• 제목/요약/키워드: budget constraint

검색결과 74건 처리시간 0.02초

Optimum Inventory Level and optimal Selling Price to Realize a Pre-determined Level of Profit

  • Kang, Suk-Ho;Noh, Seung-Jong
    • 대한산업공학회지
    • /
    • 제12권1호
    • /
    • pp.43-48
    • /
    • 1986
  • In this paper, the one period multi-item inventory model is considered in which it is required to determine the production quantity and selling price of each item which maximize the probability of realizing predetermined level of profit. The objective function of this model is the sum of weighted probabilities which represent the possibility of obtaining the predetermined level of profit for each item. Budget constraint, inventory site constraint and constraints of price are considered. Finally this paper shows a numerical example in which random demand of each item has exponential distribution.

  • PDF

열화가 Wiener process를 따르는 경우의 비용을 고려한 가속열화시험 계획 (Optimal Design of Accelerated Degradation Tests under the Constraint of Total Experimental Cost in the Case that the Degradation Characteristic Follows a Wiener Process)

  • 임헌상
    • 품질경영학회지
    • /
    • 제40권2호
    • /
    • pp.117-125
    • /
    • 2012
  • For the highly reliable products, an accelerated degradation test (ADT) is a useful tool which has been employed in industry to obtain reliability-related information within an affordable amount of time and cost. In an ADT, as all other reliability tests, it is important to carefully design the ADT beforehand to obtain estimates of the quantities of interest as precisely as possible. In this paper, optimal ADTs are developed assuming that the constant-stress loading method is employed and the degradation characteristic follows a Wiener process. Under the constraint that the total cost does not exceed a pre-specified budget, the stress levels, the number of test units allocated to each stress level and the number of measurement (termination time) are determined such that the asymptotic variance of the maximum likelihood estimator of the q-th quantile of the lifetime distribution at the use condition is minimized.

지역별 기술혁신정책의 패턴과 과제 -지방정부 및 중앙정부 예산투입을 중심으로

  • 이공래;이정협
    • 기술혁신연구
    • /
    • 제11권1호
    • /
    • pp.99-123
    • /
    • 2003
  • This study aims to explore the patterns of various innovation policies pursued by local governments in Korea. We surveyed and analyzed 16 regions at the county level and 7 ministries at the central government. It was found from the analysis that there are 719 policy programs having been enacted including some overlaps among 16 regions. 3,369 billion won in total were spent on the policy programs in 2002, of which 36.7 percent was contributed by the central government, 46.4 percent by local governments and remaining 16.8 percent by private partners who may have benefits from the policy programs. It was discovered that support programs for basic research and applied research activities were rare having small budget size, due to the lack of the importance of R&D activities in regional development and budget constraint of local governments. Technology sharing policies, particularly networks and technology transfer are the most underdeveloped one among types of innovation policies. Based upon the results of our analysis, we recommend that budget allocation, associated with science and technology, to local governments should be increased so that they can expand the support scale of existing program: as well as design new types of innovation policies.

  • PDF

예산과 공간 제약하에서 크랭크샤프트 생산라인의 생산능력 증대를 위한 시뮬레이션 기반의 연구 (A Simulation Based Study on Increasing Production Capacity in a Crankshaft Line Considering Limited Budget and Space)

  • 왕관;송수;신양우;문덕희
    • 대한산업공학회지
    • /
    • 제40권5호
    • /
    • pp.481-491
    • /
    • 2014
  • In this paper, we discussed a problem for improving the throughput of a crankshaft manufacturing line in an automotive factory in which the budget for purchasing new machines and installing additional buffers is limited. We also considered the constraint of available space for both of machine and buffer. Although this problem seems like a kind of buffer allocation problem, it is different from buffer allocation problem because additional machines are also considered. Thus, it is not easy to calculate the throughput by mathematical model, and therefore simulation model was developed using $ARENA^{(R)}$ for estimating throughput. To determine the investment plan, a modified Arrow Assignment Rule under some constraints was suggested and it was applied to the real case.

국가능력에 기초한한 군사력 건설방향 (The Direction of Capability-based Military Build-up)

  • 이필중
    • 한국국방경영분석학회지
    • /
    • 제27권2호
    • /
    • pp.88-109
    • /
    • 2001
  • Defense minister of the ROK, Kim Bong-sin suggested that the ROK′s military build-up policy will change from "scenario-based" to "capability-based". Entering the 1990s the ROK′s military build-up policy met difficulties to accomplish its goal, modernizing and strengthening of its force structure and weapon systems because of limited budget. The concept of capability-based military build-up could commit a fault in estimating total amount of defense resources required for force planing. This is because that the total amount of defense resources related to force plan for the 15 years is fixed to embody military strategy. The concept of capability-based military build-up plays a role as a constraint in choosing a military strategy. This has no connection with military build-up. Therefore the resources of mid-term military build-up program and scale of annual defense budget could be affected by the situations of its national economy. In this respect, the scale of annual defense budget and resources could be changed in accordance with national economic condition, however, the total amount of resources required to build-up military force for 15 years, namely resources of military force planing requirement for 15 years, is given already for the accomplishment of military strategy. The purpose of this study is to seek a direction of the ROK′s military build-up policy in a viewpoint of capability-based military build-up.

