문집
    • /
    • 제11권2호
    • /
    • pp.103-114
    • /
    • 2022
  • Tower crane is of great importance in the construction of high rise buildings. A self-lifting & slewing multi-cranes platform (referred to as crane slewing platform) was developed to optimize the configuration of tower cranes, as well as solve the problems of cooperative operation conflict between multiple cranes and other construction equipment and their respective climbing and occupying of construction period. The design and test of the slewing platform was introduced. By applying the slewing platform in the construction of Chengdu Greenland Center super high rise building project, some key technologies such as the configuration of cranes, the installation, construction and lifting of the slewing platform are implemented and validated. Up to now, the slewing platform has been safely lifted up 98 times in Chengdu Greenland Center project construction, and achieved good social and economic benefits.

중국 Top-Down 공법의 특징과 시공사례 분석 (Characteristics and Case Analysis of Top-Down Construction in China)

  • 방광수;임홍철;이해출;송지윤
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 춘계 학술논문 발표대회 학계
    • /
    • pp.41-44
    • /
    • 2009
  • Top-Down construction is becoming a popular construction method in China as there is a growing need for building high-rise structures in crowded urban areas. This paper deals with the explanation and analysis of characteristics of Top-Down construction in China. In China, usually construction site is relatively large or sometimes huge compared to that in Korea. Thus, as the high-rise portion of the building needs to be constructed first and fast, island method is used at the center p망t of the building. In the meanwhile, the remaining area of the building is constructed using Top-Down method to provide working area for equipments and workers. Also, the case studies of construction examples are provided in this paper. The purpose of this paper is to promote international understanding and interaction between neighborhood countries for the utilization of Top-Down construction.

  • PDF

건설현장 내 에너지 사용량에 따른 탄소배출량 분석에 관한 연구 (A Study on the Analysis of Carbon Emission according to Energy Usage in Construction Site)

  • 이충원;태성호;임효진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.215-216
    • /
    • 2023
  • As the introduction of new climate system, efforts to change carbon neutrality, efforts to convert carbon neutrality. In Korea, we are setting up carbon emissions through greenhouse gas and energy target management system for business and companies that emit carbon emissions. The construction industry quantitatively predict the carbon emissions, but it is struggling to set up the amount of carbon emissions before construction stage, but it is suffering from lack of data. Therefore, this study was conducted by collecting data on the energy usage amount of carbon emissions according to the energy usage of the construction phenomenon and low-capacity prediction of the construction phenomenon. Through collected data, the average energy usage amount by building users and evaluated the average carbon emissions. It also evaluated the contribution of carbon emissions by energy sources.

  • PDF

적층식 평판 키트형 카누 건조 기술 개발에 관한 연구 [1] - 카누 선체의 설계 및 적층식 평판 키트 분할 기법 - (A Study on the Development of Ship Building for the Wooden Canoe by Piling-up Laminated Wooden Plates Kit [1] - A Design for canoe hull and laminating wooden plates for piling-up kit -)

  • 김희중;김성현;정재현
    • Journal of Advanced Marine Engineering and Technology
    • /
    • 제33권5호
    • /
    • pp.762-769
    • /
    • 2009
  • A canoe is one of the most popular boats in leisure on the water. Generally canoe has been built by good wooden strips. And canoe built by FRP is used for business recently. But by the users' demands for good quality and the restriction to environmental pollution the wooden canoes are required for personal and canoe building business. The modern wooden canoes were built by the strip construction method are used typically. However it is not suitable for the mass productivity requires effective resource operations and managements of men, materials, times, and price. On this paper the new construction method, called the piling-up laminated construction method, is studied to building a canoe using the piling-up with the laminated wooden plates gives more productivity than the others. First a canoe with various curved surfaces is designed from 3D design system. And the hull of canoe model is divided horizontally to generating the laminated plates that will be converting real wooden plates available from the market and will be routed by the manufacturing machine. After the simulating and analyzing of piling-up with the laminated plates, the canoe is building with less times, less men, less resources, and lower price than other method, avoid of the requirements of additional building tools. On the next paper the constructing of a real canoe using the manufactured wooden plates will be studied.

