• 제목/요약/키워드: budget estimate

검색결과 214건 처리시간 0.02초

Static Worst-Case Energy and Lifetime Estimation of Wireless Sensor Networks

  • Liu, Yu;Zhang, Wei;Akkaya, Kemal
    • Journal of Computing Science and Engineering
    • /
    • 제4권2호
    • /
    • pp.128-152
    • /
    • 2010
  • With the advance of computer and communication technologies, wireless sensor networks (WSNs) are increasingly used in many aspects of our daily life. However, since the battery lifetime of WSN nodes is restricted, the WSN lifetime is also limited. Therefore, it is crucial to determine this limited lifetime in advance for preventing service interruptions in critical applications. This paper proposes a feasible static analysis approach to estimating the worstcase lifetime of a WSN. Assuming known routes with a given sensor network topology and SMAC as the underlying MAC protocol, we statically estimate the lifetime of each sensor node with a fixed initial energy budget. These estimations are then compared with the results obtained through simulation which run with the same energy budget on each node. Experimental results of our research on TinyOS applications indicate that our approach can safely and accurately estimate worst-case lifetime of the WSN. To the best of our knowledge, our work is the first one to estimate the worst-case lifetime of WSNs through a static analysis method.

교육시설의 개념단계 공사비예측을 위한 인공신경망모델 개발에 관한 연구 (A Study on the Model of Artificial Neural Network for Construction Cost Estimation of Educational Facilities at Conceptual Stage)

  • 손재호;김청융
    • 한국건설관리학회논문집
    • /
    • 제7권4호
    • /
    • pp.91-99
    • /
    • 2006
  • 본 연구는 신축 교육시설 프로젝트의 개념단계에서 공사비를 예측하기 위한 인공신경망모델의 제안을 목적으로 한다. 현행 공공 교육시설의 개념단계 공사비예측에는 기본인자인 연면적에 의한 단일변수 모델이 적용되고 있다. 그러나 개념단계에서 단일변수 공사비예측모델을 적용하여 예측된 공사비는 그 오차범위가 크고, 실시설계 완료 후 물량산출에 의해 산정된 상세공사비와 비교하여 큰 차이를 보일 경우 프로젝트의 수정이 불가피하며, 이는 프로젝트의 비용을 증가시키고 공기를 지연시킨다. 그러므로 본 연구에서는 교육시설 프로젝트의 사업계획 수립 및 예산확보 과정에서 공사비예측에 적용이 가능한다 변수 인공신경망모델을 제안하였다. 개발된 모델을 평가한 결과 평균오차율이 6.82%로써, 평균 93.18%의 정확도를 기록하였다. 제안된 인공신경망모델은 지난 5년간 신축된 교육시설의 공사예정금액을 실적자료로 사용하여 학습되었기 때문에, 차후 교육시설 신축공사의 예산편성에 그 활용이 기대된다.

김해지방의 지표경계층내의 열수지 및 안정도 변화에 관한 연구 (A Study on the Variations of Stability and Heat Budget in the Planetary Boundary Layer at Kimhae)

  • 박종길;이화운;김유근;이순환
    • 한국대기환경학회지
    • /
    • 제13권2호
    • /
    • pp.103-113
    • /
    • 1997
  • The research described in this paper was conducted to estimate the stability and heat budget in planetary boundary layer (PBL) at Kimhae. The upper air observation was carried out during period from 3 Februsry 1993 to 5 February 1993 at Kimhae. The surface observation data used the one during period from 1 April 1994 to 31 March 1995. The maximum height of inversion layer observed at Kimhae was 310 m. Destruction of the inversion was simultaneously occurred at the surface and the mid-layer (200 $\sim$ 300 m), however the origin of destruction is different each other. The surface inversion is destructed by surface heating owing to growing radiation in surface but disappearance of the mid-layer inversion is related to the upper cold air movement.

