• 제목/요약/키워드: building remains

검색결과 194건 처리시간 0.024초

BUILDING INFORMATION MODELING (BIM)-BASED DESIGN OF ENERGY EFFICIENT BUILDINGS

  • Cho, Chung-Suk;Chen, Don;Woo, Sungkwon
    • 한국BIM학회 논문집
    • /
    • 제2권1호
    • /
    • pp.1-6
    • /
    • 2012
  • With the increased awareness of energy consumption as well as the environmental impact of building operations, architects, designers and planners are required to place more consideration on sustainability and energy performance of the building. To ensure most of those considerations are reflected in the building performance, critical design decisions should be made by key stakeholders early during the design development stage. The application of BIM during building energy simulations has profoundly improved the energy analysis process and thus this approach has gained momentum. However, despite rapid advances in BIM-based processes, the question still remains how ordinary building stakeholders can perform energy performance analysis, which has previously been conducted predominantly by professionals, to maximize energy efficient building performance. To address this issue, we identified two leading building performance analysis software programs, Energy Plus and IES (IES ), and compared their effectiveness and suitability as BIM-based energy simulation tools. To facilitate this study, we examined a case study on Building Performance Model (BPM) of a single story building with one door, multiple windows on each wall, a slab and a roof. We focused particularly on building energy performance by differing building orientation and window sizes and compared how effectively these two software programs analyzed the performance. We also looked at typical decision-making processes implementing building energy simulation program during the early design stages in the U.S. Finally, conclusions were drawn as to how to conduct BIM-based building energy performance evaluations more efficiently. Suggestions for further avenues of research are also made.

Simulation을 이용한 건물의 비상대피문제 연구 (A simulation model for emergency building evacuation)

  • 최원준
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 1990년도 춘계공동학술대회논문집; 한국과학기술원; 28 Apr. 1990
    • /
    • pp.299-311
    • /
    • 1990
  • A computer simulation model is proposed for selecting effective agrees paths and estimating the evacuation time in case of evacuating all the residents of a building to the safe area. The physical structure of a building is formulated into a network. The followings are considered in the model : the congestion effect to the velocity, the behavioral pattern of the evacuees, and the probabilistic nature of the evacuation process. Coded in SLAM II/PC, the simulation model can generate the output such as evacuation time(max, average), utilization of exits, utilization of passages, floor clearance times, and bottleneck information. The "rigorous" validation of the proposed model is not completed yet but remains to be a future research topic.rch topic.

  • PDF

분황사 중문지 출토 치미 연구 (A Study on the Chimi Excavated from the Middle Gate Remains of Bunhwangsa Temple)

  • 김숙경
    • 건축역사연구
    • /
    • 제26권5호
    • /
    • pp.19-26
    • /
    • 2017
  • This paper aimed to identify the architectural characteristics of the chimi excavated from ancient ruins, especially middle gate remains of Bunhwangsa Temple in the Unified Silla period. Middle gate had planned $3{\times}2$ with 295mm measuring unit and gabled building. Detailed study of the shape of chimi of the middle gate restored by related field experts reveals as follows. 1) Height of chimi is 4.5(130.6cm) of Tang's system of measurement classified as large one. 2) The front and back side square hole is made for transverse timber placement. 3) Position of chimi is not the end of the ridge of roof, it moved toward the center. 4) Construction method of chimi is structured with smaller beam and center column. 5) Width and height of the ridge is less than 38cm and 54cm to be approximately, Width and height of the gabled ridge is less than 38cm and 50cm. 6) This chimi is considered to be very unique when compared to existing ancient restored chimis, it is designed to be advantageous to the chimi construction.