집합건축물의 리모델링과 보수$\cdot$보강 사례연구 (A Case Study on the Remodeling and Repair/Rehabilitation of the Multi-Owned Buildings)

  • 정은철;정혜교;이희석;김승진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2005년도 춘계 학술기술논문발표대회 논문집
    • /
    • pp.219-222
    • /
    • 2005
  • Recently, remodeling has been a major field of the building construction that comes up for the alternatives of the reconstruction and the economical construction method. In the almost cases, the engineering capacity for the repair/rehabilitation of the remodeling should satisfy also the owner's various needs (eg, the minimum construction time, etc.) and the safety of the building. Also, the engineering and construction technique for remodeling should be applied to the contrary point of view of the general construction method. But, the many problem actually has arose from the wrongly applied construction method that is caused with the insufficient researches and development. Therefore, this study would suggest the necessities and the directions of developing the elementary engineering technique and the method that satisfy the owner's various needs for the remodeling and repair/rehabilitation of the multi-owned building as multiplex shop, with the successful construction cases.

  • PDF

시공단계 활용을 위한 BIM모델의 표현수준에 관한 연구 (A Study on the Expression Level of BIM Model for utilizing in Construction Phase)

  • 노혜라;윤석헌
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.253-254
    • /
    • 2016
  • In the trend of building enlargement, high-rise and irregular shaped building, domestic application of BIM in construction phase is increasing in recent years. BIM that is based on a three-dimensional, requires a specific building expression. Model expression level required for each phase such as design, construction, and maintenance of the construction project can be different. BIM model to apply in practice is difficult because it is not clear to set up the criteria for the expression level of construction BIM model. And it has a limit that is lower productivity in construction project. Therefore, this study considers the way of the improvement and analyzes the application for representation level of construction BIM model through the survey. By analyzing of the survey results, this study will be to present a basis for an appropriate expression level setting of construction BIM model.

  • PDF

트루텍 빌딩의 3차원 입체 커튼월 시공 (Construction of Aluminum Curtain Wall with 3D Elevation for TRUTEC Building)

  • 박철;홍두표
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.119-122
    • /
    • 2007
  • 트루텍(TRUTEC) 빌딩은 서울 마포구 상암동 DMC(Digital Media City) 단지 내에 위치한 오피스 빌딩이다. 본 건물은 독일 설계사무소의 원설계를 바탕으로 국내 실시설계가 이루어졌으며 지하 5층 지상 12층 중규모 건물로서 그 외관을 독특한 3차원 입체 유닛을 활용한 커튼월로 마감하였다. 기존의 커튼월 공사에서 보여주었던 평면적인 모델을 탈피하고 알루미늄 바를 3차원 입체 가공함으로써 사각형 박스의 단순하게 보여질 지 모르는 입면을 독특하게 구현해해는 데 성공했다. 18개월의 공기를 준수하기 위해 커튼월 공사는 공사계약시점부터 주요 공정으로 분리되어 공정관리가 이루어졌으며, 지속적인 공정 업데이트 및 유기적인 이해당사자 회의를 통해 디자인 현안들을 해결해 나갔다. 최초 시도되는 형태의 입면과 알루미늄 바의 가공방법에서 발생할 수 있는 리스크를 최소화하기 위하여 단계별 Mock-Up을 실시하였으며, 피드백을 통해 예상되는 문제점들을 도출하고 분석하였다. 이를 통해 촉박한 공기의 준수와 품질 확보를 이룰 수 있었다.

  • PDF

건설공사의 적시생산(Just-In-Time)을 위한 양중시스템 개발 (Development of the lift-up and procurement system for Just-in-Time in the Building Construction)

  • 신봉수;김창덕;서상욱;임형철;최윤기
    • 한국건설관리학회논문집
    • /
    • 제4권4호
    • /
    • pp.182-191
    • /
    • 2003
  • 초고층$\cdot$대형 현장은 일반 현장관리 방법과는 달리 경험에 의한 의사결정에는 한계가 있다. 특히 도심지 고층 공사의 경우 대지의 여유 공간이 협소하여, 자재적치와 수평 동선을 위한 공간의 확보가 용이하지 않다. 이러한 초대형 프로젝트를 수행하기 위해서는 기존 경험에 의존하는 양중 및 조달 관리의 한계성을 인식하고 새로운 양중 및 조달 관리 방법의 모색이 필요하게 되었다. 따라서 JIT의 개념을 도입하는 것이 필수적이라 하겠다 현장 내 즉, 반입 이후의 단계는 물리적인 자재의 흐름보다는 정보의 흐름과 의사소통이 중요시되는 단계로 본 연구에서는 현장 내 물류흐름의 문제점을 분석하여, 자재별 속성을 고려한 양중계획수립, 작업일정과 양중일정의 통합관리, 자재의 위치현황 및 작업의 설치현황 가시화를 통한 정보의 공유, 계획대비 실적의 평가의 부분을 시스템개발 방향으로 설정하여. 커뮤니케이션 도구로서의 역할과 계획 대비 실적 평가를 통한 계획의 신뢰도 확보 등을 주요 기능으로 하는 양중관리시스템을 개발하였다.