  • PDF

지표면의 특성을 고려한 대기경계층내의 열수지 parameter 추정 -열수지 parameter를 이용한 중규모 순환의 수치예측- (Estimation of the Heat Budget Parameter in the Atmospheric Boundary Layer considering the Characteristics of Soil Surface)

  • 이화운;정유근
    • 한국환경과학회지
    • /
    • 제5권6호
    • /
    • pp.727-738
    • /
    • 1996
  • An one dimensional atmosphere-canopy-soil interaction model is developed to estimate of the heat budget parameter in the atmospheric boundary layer. The canopy model is composed of the three balance equations of energy, temperature, moisture at ground surface and canopy layer with three independent variables of Tf(foliage temperature), Tg(ground temperature), and qg(ground specific humidity). The model was verilied by comparative study with OSUID(Oregon State University One Dimensional Model) proved in HAPEX-MOBILHY experiment. Also we applied this model in two dimensional land-sea breeze circulation. According to the results of this study, surface characteristics considering canopy acted importantly upon the simulation of meso-scale circulation. The factors which used in the numerical experiment are as follows ; the change for a sort of soil(sand and peat), the change for shielding factor, and the change for a kind of vegetation.

  • PDF

업무분할체계를 이용한 사업관리정보시스템 (Project Management Information System Using Work Breakdown Structure)

  • 이정구
    • 한국산업정보학회:학술대회논문집
    • /
    • 한국산업정보학회 1997년도 추계학술대회 발표논문집:21세기를 향한 정보통신 기술의 전망
    • /
    • pp.303-320
    • /
    • 1997
  • In A institute, project managers present quarterly project performance report according to institute's law. In quarterly project performance report, progress of project performance and budget expended should be written. Progress of project performance and progress of budget expended are key management factors in A institute. Because financial database system Is already constructed, progress of budget expended is got from information system. But the progress of project performance that project manager estimate subjectively can not be judged of its correctness because there is not project management information system that is able to calculate the progress of project performance systematically. In this study, we present the project management system assign all activities to every project participator according to their work share rate using WBS(Work Breakdown Structure) and calculate the progress of project performance systematically Also we construct project management information system for above project management system implementing.

  • PDF

한국동해안의 파랑 자료 분석 및 표사량 추정 (Analysis of Wave Data and Estimation of Littoral Drifts for the Eastern Coast of Korea)

  • 김아리;이정열;최병호
    • 한국해안해양공학회지
    • /
    • 제13권1호
    • /
    • pp.18-34
    • /
    • 2001
  • 해파 모형(HYPA)으로부터 산출된 장기 파랑 자료를 이용하여 동해 근해의 파랑 특성을 분석하였다. 또한 파랑작용(wave action)에 의하여 형성되는 토사이동율을 동해안 연안에 대하여 도표화하여 동해안 연안표사수지(littoral sediment budget) 작성의 토대를 마련하였다.

  • PDF

인공위성의 위치획득 오차보정을 위한 몬테카를로 분석 (MONTE CARLO ANALYSIS FOR STATION ACQUISITION ERROR CORRECTION OF SATELLITE)

  • 김지영;최규홍
    • Journal of Astronomy and Space Sciences
    • /
    • 제12권2호
    • /
    • pp.265-274
    • /
    • 1995
  • The purpose of perigee kick motor firing is to place a satellite into transfer orbit and that of apogee kick motor firing is to place the satellite into geosynchonous orbit in order to increase the semi-major axis of the transfer orbit and reduce the inclination of the transfer orbit. Because apogee motor firing is always accompanied with injection errors, the satellite is not placed into geosynchonous orbit but into a near-geosynchonous orbit, also knows as a drift orbit. Thus, the orbital maneuver to correct drift orbit into gteosynchonous orbit is required, this maneuver is called the station acquisition. For reduction of expenditure and performance of mission, we estimate $\Delta$V budget and required fuel allowance for station acquisition. As the uncertainty of drift orbit by injection error of perigee and apogee kick motor firing prevents us from obtaining exact $\Delta$V budget, statistical Monte Carlo simulation technique is used in order to get optimal $\Delta$V budget and required fuel allowance with a probability of 99%. With respect to Korea satellite launched by Delta-2 launch vehicle in 1995, Monte Carlo analysis is used in order to get various orbital parameters, $\Delta$V budget and required fuel allowance for station acquisition with a probability of 99%.

