• Title/Summary/Keyword: building area

Search Result 3,899, Processing Time 0.036 seconds

Case Study on the Building Organization of Medibio Research Laboratory Facilities in Research-driven Hospital (연구중심병원 의생명연구원의 실험실 구성 사례 조사)

  • Kim, Young-Aee
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.34 no.11
    • /
    • pp.95-104
    • /
    • 2018
  • Healthcare technology has been growing and fostering cooperation between industry, university and hospitals as growth engines in korea. So, the medibio research institutes in hospital have been constructed to promote research and industrialization centering on healthcare technology. The purpose of this study is to investigate the cases of research institutes in hospitals, and search the characteristics of building organization of medibio research laboratory facilities. Case study is investigated by floor plan, homepage and site visits about five research institutes selected in research-driven hospitals. The facility title and size of research laboratory is originated from site area and research building location. The building function include not only the research lab and business office reflecting on the development platform, and but assembly and meeting room in the ground level. Laboratory floor plans have three types, rectangular, rectangular+linear and linear type, one is traditional and efficient, the others are people and friendly. And building core types are correlated with lab space unit modules, single and double side core are shown in rectangular type. All the laboratories are open lab, composed with laboratory bench and research note writing desk facing the lab service and enclosed lab-support area. And they have communication space looking as warm and cozy common area for the innovation, convergence and collaboration. As the high risk of contamination and high standard for safety and security, equipment and facilities are well managed with biological environment including BSC, fume hood, PCR classification, eye washing and emergency shower.

Spatial Scheduling in Shipbuilding Industry

  • Duck Young Yoon;Varghese Ranjan;Koo Chung Kon
    • Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
    • /
    • 2004.05a
    • /
    • pp.106-110
    • /
    • 2004
  • In any large heavy industry like that of ship building, there exist a lot of complications for the arrangement of building blocks optimally for the minimal space consumption. The major problem arises at yard because of laxity in space for arranging the building blocks of ship under construction. A standardized erection sequence diagram is generally available to provide the prioritised erection sequence. This erection sequence diagram serves as the frame work. In order to make a timely erection of the blocks a post plan has to be developed so that the blocks lie in the nearest possible vicinity of the material handling devices while keeping the priority of erection. Therefore, the blocks are arranged in the pre-erection area. This kind of readiness of blocks leads to a very complex problem of space. This arises due to the least available space leading to an urgent need of an availability of intelligent spatial schedule without compromising the rate of production. There exists two critical problems ahead namely, the spatial occupation layout of pre-erection area and the emptying pattern in the spatial vicinity. The block shape is assumed be rectangular. The related input data's are the dates of erection (earliest as well as the latest), geometrical parameters of block available on pre-erection area, slack time and the like.

  • PDF

A Study on the Classification of Physical Decline in Small and Medium Cities - Focused on the analysis of building DB in the unit of Census Output Area - (중소도시의 물리적 쇠퇴등급 분류 연구 - 집계구 단위의 건축물 DB 분석을 중심으로 -)

  • Han, Da-Hyuck;Lee, Min-Seok
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.22 no.3
    • /
    • pp.41-48
    • /
    • 2020
  • The purpose of this research is to manage the physical sectors systematically, needed for the selection and direction of declining areas, such as urban regeneration and revitalization projects, by grading the density of decline indicators of buildings in small and medium cities. In five small and medium-sized cities in Jeollanam-do, the data were divided into three stages according to the density, according to the use, structure, and age of the building. Rating by element of Census Output Area, detailed designation, and management of declining areas in small and medium-sized cities are required, rather than setting the scope of declining areas based on administrative districts. It is also necessary to manage cities through complex and intra-element phasing rather than single elements in defining physical decline. The analysis based on the complex factors and boundary of the Census Output Area is meaningful in order to maintain and manage such cities in a more detailed and precise manner according to such characteristics of each region.