발해건축사 연구 동향과 콕샤로프카1 성터 건물지의 성격 (Some topics on the study of Balhae architecture, including the nature of the building site excavated in Koksharovka-1 fortress)

  • 송기호
    • 건축역사연구
    • /
    • 제21권1호
    • /
    • pp.119-134
    • /
    • 2012
  • Balhae(698~926) was the ancient state which opened the Nambuk-guk period with the Unified Silla. But Balhae architecture began to included in the history of Korean architecture only about 15 years ago, such as the books written by Yun Jang-seop or Ju Nam-cheol. I discussed four issues related to Balhae architecture in this paper. First, I criticized the excavation report of 24 stones remains at Jiangdong in Duhua city, and I asserted the ondol site belonged to different period. Second, I also interpreted that the building found on the tombs no.13 and no.14, in the Longhai burial area in Helong city must be a wooden stupa. Third, Balhae played some important roles in the history of ondol. It developed Koguryeo ondol in terms of structure, gave an opportunity to the ruling class to adopt ondol for the first time, and passed the heating system down to the Jurchen, the ancestor of the modern Manchurian. Fourth, the Russian-Korean joint research team excavated seven building sites in Koksharovka 1 fortress from Russian territory these four years, and it is reasonable to assume the fortress was the center of Anbyeon-bu, one of 15 local government districts in Balhae. I guess this buildings were the royal shrine built by resisters after the fall of Balhae, and the vessel stands found there must be used for ancestral memorial ceremony inside them.

웅진천도후(熊津遷都後) 백제(百濟) 와건물(瓦建物) 적심토(積心土)의 편년(編年)과 축조기법(築造技法) 변천(變遷)에 관한 연구(硏究) (A study for Chronicle and Construction Technique of Jeoksimto (積心土) of Baekje tile-capped building after the transfer of the capital to Wungjin)

  • 조원창
    • 건축역사연구
    • /
    • 제16권3호
    • /
    • pp.57-74
    • /
    • 2007
  • Jeoksimto which was build up as the reinforcement establishment made with the soil under the cornerstone in the site of tile-capped building is the representative construction technique which become popular in the Sabi capital era after the Wungjin capital era. Especially from the fact that no site of tile-capped building with this Jeoksimto has been found in the Silla area, we can see the originality Baekje technique. We can analogize the specialization of Josagong (造寺工) (craftsman building the temple) and the diversity of technique, on the basis of the technique raising the ground level which is different with the middle gate site of Neung-sa and the Hall enshrining Buddha site in Buyeo. Moreover, we can have the confidence the dispatch of craftsman and the transmission of building technique from the Buyeo area to the Iksan area through the fact that the construction techniques of Jeoksimto in both area are almost the same. However the concerns in the construction archaeology are necessary because almost no study for Jeoksimto has been conducted and the term of Jeoksimto also is unfamiliar even if excavation of Baekje Jeoksimto in the several remains.

  • PDF

REQUIREMENTS FOR AUTOMATED CODE CHECKING FOR FIRE RESISTANCE AND EGRESS RULE USING BIM

  • Jiyong Jeong;Ghang Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.316-322
    • /
    • 2009
  • The more repetitive, complex and objective the work, the more effective automation is. Code checking is an example of this. Checking building codes through a thick set of drawings is error-prone and time-consuming. In order to overcome this problem, several organizations have initiated efforts to automate building-code checking. Initiated study mainly focused on checking codes for invalidation, required size and crash, and then area of checkable codes have been expanding. But, it has not been considered for codes regarding anti-disaster/egress, which is also issued these days. This study is about how to automatically check codes for anti-disaster and egress based on Korea building codes. The codes can be categorized as five sections: egress way, material/capability, principals of evacuation, evacuation stairway and fire protection partition. To check automatically, there are problems, such as expression of codes for egress and limitation of extractable information from the BIM model. This paper shows what problems exist and assignments to be resolved. Also, current developing processes are presented, and suggestions are made about the direction for the work that remains.

  • PDF

Ontology-based Safety Risk Interactions Analysis for Supporting Pre-task Planning

  • Tran, Si Van-Tien;Lee, Doyeop;Pham, Trang Kieu;Khan, Numan;Park, Chansik
    • 국제학술발표논문집
    • /
    • The 8th International Conference on Construction Engineering and Project Management
    • /
    • pp.96-102
    • /
    • 2020
  • The construction industry remains serious accidents, injuries, and fatalities due to it's unique, dynamic, and temporary nature. On workplace sites, Safety pre-task planning is one of the efforts to minimize injuries and help construction personnel to identify potential hazards. However, the working conditions are complicated. Many activities, including tasks or job steps, are executing at the same time and place. It may lead to an increase in the risks from simultaneous tasks. This paper contributes to addressing this issue by introducing a safety risk interaction analyzing framework. To accomplish this objective, accident reports of the Occupational Safety and Health Administration (OSHA) are investigated. The pairs of task incompatibility, which have time-space conflicts and lead to incidents, are found. Ontology technology is applied to build the risk database, in which the information is acquired, structuralized. The proposed system is expected to improve pre-task planning efficiency and relieve the burdens encountered by safety managers. A user scenario is also discussed to demonstrate how the ontology supports pre-task planning in practice.

