• Title/Summary/Keyword: building-up construction

Search Result 957, Processing Time 0.026 seconds

Factor Analysis for Environment Improving Budget of Facilities - Focused On School Facility In Gyeongsangnamdo - (시설물 환경개선 예산편성을 위한 항목분석 - 경상남도 학교시설물 중심으로 -)

  • Hong, Kang-Min;Yu, Hyeon-Ju;Ryu, Han-Guk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.255-256
    • /
    • 2015
  • House supplying rate of building facilities is over 100% in 2008. In modern society, many people are thus interested in maintenance phase of building facilities by environment improvement budget because 20 years or more of building facilities are increasing rapidly. Maintenance of building facilities is depending on various factors that impact on the environment improvement budget of building facilities. However, Various methods and factors are made up complex relationships. I will analyze that environment improvement budget associated with floor, gross area, local, school type, service life and other elements.

  • PDF

The Economic Feasibility of Building-Integrated Photovoltaics System Installed on the Roof of Residential Building - Focused on Comparison with Construction Cost of BAPV System Depend on Roof Finishing Materials

  • Oh, Byung-Chil
    • KIEAE Journal
    • /
    • v.17 no.1
    • /
    • pp.15-21
    • /
    • 2017
  • Purpose: This study was on the economic feasibility of BIPV system, focused on comparison with construction cost of BAPV system depend on roof finishing materials, and to suggest basic data on the construction cost. Method: Construction cost of BAPV system was calculated, by selecting asphalt single, flat type roof tile, color steel plate, titanium zinc plate as roof finishing material of residential building and by sum up each cost for roof finishing construction and cost for 3kWp-volumed PV module installation. Also, the economic feasibility was analysed quantitatively by comparing the cost for BIPV system construction, installing same volumed PV module instead of roof finishing materials. Result: 1. By installing BIPV system instead of the roof finishing material, the cost of construction falls ; about 19% in case of the titanium zinc plate, which is the most expensive, and about 11% in case of the color steel plate. 2. Reducing amount of the construction cost gets larger because of installing BIPV module instead of the roof finishing material, as the construction cost for roof finishing material gets higher ; therefore, it is more economical than BAPV system in terms of whole cost of construction.

Strength Properties of Mortar According to Types of Binders for Reducing Curing Process of Concrete Secondary Products for Reduction CO2 (CO2 절감을 위한 콘크리트 2차제품 양생단계저감용 결합재 종류에 따른 모르타르 강도특성)

  • Kim, Ha-Seog;Baek, Dae-Hyun;Lee, Sea-Hyun
    • Resources Recycling
    • /
    • v.23 no.4
    • /
    • pp.37-46
    • /
    • 2014
  • Carbon dioxide generated from construction materials and construction material industry among the fields of construction is approximately 67 million tons. It is about 30% of the carbon dioxide generated in the fields of construction. In order to reduce carbon dioxide in the fields of construction, it is necessary to control the use of fossil fuel consumed and decrease carbon emission by reducing the secondary and tertiary curing generating carbon dioxide in construction material industry. Therefore, this study manufactured mortar by having cement as the Plain and substituting three binding materials up to 50% and then adopted different curing methods to analyze congelation and strength characteristics. Test results for strength property by changing binding materials showed that specimens with blast furnace slag, CSA 15% and CAMC 5% resulted in positive effect for strength.

A Study on the Major Building Material and Construction Method Influencing to IAQ through Full-Scale House Construction (실물 주거 시공을 통한 실내공기질에 영향을 미치는 주요 건축자재 및 시공방법에 관한 연구)

  • Yu Hyung-Ku;Park Jin-Chul;Rhee Eon-Ku
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.18 no.3
    • /
    • pp.262-269
    • /
    • 2006
  • Formaldehyde and total volatile organic compounds (TVOC) from building materials have been known as main causes of IAQ problem in Newly-Constructed Multi-Family Houses. Because Multi-Family Houses are built in large quantities in a similar manner, inappropriate selection of building materials and method will detrimental affect IAQ. This research aims to identify major causes of Indoor Air Pollutants in Multi-Family Houses, by constructing Mock-Up & One-Room House. As a result, self leveling concrete, door, and furniture construction is a major cause of indoor formaldehyde increase, and tile bond is TVOC, and urethane water proof is Etylbenzene, and Xylene.

The Properties of Cement Paste Mixed with Carbon Nanotubes Dispersion Solution (탄소나노튜브 분산용액을 혼입한 시멘트 페이스트의 특성 변화)

  • Park, Sung-Hwan;Kim, Ji-Hyun;Chung, Chul-Woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.201-202
    • /
    • 2021
  • Currently, the domestic construction industry is trying to expand the range of building materials due to overload of growth. In particular, several studies are being conducted to make up for the weakness of building materials by solving problems such as reduction of tensile strength and brittle behavior of concrete. Among them, efforts to maximize the use of carbon nanotubes (CNT) that has excellent mechanical and electrical conductivity properties are continuing. However, CNT is hydrophobic and have a strong Van der Waals force between particles, making it difficult to obtain an effective dispersion state. Therefore, in this study, various kinds of surfactants like DOC (Sodium Deoxycholate), PVP (Polyvinylpyrrolidone), and PCE (Polycarboxylate ester) were added to improve the dispersibility of CNT, and analyzed the changes in the properties of the cement paste mixed with them.

