• Title/Summary/Keyword: build

Search Result 9,075, Processing Time 0.041 seconds

The build angle of 3D printing denture base resin on candida albicans adhesion. (의치상레진의 3D 프린팅 출력 각도가 Candida albicans의 부착에 미치는 영향)

  • Park, Su-Jung;Song, Young-Gyun
    • The Journal of the Korean dental association
    • /
    • v.58 no.1
    • /
    • pp.19-26
    • /
    • 2019
  • Purpose: The purpose of this study is to compare the adhesion of Candida albicans according to build angle in 3D printing denture base resin. Methods: The 3D printing was performed by setting the build angle of the disk type specimen designed by CAD program at 0 degree, 30 degrees, 60 degrees, and 90 degrees. Surface roughness was measured using a non-contact 3D microsurface profiler. The specimens were incubated in Candida albicans suspension for 24 hours. The attached Candida albicans were detached by cell scraper. The suspension of detached C. albicans was serially diluted and plated on Trypticase soy broth. After 48 hours of incubation, total colony forming unit was counted. Results: There was no significant difference in surface roughness(Sa) between the test groups, but the interlayer boundary was observed. There was no statistically significant difference in total colony forming units of Candida albicans between the test groups. Conclusion: There was no difference in the average surface roughness and adhesion of Candida albicans between the specimens. It is considered that the setting of the build angle should be set considering the accuracy or strength rather than the roughness of the surface.

  • PDF

A Study on the Formation of Presbyterian Missionary Architecture in Andong Area (미국(美國) 북장로회(北長老會) 안동선교부(安東宣敎部) 건축형성과정(建築形成過程)에 대한 연구(硏究))

  • Dho, Sunboong;Han, Kyuyoung
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.2 no.2
    • /
    • pp.47-62
    • /
    • 2000
  • The purpose of this study is to analyze and explain the formation and character of presbyterian missionary architecture in Andong area from 1900 to 1945, which we may call "the modem architecture of Korea". I have surveyed and analyzed the 26 buildings. and so, the major findings of this study are as follows. Firstly, the phase of building is 1) buy the existing Korean traditional building and lot-a thatch roofed house. 2) modify the existing Korean traditional building-a thatch and tile roofed hose. 3) build the Korean style building-a thatch and tile roofed building. 4) build the Western style Building-a timber structured and zinc roofed building. 5) build the Western style Building- a masonry structured and zinc(or tile)roofed building. Secondly, the character of building is 1) In the Korean traditional building, the missionaries change the function for their purpose-office, church, school, hospital. they modify the existing Korean timber frame construction by introducing the material-brick, plaster, glass, Japanese style timber etc .. they live in the Korean existing residential area. 2) In the Western style building, the missionaries build the house according to their life style. they build the timber structured building-church, and the masonry (brick or stone)structured building such as a house, church, school and dormitory, and hospital. their building located on the hill depart from the existing Korean residential area.

  • PDF

Application of Partnering and Constructability in the Design Development Phase of Public Design-Build Projects (공공부문 일괄사업 실시설계단계의 파트너링과 시공성 분석 적용방안)

  • Nam, Yong-Ho;Yeon, Hee-Jung;Hong, Tae-Hoon;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.531-534
    • /
    • 2007
  • In the current domestic design-build contract, design and construction are separated due to prohibition of outside work. but instead the design-build contract adopts a method of fulfilling each assignment as a joint venture, which makes it difficult for participants to communicate each other and often require changes of design. also, It is difficult to performance efficiency project that they don't want to share useful information related to design and construction. In this study suggests how to maxmize the effiency of the project by proposing a process model connected with an efficient partnering and constructability in a deign development phase of design-build constract.

  • PDF

A Comparative Analysis of Integrated Project Delivery in Construction Versus Traditional Methods

  • Peressini, Anthony;Bristow, James;Motahari, Mahmoud;Karakouzian, Moses
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.669-677
    • /
    • 2022
  • In this paper, different types of traditional project delivery methods in the construction industry were explored and a comparative analysis against Integrated Project Delivery (IPD) were performed. The advantages of IPD method for all parties, owner/engineer/architect/general contractor, were explored by reviewing the most recent literature. The literature suggests that IPD method should be the dominating project delivery method and diluting the conventional methods such as Design-Bid-Build due to more collaborative and mutually beneficial ways of doing construction; IPD is newer and a more comprehensive method to capture the intrinsic values of project collaboration. This paper presents a comparison of the commonly used methods of project delivery, Design-bid-build, CMAR, & Design-Build and addresses their advantages and disadvantages in differing project scopes and sizes. Several industry leaders with experience in the four types of project delivery addressed were surveyed. The survey results show an overwhelming desire for future projects to go toward IPD from the contractor/owner/RDP. The biggest obstacle facing a project from using IPD appears to be trust.

