Reducing Earthquake Fatalities and Destructions in Iran: A Project Management Perception

  • Tabassi, Amin Akhavan;Bakar, Abu Hassan Abu;Yusof, Nor'Aini
    • Asian Journal of Business Environment
    • /
    • v.4 no.1
    • /
    • pp.25-35
    • /
    • 2014
  • Purpose - Appropriate project management knowledge as well as its effective application in the construction industry increase construction quality and, therefore, reduce fatalities and destruction. Research design, data, and methodology - This study was conducted through a comparative analysis of earthquake fatalities in Iran, Turkey, Pakistan, Indonesia, China, Haiti, Japan, and the United States of America. The data was analyzed using a frequency study. The analysis contrasts the fatalities of some of the strongest earthquakes around the world between 1960 and 2010. Results - Poor quality construction practices and a lack of effective application of project management knowledge play a major role in the vast destruction, high death toll, and dismal tragedies that are associated with earthquakes, especially in Iran. Conclusions - Despite the history of tragic earthquakes and their continuing recurrence, this study attempts to make governments, companies, and disaster management personnel aware of the dangers of poor quality construction and the deficient application of project management knowledge and, further, accentuates effective ways to prevent the probability of serious damage in future. This study contains valuable information on the effects of project management application towards reducing earthquake fatalities and destruction.

BIM Application for Civil Engineering Project in Planning and Design Phases (토목공사 기획 및 설계단계의 BIM 적용방안 연구)

  • Kang, Leen-Seok;Kim, Seol-Gi;Kim, Hyeon-Seung;Moon, Hyoun-Seok
    • Journal of KIBIM
    • /
    • v.1 no.1
    • /
    • pp.26-31
    • /
    • 2011
  • Due to the characteristics of 3D objects of building construction projects which have regular, vertical and repetitive shapes, the most practical utilization of BIM in the country is focused on building projects. The characteristics of 3D objects of civil engineering project have irregular, horizontal and non-repetitive shapes. Therefore, consisting of a practical BIM model is difficult comparing with building project. This study suggests an application process of BIM for the planning and design phases for civil engineering project. A BIM system is developed based on suggested BIM process and it is verified through a bridge construction project.

INCIDENT FREQUENCY AND SEVERITY FOR CONSTRUCTION FACILITIES

  • Jong-Hyun Park;Jae-Su Jeong;Chan-Sik Lee
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.234-240
    • /
    • 2011
  • Preventing incidents occurred in construction process is important for safe implementation of construction projects. Due to the complexity and magnitude of the project and moreover, poor safe planning and management, construction incidents in Korea have been increasing. Reducing construction incidents effectively, appropriate safety management program in consideration of the incident rate of each facility is to be adapted. This study analyzes incident frequency and severity rate of each facility based on the data of construction sites(about 1,560 thousand cases) recorded by Korea Occupational Safety & Health Agency for 3 years from 2007 to 2009, and the incident related data (about 40 thousand cases) of Korea Workers' Compensation & Welfare Service. The results of this study revealed that construction incident rates of 'cold refrigeration storage facilities' are the highest among building types, followed by traditional building religious building, arcade department store and shopping center. In case of other facilities, the incident rate and the rate of intensity of 'pipelining project' are the highest, followed by 'tunneling project'. These results would be used in providing safety programs beneficial for preventing construction incidents.

  • PDF

Assessment of Public Engagement Approach in Various Project Stages: The Case Study of Central Market, Hong Kong