  • PDF

Study on Mock-up Construction Example of Free-Form Building Facade using External UHPC Panels - Focused on the Construction of Busan Opera House - (UHPC 외장패널을 활용한 비정형건축물 외장패널의 목업 시공사례에 대한 연구 - 부산 오페라 하우스 신축 공사 -)

  • Kim, Tae-Ik;Yoon, Ju-Yong;Choi, Byung-Keol;Park, Yong-Kyu;Yoon, Gi-Won
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.187-188
    • /
    • 2021
  • In the case of the Busan North Port, where the Busan Opera House is located, it is an environment exposed to various external deterioration factors such as frequent strong winds, seawater and salty winds, and an exterior material using UHPC (Ultra High Performance Concrete), a highly durable exterior material as a solution to this. Has been adopted. in this study, an economical production and construction direction was reviewed by applying UHPC to the exterior panels of atypical buildings that cannot cope with GFRC, metal, and glass, which are the main exterior finishing materials applied so far. When steel fibers are used, structural performance may be better than organic fibers, but due to environmental factors in Busan, corrosion due to exposure to steel fibers or problems with safety management after construction and completion may occur. Therefore, the site used the newly developed SACF fiber. Facade design of atypical buildings, which will increase in the future, is an important part, and the scope of use of UHPC panels is expected to increase in the future as design trends and demand for high durability increase.

  • PDF

The Success Factors of Scheduling Using the TACT Technique in Wall Type Apartment House Construction (벽식(壁式) 아파트의 택트공정(工程)계획의 성공요인 분석에 관(關)한 연구(硏究))

  • Kim Joon-Ho;Kim Gwang-Hee;Cho Hyung-Keun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.6 no.1 s.19
    • /
    • pp.79-86
    • /
    • 2006
  • Recently, the construction companies show lots of interest in reducing the construction duration of apartment housing project in Korea. Therefore, the purpose of this study is to investigate the success factors of scheduling using the TACT technique in wall type apartment house construction for managing the construction schedule effectively. For appling the tact scheduling technique to wall type apartment house construction, the success factors can be summarized as follows : (1) zoning the horizontal and vortical work area properly, (2) preparing the flow chart of finishing works, (3) minimizing the undefined activity like chipping off the concrete wall, (4) reordering the construction activities for keeping up the continuity of works in winter season, (5) dividing the amount of work for minimizing the delay time of any activity, etc.

A study on contaminant reduction performance of the adsorption protector for construction surface (흡착보양재의 오염물질방출 저감성능에 관한 연구)

  • Heo, Jung-Yong;Choi, Chang-Ho;Lee, Yun-Gyu
    • Proceedings of the SAREK Conference
    • /
    • 2008.06a
    • /
    • pp.714-719
    • /
    • 2008
  • In a domestic construction field, after floor is constructed, protector for construction surface is set up to prevent the surface of the floor being scratched and polluted. However, the problem is that contaminants discharged with the removal of the protector for construction surface exert a bad influence for the indoor air quality. In the research, it tested to the contaminant reduction performance of the adsorption protector for construction surface using powder of charcoal by the alternative proposal of such protectors for construction surface

  • PDF

Technology Proposal for Curved Concrete Tracks Construction of 2018 Winter Olympic Sliding Center in Pyeongchang (평창 동계올림픽 슬라이딩센터의 곡면콘크리트 트랙 시공을 위한 기술제안)

  • Park, Young-Mi;Kim, Hye-Won;Park, Ki-Hong;Jo, Seong-Joon;Kim, Sung-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.69-70
    • /
    • 2014
  • For the curved concrete track construction of 2018 winter Olympic sliding center in Pyeongchang, in this study proposed the digital fabrication technology using CNC. This method can control the 3D geometries of the curved concrete structure based on the digital design. Conventional method generates the construction errors because this method fabricates many temporary zig bar using 1:1 full size drawing for install frozen pipes and sets up each zig bars at the construction site. Propose method is effective to ensure the precise fabrication and construction of zig bars. Also this method can eliminate errors of the frozen pipes position and curved concrete construction.

  • PDF

To Experimental Study of Alkalinity Recovery Agent application in field (알칼리회복제의 현장 적용성에 관한 실험적 연구)

  • 김광기;박선길;김우재;이영도;송병창;정상진
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2002.11a
    • /
    • pp.7-10
    • /
    • 2002
  • Concrete used up to date semipermanent architecture material but now day concrete early deterioration emboss social issue because of construction structure and environmental factor. so, many study of deterioration concrete construction improve durability used impregnation alkalization agent. In These to Study of derelop reoairmeat material in reduce carbonation. xoncrete Building use Alkalinity Recovery Agent which is Realkalinity and strength surface. Alkalinity Recovery Agent undisposed application volume and cure the concrete period. To study Alkalinity Recovery Ahent spray and cure the concrete propriery in field.

  • PDF