  • PDF

A Study on Inlet Pressure Build-up of Air-Lubricated Bearings (공기베어링에서의 선단압력발생에 관한 연구)

  • 김성국;김경웅
    • Proceedings of the Korean Society of Tribologists and Lubrication Engineers Conference
    • /
    • 1999.06a
    • /
    • pp.127-132
    • /
    • 1999
  • The inlet pressure build-up at the leading edge of bearings which have discontinuous lubrication surface is analyzed theoretically. The analyses of Inlet pressure build-up is obtained by means of full Navier-stokes equations. Beam-warming method is used to solve navier-stokes equations. The results show that inlet pressure is above atmosphere pressure in front of leading edge of hearing.

  • PDF

A Case Study on the Analysis of Success and Fail Factors for ERP System Build-up (ERP 구축의 성공/실패요인 분석에 관한 사례연구)

  • 박종만;한상찬
    • Journal of the Korea Safety Management & Science
    • /
    • v.2 no.4
    • /
    • pp.71-90
    • /
    • 2000
  • This study proposes strategical, practical guide to build up ERP system through several case studies to large company and comparative analysis of success and fail factors. Key words in paper .is in summary of previous BPR and ERP studies, try to clarify relationship between BPR and ERP, derivative seeking of practical key success factors through several real cases studies to build up ERP system which is in-house development or customization of commercial package.

  • PDF

Construction Of Fire Resistant Forest Belts (산불피해를 줄일 수 있는 조림방안 - 내화수림대 조성 -)

  • Lim, Joo-Hoon
    • Journal of the Korean Professional Engineers Association
    • /
    • v.38 no.3
    • /
    • pp.1-5
    • /
    • 2005
  • As a method of anti-fire construction in forest region it is proposed to build fuelbreak(vegetated firebreak). Fuelbreak can separate the large area conifer forest into smell parts combined with natural firebreaks. Fuelbreaks can prevent forest fire effectively and also have other functions benefiting the forest ecosystem and environment. 3 kinds of construction skills are introduced for the silviculture technique to build fuelbreaks. And it is proposed to build the firebreaks network in national scale.

  • PDF

The Synchronization Method for Build Small World (Small World 구축을 위한 동기화 기법)

  • 배영철;구영덕
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2004.05b
    • /
    • pp.701-704
    • /
    • 2004
  • In this paper, we proposed that the synchronization method for build small world. In order to build a small world, we used Chua's oscillator which well represent the chaos dynamics and composed several stage with Chua's oscillator by using coupled synchronization method. This paper shows a synchronization result in the small world network using coupled synchronization method. Not only time series and phase plane are implemented but also degree of synchronization in the small world network is presented.

  • PDF

INPUT DATA FILE GENERATION IN I-BUILDS BY AN EXTERT SYSTEM (전문가 시스템에 의한 I-BUIDS의 입력데이타 파일 작성)

  • 최창근;김이두
    • Computational Structural Engineering
    • /
    • v.1 no.1
    • /
    • pp.95-102
    • /
    • 1988
  • I-BUILDS is the building design expert system conceptually modeled for synthesizing the conventional CAD programs (BUILDS; an integrated BUILding Desing System) and the knowledge base into an unified system. As a part of the efforts to build this system, this paper presents the conceptual model by which the data items generated by inference are transformed into a formatted input file to be used for several BUILDS subsystems, each of which is assigned to have various computational capabilities and to perform specialized task.

  • PDF

Combustion and Microexplosion of AI/Liquid Fuel Slurry Droplets(II)-Theoretical Study- (Al/액체연료 슬러리 액적의 연소와 미세폭발 (II)-이론적 연구-)

  • Jo, Ju-Hyeong;Byeon, Do-Yeong;An, Guk-Yeong;Baek, Seung-Uk
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.22 no.6
    • /
    • pp.813-822
    • /
    • 1998
  • The microexplosion of a slurry droplet was considered to be caused by the shell formation and the following pressure build-up in the shell which would be promoted by the suppression of evaporation, subsequent superheating and heterogeneous nucleation of liquid carrier. To closely investigate the pressure build-up and the heterogeneous nucleation, a numerical model was introduced by considering the internal temperature distributions with the shell formation, suppression of evaporation and pressure build-up inside. The microexplosion time was estimated by postulating the limit of superheat for heterogeneous nucleation. The simulation yielded a reasonably good agreement with experimental results for Al/n-heptane slurry droplets under various solid loadings.