  • Wong, Crystal;Chan, Icy;Lam, Lily;Zayed, Tarek;Sun, Yi
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.267-277
    • /
    • 2020
  • The present research evaluates the public engagement approach in various project stages. Hong Kong had long been criticized as top-down and executive-led jurisdiction by overlooking the importance of cultural heritage and public concerns on public projects. It was suggested to the government to engage public and provide sufficient public consultation. Thereby, the government announced a series of revitalization and conversion measures in Policy Address in 2008. To carry out the measures, there were voices, because of diverse and sometimes conflicting interests, over the effect of revitalization project. On the other hand, studies reveal that there are benefits of revitalization and enhancement of public engagement approach. In pursuit of the subject, the present research aims at studying the Central Market as a case study pilot project. In October 2009, the Policy Address announced that the Central Market be revitalized. Tasked to implement the project, Urban Renewal Authority (URA) continued to adopt the people-oriented approach as the guiding principle in its core business and in heritage preservation and revitalization so as to create a sustainable development. Between government and the public, URA acts as a bridge for communication. As between URA and the public, URA conducted public consultation, set up an ad-hoc committee in January 2016 to be in charge of the project and will continuously inform the government and public with the updates and project progress. The main objectives of the present research are to assess the advantages and challenges in different stages of public engagement approach, to evaluate the engagement system, to give a comprehensive view for participation of stakeholders, and to find out effective strategies to enhance civil engagement. Research was achieved through interviews to key persons in the project, questionnaire that was distributed to community and experts in the field. Case Study of the Central Market was studied and investigated using different sources, such as newspapers, journals, etc, to evaluate the degree of public engagement in the project. Both detailed qualitative methodological approaches of interview, questionnaire, and case study, act as a synergy to demonstrate the research objectives and provide the comprehensive perceptions on the revitalization project. The results show that public participants in revitalized project have generated considerable value enhancements to social-cultural, environmental, political and economic aspect. This study provides valuable insights that the public participation can make positive contribution to sustainability in the city. The findings indicate that no any single system is flawless therefore seeking both public opinions and professional advices are also important as a comprehensive approach to achieve higher sustainability of the building.

  • PDF

Proposal and Evaluation of the Safety Inspection Cost Estimation Model for Multi-building Construction Project (군집시설물 건설공사의 안전점검 대가 산정모델 제안 및 평가)

  • Kim, Jin-Won;Bang, Jong-Dae;Sohn, Jeong-Rak
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.33 no.12
    • /
    • pp.11-18
    • /
    • 2017
  • The safety inspection cost of the construction work was based on commercial facilities classified as a single building. Therefore, it is not possible to fully reflect the characteristics of the multi-building construction project such as apartment houses. Therefore, this study suggests a reasonable estimation model that can fully reflect the characteristics of the multi-building construction project. The safety inspection cost estimation model proposed two models such as construction cost ratio method and cost plus fixed fee method. And these models were simulated by the apartment construction work and compared with the current standard. As a result, the current construction cost ratio method has shown that the safety inspection cost tends to be overestimated as the construction size increases. Therefore, the proposed model has reflected characteristics of the multi-building construction project, so that it can reasonably estimate the safety inspection cost more than the current standard.

IMPACT OF CONSTRUCTION MATERIAL COST VARIATION ON THE ON THE FEASIBILITY OF BUILDING PROJECTS IN DEVELOPING COUNTRIES: A CASE STUDY IN VIETNAM RISK

  • Soo-Yong Kim;Luu Truong Van;Byeong-Gi Yoo;Luong Thanh Dung
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.96-105
    • /
    • 2007
  • This paper presents a study on the impact of variation of construction material prices on the feasibility of building projects in Vietnam. The paper makes use of Monte-Carlo simulation for financial risk analysis of net present Value (NPV) and internal rate of return (IRR). To well illustrate the influencing, a case study is presented. The research results show that there is a strong correlation between steel prices, gold prices, and $US exchange rate. Outputs of statistics also reveal that the concurrent variation of prices of cement, steel, sand, brick, formwork and stone has strongly negative impact on NPV and IRR of building projects. The results also indicate that the proportion of steel cost to total construction cost is 17.95% which is the cause of risks for the feasibility of building project in Vietnam. The paper stresses that feasibility study of building project must integrate the impact of construction materials prices in order to mitigate risks in developing countries as Vietnam.