A Study on the Characteristics of House Arrangement of Unified Silla Period - Focused on the Capital Remains of Silla in Gyeongju - (통일신라시대 주택의 배치특성 - 경주 신라왕경 발굴유구를 중심으로 -)

  • Han, Ji-Man;Lee, Jeong-Mee
    • Journal of the Korean housing association
    • /
    • v.27 no.3
    • /
    • pp.23-30
    • /
    • 2016
  • Among the unearthed House ruins in Gyeongju of the capital of Silla period, the ruins to see the overall appearance of building arrangement is the ruins of Silla capital S1E1 area, Inwangdong 412, and the Jaemaejeong. In this study, the characteristics of urban house arrangement of the Unified Silla period was analyzed that, through a review of the arrangement relationship between the gate and the individual buildings found in these ruins. The urban house of the Unified Silla period was surrounded with wall, and the way to distinguish between functional areas within it are shown differently, depending on the size of the house. In other words, the small house was divided each area by installation of inner fence, and the large house was by arranging attached buildings. Thai is, the central area is not divided by inner fence is the Characteristics that is different from the small house. And in all houses, a large courtyard is located in the front of main building. Conatruction of the courtyard determines the location and direction of the main building. And the each area has external space of courtyard in the center.

Study on the Classification of the Mixed-Use Development in terms of the Use and Function in Foreign Countries (해외 도심복합시설의 용도 및 기능에 따른 유형분류)

  • Lee, Ha-Shik;Jung, Bo-Ra;Choi, Young-O;Chae, Chang-U;Lee, Kang-Hee
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2008.04a
    • /
    • pp.245-250
    • /
    • 2008
  • The city means not only a geographical area as a role of the spatial boundary, but also a socio-economic place to communicate with each part. It requires various functions to get the income and activities. But city has a limitation of a available land to provide the required function and a sufficient space to supply the activity. Therefore, the development trend of city has not been to spread to the horizontal area any more and considered the vertical area. In addition, various functions put into a massive building because many people want to solve the daily requirements without spending time and cost. In this paper, it aimed at classifying the mixed-use building into function, circulation, relation between the public and private space and the building shape to provide the design information according to the development constraints such as land area, functional limitation, accessibility, etc. The classification of the mixed-use buildings is divided into four areas. The data are collected with foreign countries in Japan, Europe and US.

  • PDF

A Study on Architecture and Structure of Landscape Building in Remote Mountain Village - Focused on Southwestern Black Forest Area, Germany - (유럽 산간마을의 건축과 경관형성실태에 관한 연구 - 독일의 남서부지역 블랙 포레스트를 중심으로 -)

  • Chong, Geon-Chai
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.21 no.3
    • /
    • pp.41-48
    • /
    • 2019
  • The purpose of this study is to understand whether the architecture of the mountain village conforms to the geography and local landscape, and become a unique scenic element. Also, the study is to grasp the status of the village landscape design elements. The methods and contents of the study were surveyed by field research with references in Biederbach community, an isolated mountain village in Southwestern Germany. The time frame for the survey research is July 2015. The contents of the study include the analysis of the village's landscape structure, architecture, and landscape design patterns. The following conclusions were reached through the above research process. First, the village landscape structure seen in the mid-distance view is the hilly scene of the alpine region, which houses the sloping terrain of Black Forest and surrounds the residential area with the grassland covered by the Black Forest. Second, the main elements of the town's landscape building are historical culture, traditional architecture, topology and nature, and artificial environmental design. Third, the landscape design utilizing the village's resources creates a sustainable community's residential environment.

A Study on the Kind of Space and the Composition of Area in Elementary School - In Priority on Analyzing the Plan of Each School - (초등학교의 공간종류 및 면적구성에 관한 연구 - 각 학교의 평면분석을 중심으로 -)

  • Rieu, Ho-Seoup
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.4 no.4
    • /
    • pp.5-15
    • /
    • 1997
  • The purpose of this study is to analyze the plan type of school building, the present situation of the kind of room, and of the area composition, -the whole area of school building, the area per class, the area for each person, and the rate of the area composition by room- and the latest tendency with the utilization of the plans of 43 elementary schools and to offer the fundamental data on planning elementary school hereafter. The content of this study can be summarized and arranged as follows: 1. In contrast to the past the schools which is recently constructing intend to improve the spacial type and the level of area. 2. Specially, the location and the area of special classrooms, and teacher's spases is to be improved urgently in almost elementary schools. 3. Because even in the school with same number of classrooms, it is proved that there is the difference of the area by space in accordance with the type of plane, hereafter it is requested to investigate the efficient plane design. 4. Hereafter, it is urgently required to comprehend the practical application of these schools and to research for the space of the school which is compatible with the field of school on the fonduation of the requirement of users.