  • PDF

Optimal Resource Allocation for Fleet Availability Management in Closed Queueing Network

  • Park Kyung S.;Ahn Byung-ha
    • 한국국방경영분석학회지
    • /
    • 제6권2호
    • /
    • pp.47-67
    • /
    • 1980
  • Interactions of major activities participating in fleet operations are investigated in the framework of a closed queueing network system with finite aircrafts assigned to it. An implementable algorithm is developed, which is useful for computing the distributions needed to evaluate the effects of the interactions on the fleet operations. The availability management program is focused on seeking an optimal resource allocation to multiple repair-shops to maximize the fleet availability subject to the budget constraint.

  • PDF

상수관로의 노후도 예측에 근거한 최적 개량 모형의 개발 (I) - 이론 및 모형개발 - (Development of Optimal Rehabilitation Model for Water Distribution System Based on Prediction of Pipe Deterioration (I) - Theory and Development of Model -)

  • 김응석
    • 한국수자원학회논문집
    • /
    • 제36권1호
    • /
    • pp.45-59
    • /
    • 2003
  • 본 연구에서는 상수관의 개량사업을 보다 효율적으로 실시 할 수 있는 방법으로 국내 실정에 적합한 상수관로의 노후도 조사방법을 이용하여 매설된 관의 노후도를 예측 근거한 최적 개량 모형을 제시하였다. 노후도 예측 모형은 확률론적 신경망 이론을 바탕으로 관별 노후도 정도를 5개 등급으로 구분하며 산정된 관별 노후도 등급 및 관경을 바탕으로 최대 잔존수명을 산정하였다. 최적 개량 모형은 관의 유지보수, 갱생, 교체의 시기 및 비용을 산정하는 것으로 최단경로흐름을 응용한 정수계획법을 이용하여 제시하였다. 또한 개발된 최적 개량 모형은 보다 현실적인 모형을 구축하기 위해 예산제약 유무에 따라 2가지 구분하여 모형을 제시하였다. 따라서, 본 연구에서 제안된 모형은 상수관로의 관리를 위해 보다 정량적인 방법으로 활용할 수 있을 것이다.

시스템 가용도를 고려한 수리부품의 재고수준 최적화 (Optimization for Inventory Level of Spare Parts Considering System Availability)

  • 김흥섭;김판수
    • 경영과학
    • /
    • 제31권2호
    • /
    • pp.1-13
    • /
    • 2014
  • In almost all of the organizations, the cost for acquiring and maintaining the inventory takes a considerable portion of the management budget, and thus a certain constraint is set upon the budget itself. The previous studies on inventory control for each item that aimed to improve the fill rate, backorder, and the expenditure on inventory are fitting for the commercially-operated SCM, but show some discrepancies when they are applied to the spare parts for repairing disabled systems. Therefore, many studies on systematic approach concept considering spare parts of various kinds simultaneously have been conducted to achieve effective performance for the inventory control at a lower cost, and primarily, METRIC series models can be named. However, the past studies were limited when dealing with the probability distributions for representing the situation on demand and transportation of the parts, with the (S-1, S) inventory control policy, and so on. To address these shortcomings, the Continuous Time Markov Chain (CTMC) model, which considers the phase-type distributions and the (s, Q) inventory control policies to best describe the real-world situations inclusively, is presented in this study. Additionally, by considering the cost versus the system availability, the optimization of the inventory level, based on this model, is also covered.

공급 사슬 확장을 위한 네트워크 재설계에 관한 연구 (A Study on Network Redesign for Supply Chain Expansion)

  • 송병덕;오용희
    • 한국전자거래학회지
    • /
    • 제17권4호
    • /
    • pp.141-153
    • /
    • 2012
  • 시장 상황의 변화에 따라 상품의 효율적인 공급을 위해 기업은 한정된 예산 내에서 공급 사슬을 변화시킬 필요가 있다. 또한, 경쟁의 심화로 공급 사슬 내에서의 비용 절감뿐만 아니라 적절한 공급 사슬의 구성을 통해 상품의 정시 배송 등 고객 만족도를 높이는 것은 점점 더 중요한 요소로 고려되고 있는 추세이다. 본 연구에서는 공급 사슬 확장에 따른 네트워크 재설계 문제를 다루고 있으며 이에 따른 수리 모형을 제안한다. 또한 유전 알고리즘을 이용하여 예산 제한의 변화에 따른 총 가중 거리의 변화를 계산하여 경영진의 의사결정을 도울 수 있는 방법을 모색한다.

SYNCHRONIZING INDIVIDUALLY OPTIMAL CYCLE TIMES ACROSS MULITI-BUYERS AND MULTI-PRODUCTS

  • Lee, Chang-Hwan
    • Management Science and Financial Engineering
    • /
    • 제4권2호
    • /
    • pp.15-42
    • /
    • 1998
  • A joint problem of order delivery, setup reduction, and cost-sharing in a two-echelon inventory system in which a vendor supplies multiple products to a group of buyers is studied here. The basic premise is that buyers have independently implemented setup reduction programs to acquire benefits from small order sizes. Doing so, however, causes the buyers' individually optimal order cycles to be differ from that of the vendor. In conjunction with this, two models are considered. In the first model, a multi-buyers single product situation is considered in which the vendor implements a joint supply cycle policy. However, buyers, as the dominant party, insist after implementing the individually optimal setup reduction that the vendor accept their individually optimal order schedules. In the second model. a multi-products, single buyer situation is considered in which the buyer implements a joint order policy. Here, the vendor, as the dominant party, refuses to cooperate fully with the buyer's individually reduced joint order schedule, and designs his own individually optimal setup reduction mix for each product under a given budget constraint. This led to a study of an integrated Setup Reduction/Break-even Pricing Policy for each situation to eliminate mismatches in individually optimal cycle times.

  • PDF