  • PDF

황룡사 서금당 전축기단 연구 (A Study on the Brick-constructed Platform of the West hall in Hwangnyongsa temple site)

  • 김숙경
    • 건축역사연구
    • /
    • 제24권4호
    • /
    • pp.55-64
    • /
    • 2015
  • This paper aimed to identify architectural historical meaning of the brick-constructed platform of the west hall in Hwangnyoungsa buddhist temple site based on studying published the excavation survey report and comparing with other platforms of Silla remains. Mass and height of the building has a hierarchical structure within a buddhist temple site, this is applicable in Hwangnyongsa. So in case of a rank equal to or lower buildings than the west hall, those of platforms were built of brick-constructed. As stone relics, jidaeseoks are very narrow, I think that wooden pagoda and main hall's platform were built of brick in first construction period. West hall's platform was built at the late 6th~the mid of 7th century, these brick-remains were considered as a quite earlier construction period relics. Because in west hall there is no jidaeseok under bricks, and all bricks relics have a rectangular shape.

A Comparative Analysis of Artificial Neural Network (ANN) Architectures for Box Compression Strength Estimation

  • By Juan Gu;Benjamin Frank;Euihark Lee
    • 한국포장학회지
    • /
    • 제29권3호
    • /
    • pp.163-174
    • /
    • 2023
  • Though box compression strength (BCS) is commonly used as a performance criterion for shipping containers, estimating BCS remains a challenge. In this study, artificial neural networks (ANN) are implemented as a new tool, with a focus on building up ANN architectures for BCS estimation. An Artificial Neural Network (ANN) model can be constructed by adjusting four modeling factors: hidden neuron numbers, epochs, number of modeling cycles, and number of data points. The four factors interact with each other to influence model accuracy and can be optimized by minimizing model's Mean Squared Error (MSE). Using both data from the literature and "synthetic" data based on the McKee equation, we find that model estimation accuracy remains limited due to the uncertainty in both the input parameters and the ANN process itself. The population size to build an ANN model has been identified based on different data sets. This study provides a methodology guide for future research exploring the applicability of ANN to address problems and answer questions in the corrugated industry.

Investigation of effects of twin excavations effects on stability of a 20-storey building in sand: 3D finite element approach

  • Hemu Karira;Dildar Ali Mangnejo;Aneel Kumar;Tauha Hussain Ali;Syed Naveed Raza Shah
    • Geomechanics and Engineering
    • /
    • 제32권4호
    • /
    • pp.427-443
    • /
    • 2023
  • Across the globe, rapid urbanization demands the construction of basements for car parking and sub way station within the vicinity of high-rise buildings supported on piled raft foundations. As a consequence, ground movements caused by such excavations could interfere with the serviceability of the building and the piled raft as well. Hence, the prediction of the building responses to the adjacent excavations is of utmost importance. This study used three-dimensional numerical modelling to capture the effects of twin excavations (final depth of each excavation, He=24 m) on a 20-storey building resting on (4×4) piled raft. Because the considered structure, pile foundation, and soil deposit are three-dimensional in nature, the adopted three-dimensional numerical modelling can provide a more realistic simulation to capture responses of the system. The hypoplastic constitutive model was used to capture soil behaviour. The concrete damaged plasticity (CDP) model was used to capture the cracking behaviour in the concrete beams, columns and piles. The computed results revealed that the first excavation- induced substantial differential settlement (i.e., tilting) in the adjacent high-rise building while second excavation caused the building tilt back with smaller rate. As a result, the building remains tilted towards the first excavation with final value of tilting of 0.28%. Consequently, the most severe tensile cracking damage at the bottom of two middle columns. At the end of twin excavations, the building load resisted by the raft reduced to half of that the load before the excavations. The reduced load transferred to the piles resulting in increment of the axial load along the entire length of piles.