  • PDF

Development of Project Delivery System for Modular Building in Korea

  • Nam, Sung-hoon;Kim, Kyung-rai;Lee, Dong-gun;Heo, So-young
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.704-705
    • /
    • 2015
  • Recent research has been ongoing for modular buildings in the country, and interest increases. However, in accordance with legal restrictions in the country with regard to Project Delivery system of Modular Building, the activation of modular buildings industry is obstructed. In Korea, in accordance with national contract law, the construction contract is apply to the project delivery system of modular buildings, and in accordance with Framework Act on the Construction Industry, The project delivery system of modular buildings has to be a separate order. The definition of separate order in contract as defined in the law is that the electric work and Communication work and digestion facility work has to be separate each contract in order to be ensured professionalism. In accordance with law, the project delivery system of modular buildings is that the contract for construction is concluded with the Owner and the Construction Contractor and the contract for goods is concluded with the construction Contractor and modular manufacturer. Due to these project delivery system, the domestic factory production rate when making a modular unit is significantly reduced compared to the rate of factory production abroad and the domestic factory production rate is estimated to 10-20%. Due to the factory production rate is also low, despite what can be done at the factory the workload in construction field increases. According to the workload in field increases, the effect of the schedule reduction can be reduced. It resolved to form a consortium with a modular manufacturer and construction companies or the contract is concluded with Owner, modular manufacturer and construction companies in each. In this paper, we propose a specific project delivery system for modular building to solve the problem of the low factory production rate and the problem of schedule reduction. Through this paper, due to the variety of project delivery system on modular buildings is expected to contribute to the activation of modular buildings.

  • PDF

An Establishment the Work Breakdown Structure for Owners in the Multi-Complex Project (입체·복합 프로젝트에서 발주자 중심의 WBS 구축방향)

  • Ko, Dae-Jun;Choi, Eun-A;Seo, Young-Chil;Lee, Sang-Beom
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.05a
    • /
    • pp.127-131
    • /
    • 2008
  • The successful project management is based on definition of project goals in construction industry. The WBS(Work Breakdown Structure) is one of the major factors which defines works related to project goals. The necessity of the WBS for owners in multi complex projects which would help them to understand the whole project is rising because the multi-complex project in the construction industry has increasing recently. Therefore, this study suggests directions to establish the WBS for owners through investigating a concept of the multi-complex project first and analyzing types of project, domestic and foreign WBS, and case studies.

  • PDF

Assessment of BIM-Based Government Funded Projects at the Design Phase (BIM 적용 공공 프로젝트 설계단계의 평가 방안에 관한 연구)

  • Shin, Seung-Hyup;Ham, Nam-Hyuk;Kim, Jea-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.213-216
    • /
    • 2010
  • Nowadays BIM(Building Information System) is applied to the public construction delivery system. BIM can help communications between project applicants through the extraction of the exact and prompt information. It also increases the efficiency of planning, construction, economic feasibility and maintenance in the whole project. Due to increasing demands of BIM, project evaluation and its process on the final deliverables have been in major interests. Thus, through the analysis of the current BIM project, characteristics, types and applications have been researched. We have discussed completeness, relationship and planning of BIM data, which are the standards of evaluation.

  • PDF

Scenario Planning and Risk Failure Mode Effect and Analysis (RFMEA) based Management

  • Paul, Virendra Kumar;Basu, Chaitali
    • Journal of Construction Engineering and Project Management
    • /
    • v.6 no.2
    • /
    • pp.24-29
    • /
    • 2016
  • This paper elaborates the significance of scenario planning in risk management, and presents an integrated approach which takes into account the 'Risk Events' derived from scenario planning for risk prioritisation. This research integrates scenario planning with Risk Failure Mode and Effect Analysis (RFMEA) through examples from construction litigations of project schedule and cost overrun cases as a simplified approach to project risk management. The proposed methodology incorporates scenarios developed from realistic events of dispute and arbitration cases from construction projects, and thereby increasing potential to foresee risks and their effects well in advance. The results from this methodology shall be validated against outcome of survey study conducted by KPMG-PMI (2013) on project schedule and cost overruns that was based on Ministry of Statistics and Programme Implementation (MoSPI) Project Monitoring data for 2012-13.