• Title/Summary/Keyword: building connection

Search Result 695, Processing Time 0.029 seconds

Power conversion control for zero emission buildings (탄소제로 빌딩을 위한 전력변환 제어)

  • Han, Seok-Woo
    • Proceedings of the KIPE Conference
    • /
    • 2011.07a
    • /
    • pp.504-505
    • /
    • 2011
  • Decreasing actual greenhouse gas will be difficult if it is not solved addressed in architectural fields. Zero emission building or zero energy building, maximize the efficiency of energy, which means the building can operate by their own renewable energy facility without any other supplying. To be a zero emission building, a building needs realization of high efficiency low energy consumption, construction of building its own energy production facilities and lastly a power grid connection. According to increasing of DC load about TV, LED lighting, computer, IT in building for living and business, it is expected the save of energy when the system of AC power distribution change into the system of DC power distribution. Renewable energy exists a big different rate produced by outside environment. When electrical power overproduce, it can supply for system. Otherwise, if electrical power produce less, it can receive supply from system. Send and receive power can lead to zero to annual standard. This paper shows the simulation about efficient control of power conversion which is related to DC power distribution of architecture and DC output of renewable energy by using L-type converter.

  • PDF

Design and Implementation of Vocal Interface-Inventory Management System (음성 인터페이스 기반의 재고 관리 시스템의 설계 및 구현)

  • Park Se Jin;Kwon Chul Hong
    • Proceedings of the KSPS conference
    • /
    • 2002.11a
    • /
    • pp.119-122
    • /
    • 2002
  • This paper focuses on building up a database of commercial stocks using XML syntax and looks into a way of building up a system with the combination of XML and XSLT that provides connectivity to client-server databases through vocal means. The use of XSLT has several advantages. Most importantly, it can transform a type of data into different formats. A vocal interface minimizes some space and time limits imposed on users outside premises when they need an instant connection to their database. In this fashion, the users can check information on stock lists without being pressurized by certain limits. PC, PDAs and cellular phones are some examples of mobile connection. The use of VoiceXML creates vocal applications. In VoiceXML servies, users can gain immediate access to data upon the input of their voices and the DTMF signals of the telephone.

  • PDF

A Study of Applications of DSM in tunnelling to an underground shopping-area (도심지 지하상가 연결통로 DSM(Divided Shield Method)공법 적용사례 연구)

  • Hong, Chang-Soo;Hwang, Dae-Jin;Lee, Kang-Ho;Cho, Keum-Sik
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.10a
    • /
    • pp.556-563
    • /
    • 2005
  • Recently, it is used to join an building to an underground shopping-area in urban. When we construct Seo-Cho Complex building which is in Seoul, we also construct an underground passage to the Gangnam underground shopping-area. But it is difficult to excavate in the downtown area, because excavations induce traffic jam and public discontent. Considering safety, a confined area, settlements, we decided to use DSM(Divided Shield Method) which is based on messer shield. This paper will produce our experience and the results provide a useful guide in a connection tunnel

  • PDF

Requirement analysis for Development of the Bolt-type Rebar Coupler (볼트 접합형 철근 이음장치 개발을 위한 요구조건 분석)

  • Lim, Chae-Yeon;Joo, Jin-Kyu;Lee, Goon-Jae;Kim, Sun-Kuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.169-170
    • /
    • 2011
  • In the connection of green frame, the bottom rebar of the precast concrete beam needs joint or anchorage to ensure structural integrity. However, given the characteristics of composite precast concrete joint, enough length over which rebar can be anchored or lap-spliced is not secured. In addition, due to issues with constructability, cost or quality, it is difficult to apply welding or mechanical connection techniques. Therefore, this study analyze the requirement for a bolt-type rebar coupler as a solution for the coupling issue between the lower rebars of green frame beam. The requirement for bolt-type rebar coupler proposed herein will provide basic data for development studies of the rebar coupler.

  • PDF

A basic study of reinforcement tools development for Productivity Improvement of Composite PC connection work (합성 PC 구조 접합부공사의 생산성 향상을 위한 철근배근 도구 개발 기초연구)

  • Kim, Geun-Ho;Lim, Chae-yeon;Na, Young-Joo;Kim, Sun-Kuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.339-340
    • /
    • 2012
  • Green frame is combined by structural steel and reinforcements of Green column and beam and unified by cast-in-place concrete. However, when upper reinforcements penetrate structural steel hole, the execution is difficult due to interference of joint and a rib of deformed reinforcements. Therefore, the objective of this study is to propose the reinforcement tools to improve productivity of precast structure connection construction. The reinforcement tools proposed in this study can be helpful to improve constructability, safety, duration, and cost comparing with conventional reinforcement method since unskilled workers can deal with reinforcements easily.