  • PDF

The Importance of Nitrogen Release and Denitrification in Sediment to the Nitrogen Budget in Hiroshima Bay

  • KIM Do-Hee;MATSUDA Osamu
    • 한국수산과학회지
    • /
    • 제29권6호
    • /
    • pp.779-786
    • /
    • 1996
  • The main purpose of this study was to estimate the role of dissolved inorganic nitrogen (DIN) released from sediment and denitrification process in sediment on the nitrogen budget of Hiroshima Bay by means of collecting data on distributions and budgets of nitrogen and phosphorus in the bay, DIN fluxes across sediment-water interface and denitrification rates in the sediments of the same area. The TN : TP and DIN:DIP atomic ratios of the discharged freshwater were about 26 and 21, respectively. The standing stocks in the seawater of the TN : TP atomic ratio varied from 8 to 14 with an annual mean value of 11, while the DIN : DIP atomic ratio varied from 10 to 15 with an annual mean value of 12 in the bay. The residence time of nitrogen and phosphorus were estimated to be about 109 days and 200 days in the bay, respectively. The proportion of DIN released from sediment and denitrification rate to the loading of total nitrogen into Hiroshima Bay were $45\%\;(37\~82\%)\;and\;13\%(0.0\~37\%)$, respectively, and the amount of nitrogen through denitrification process was 6.5 times larger than the outflow of nitrogen from the bay. The results show that DIN released from sediment and denitrification process in sediment play important roles on the nitrogen budget in Hiroshima Bay.

  • PDF

예산제약을 고려한 IT프로젝트 선정 모델 연구 (A Study on the IT Project Selection Considering Budget Constraints)

  • 박재희;조남욱;김우제
    • 한국전자거래학회지
    • /
    • 제18권4호
    • /
    • pp.327-338
    • /
    • 2013
  • IT프로젝트를 수행하는 기업은 정해진 예산범위 내에서 투자계획을 수립하고 실행하게 된다. 이 과정에서 IT프로젝트를 효과적, 효율적으로 선정하는 문제는 기업경쟁력과 직결되는 중요한 요소이다. 그동안 IT프로젝트의 선정을 위한 다양한 모형이 개발되었으나 예산제약을 고려한 효과적 프로젝트 선정에 대한 연구는 보고되지 않고 있다. 본 연구에서는 예산 제약을 고려하여 효과적으로 IT프로젝트를 선정하는 기법을 제시하였다. 본 연구에서 제안한 모델(AHP-K)에서는 AHP(Analytic Hierarchy Process : 계층분석법) 기법을 적용하여 평가 항목의 가중치와 프로젝트 후보군의 가중치를 산정한 후 배낭문제(Knapsack Problem)를 적용하여 예산 범위 내에서 프로젝트 효용을 최대화하는 선정안을 도출한다. 실제 적용단계에서 고려하는 대안이 많거나 신규대안이 추가되는 경우 쌍대비교의 수행이 어려운 점을 감안하여 대안 비교 단계에서 절대평가법을 적용하였다. 본 연구에서는 제시된 모델을 실제 사례에 적용하여 기존 AHP 모형과 비교 분석함으로써 효과성을 검증하였다.

항만 인센티브 예산의 합리적 배분방법 (Allocating the Budget of Port Incentives for Customers)

  • 박병인
    • 한국항만경제학회지
    • /
    • 제32권3호
    • /
    • pp.139-154
    • /
    • 2016
  • 우리나라 여러 항만들에서 활용중인 항만인센티브제도는 경쟁항만과의 가격경쟁력을 높이는 마케팅 도구로 활용되고 있다. 그러나 각 항만은 보다 정밀한 제도의 설계보다는 경쟁항만의 제도에 대한 즉각적이며 단편적인 모방대응전략을 주로 사용하고 있다. 또한 고객 화물 집단별예산도 이론적 검증 없이 배분되었기 때문에 제도의 효과에 대한 정밀한 분석과 제도의 재설계가 요구되고 있다. 본 연구는 선형계획모형으로 항만인센티브제도를 모형화하고, 광양항을 대상으로 사례분석 하였다. 광양항에 대한 분석결과 기존의 정성적인 방식의 인센티브제도 설계만으로는 이론적으로 미흡한 것으로 분석되었으며, 각 유형 마다 인센티브의 효과 유무 또는 과부족 여부도 확인되었다. 인센티브제도의 전체 예산중 마일리지 예산은 최소화하고 기존화물 집단예산에 61.77%, 그리고 신규(증가)화물 집단예산에 38.23%씩 배분하는 것이 더욱 합리적인 것으로 나타났다. 추후연구에서는 본 연구과정에서 제기된 정확한 모형 구축에 필요한 충분한 기초자료에 대한 접근과 인센티브 제도를 더욱 정확하게 파악할 수 있는 제약조건 등이 대한 보완되어야만 할 것이다.