  • PDF

Post-processing Method of Point Cloud Extracted Based on Image Matching for Unmanned Aerial Vehicle Image (무인항공기 영상을 위한 영상 매칭 기반 생성 포인트 클라우드의 후처리 방안 연구)

  • Rhee, Sooahm;Kim, Han-gyeol;Kim, Taejung
    • Korean Journal of Remote Sensing
    • /
    • v.38 no.6_1
    • /
    • pp.1025-1034
    • /
    • 2022
  • In this paper, we propose a post-processing method through interpolation of hole regions that occur when extracting point clouds. When image matching is performed on stereo image data, holes occur due to occlusion and building façade area. This area may become an obstacle to the creation of additional products based on the point cloud in the future, so an effective processing technique is required. First, an initial point cloud is extracted based on the disparity map generated by applying stereo image matching. We transform the point cloud into a grid. Then a hole area is extracted due to occlusion and building façade area. By repeating the process of creating Triangulated Irregular Network (TIN) triangle in the hall area and processing the inner value of the triangle as the minimum height value of the area, it is possible to perform interpolation without awkwardness between the building and the ground surface around the building. A new point cloud is created by adding the location information corresponding to the interpolated area from the grid data as a point. To minimize the addition of unnecessary points during the interpolation process, the interpolated data to an area outside the initial point cloud area was not processed. The RGB brightness value applied to the interpolated point cloud was processed by setting the image with the closest pixel distance to the shooting center among the stereo images used for matching. It was confirmed that the shielded area generated after generating the point cloud of the target area was effectively processed through the proposed technique.

Urban Area Building Reconstruction Using High Resolution SAR Image (고해상도 SAR 영상을 이용한 도심지 건물 재구성)

  • Kang, Ah-Reum;Lee, Seung-Kuk;Kim, Sang-Wan
    • Korean Journal of Remote Sensing
    • /
    • v.29 no.4
    • /
    • pp.361-373
    • /
    • 2013
  • The monitoring of urban area, target detection and building reconstruction have been actively studied and investigated since high resolution X-band SAR images could be acquired by airborne and/or satellite SAR systems. This paper describes an efficient approach to reconstruct artificial structures (e.g. apartment, building and house) in urban area using high resolution X-band SAR images. Building footprint was first extracted from 1:25,000 digital topographic map and then a corner line of building was detected by an automatic detecting algorithm. With SAR amplitude images, an initial building height was calculated by the length of layover estimated using KS-test (Kolmogorov-Smirnov test) from the corner line. The interferometric SAR phases were simulated depending on SAR geometry and changable building heights ranging from -10 m to +10 m of the initial building height. With an interferogram from real SAR data set, the simulation results were compared using the method of the phase consistency. One of results can be finally defined as the reconstructed building height. The developed algorithm was applied to repeat-pass TerraSAR-X spotlight mode data set over an apartment complex in Daejeon city, Korea. The final building heights were validated against reference heights extracted from LiDAR DSM, with an RMSE (Root Mean Square Error) of about 1~2m.

A Study on the Methods of Increasing Landscape Area in Building Sites (건축외부공간에 있어서 조경면적의 확대방안에 관한 연구)

  • 정하광
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.21 no.3
    • /
    • pp.105-115
    • /
    • 1993
  • A Purpose of this study is to suggest the methods of increasing landscape area in building sites. There are several means by which landscape design operates. Development bonuses are used to encourage developers to include plazas or walkways or some attractive public space in a development in exchange for increased floor areas. Special zoning districts, in which locally specific design controls are applied, can be established. Site plan controls can be used to regulate the landscape design and landscape management.

  • PDF