  • PDF

Connection Apparatus using Coupling Device and Linking Method for Reinforcing Bar (철근연결구를 이용한 철근이음장치(LK-DK) 개발에 관한 연구)

  • Woo, Jong-Yeol;Hong, Seong-Wook;Park, Seung-Hwan;Ann, Tae-Han;Choe, Min-Kwon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.175-176
    • /
    • 2012
  • In this study, coupler on the safety of meeting the requirements and construction and economy to satisfy the number of parts to minimize an LK-DK coupler has been developed, affordability existing reinforcing bar joint, welded joint, mechanical joints, compared with a favorable one to the understanding, and also facilitate the construction and logistics, etc. I've found that there is no additional pay because the amount of product performance through the tensile test after test, if commercialization is expected to be greater ramifications.

  • PDF

The basic study of the detail development of the Wall-type APT joint using Slip Form and Deck plate. (Slip Form과 Deck Plate를 채용한 벽식 APT의 접합부 Detail개발의 기초적 연구)

  • Lee, Hee-Doo;Park, Shin;Lim, Nam-Gi
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2003.05a
    • /
    • pp.127-132
    • /
    • 2003
  • The purpose of current study is about how to construct wall-type APT in slip form and Deck plate applied different connection of materials that wall and slab. A proposal construct's solution is using the continuous a binding string that the main of contents are slab or stairs which horizon structure part construction is joined the vertical structure part, new we Proposed of 2 solution that new technology development. We'll suggest that the development is in the construct of higher stories APT more better other construction method. We expect that the new method is good but we have many things to solute themes. Thus, we decided that this development contents are needed that correct structural investigation and constructor's security of speciality and through a fact construct, correct verification.

  • PDF

Analysis on the Factor of Revision of Pipe Laying Down Material and Connection Work Material (표준품셈 관부설 및 접합공사 품 개정 요인 분석)

  • Oh, Jae-Hoon;An, Bang-Yul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.302-303
    • /
    • 2018
  • This study analyzed the major revision factors and revision contents for 'Construction-Standard-Production-Rate for Construction Works in 2018. Part 16. Pipe Laying Down and Connection" which was revised by the construction expense estimation standard's middle and long-term plans. The main reasons for the revision was analyzed to be unclear construction scope, limitations in applicable pipe material based on the facility type, labor force mainly composed of ordinary workers, limitations of labor force, and incomplete appropriation standard for the tool rent fee and equipment expenses. Through revision of factors, common items were newly established, organization was revised, the labor force was mainly composed of the technicians, and basis for appropriation of equipment expenses was arranged. In addition, through periodic revision, the appropriation standard for bend and special pipes was set. Consequently, more practical construction cost estimate standard is arranged through revision.

  • PDF

Optimum Design of Dye-Sensitized Solar Module for Building-Integrated Photovoltaic Systems

  • Lee, Kyu-Seok;Kang, Man Gu
    • ETRI Journal
    • /
    • v.39 no.6
    • /
    • pp.859-865
    • /
    • 2017
  • This paper presents a method for determining the optimum active-area width (OAW) of solar cells in a module architecture. The current density-voltage curve of a reference cell with a narrow active-area width is used to reproduce the current density profile in the test cell whose active area width is to be optimized. We obtained self-consistent current density and electric potential profiles from iterative calculations of both properties, considering the distributed resistance of the contact layers. Further, we determined the OAW that yields the maximum efficiency by calculating efficiency as a function of the active-area width. The proposed method can be applied to the design of the active area of a dye-sensitized solar cell in Z-type series connection modules for indoor and building-integrated photovoltaic systems. Our calculations predicted that OAW increases as the sheet resistances of the contact layers and the intensity of light decrease.

A Basic Study of the Calculation Model for Shear Connectors of Composite Precast Concrete Beams (합성 PC 보를 위한 전단 보강 계산 모형 기초 연구)

  • Lim, Chaeyeon;Lee, Dong Hoon;Kim, Sun Kuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.19-20
    • /
    • 2013
  • Green Frame is a column-beam system constructed by composite precast column and beam connected by embedded steel of their. From when the precast concrete beam of Green Frame is installed, until the concrete of slab and connection joint is cured, the self load of beam shall be supported by the embedded steel of it. Therefore, the concrete of beam could be separated from the embedded steel if the shear connector of beam of Green Frame is designed by the code on Structural standard. So, this study suggest an equation for the shear connection of composite precast concrete beams of Green Frame. The result of this study will be used as the main equation of the calculation model for shear connectors of composite precast concrete beams.

  • PDF