• Title/Summary/Keyword: bridge system

Search Result 3,085, Processing Time 0.028 seconds

Investigation on the wind-induced instability of long-span suspension bridges with 3D cable system

  • Zhang, Xin-Jun
    • Wind and Structures
    • /
    • v.14 no.3
    • /
    • pp.209-220
    • /
    • 2011
  • The cable system is generally considered to be a structural solution to increase the spanning capacity of suspension bridges. In this work, based on the Runyang Bridge over the Yangtze River, three case suspension bridges with different 3D cable systems are designed, structural dynamic characteristics, the aerostatic and aerodynamic stability are investigated numerically by 3D nonlinear aerostatic and aerodynamic analysis, and the cable system favorable to improve the wind-induced instability of long-span suspension bridges is also proposed. The results show that as compared to the example bridge with parallel cable system, the suspension bridge with inward-inclined cable system has greater lateral bending and tensional frequencies, and also better aerodynamic stability; as for the suspension bridge with outward-inclined cable system, it has less lateral bending and tensional frequencies, and but better aerostatic stability; however the suspension bridge is more prone to aerodynamic instability, and therefore considering the whole wind-induced instability, the parallel and inward-inclined cable systems are both favorable for long-span suspension bridges.

Fuel Cell Generation System Combined Interleaved Full-bridge Converter with Half-bridge Inverter (인터리브드 풀브릿지 컨버터와 하프브릿지 인버터를 결합한 연료전지 발전 시스템)

  • Kim, Heon-Hee;Lee, Hee-Jun;Shin, Soo-Chul;Jung, Yong-Chae;Won, Chung-Yuen
    • Proceedings of the KIPE Conference
    • /
    • 2012.07a
    • /
    • pp.518-519
    • /
    • 2012
  • This paper suggested a fuel cell generation system which combined interleaved full-bridge converter with half-bridge inverter. High ratio step-up converter is essential to use the power as general voltage source. Full-bridge converter has high efficiency and can boost the input voltage to high output with transformer. With series connected capacitors, interleaved full-bridge converter and half-bridge inverter are combined. Half-bridge inverter has two fewer switches compared to full-bridge type. Also, switching loss can be reduced. The performance is verified through simulation with 1.5[kW] fuel cell generation system.

  • PDF

System identification of a cable-stayed bridge using vibration responses measured by a wireless sensor network

  • Kim, Jeong-Tae;Ho, Duc-Duy;Nguyen, Khac-Duy;Hong, Dong-Soo;Shin, Sung Woo;Yun, Chung-Bang;Shinozuka, Masanobu
    • Smart Structures and Systems
    • /
    • v.11 no.5
    • /
    • pp.533-553
    • /
    • 2013
  • In this paper, system identification of a cable-stayed bridge in Korea, the Hwamyung Bridge, is performed using vibration responses measured by a wireless sensor system. First, an acceleration based-wireless sensor system is employed for the structural health monitoring of the bridge, and wireless sensor nodes are deployed on a deck, a pylon and several selected cables. Second, modal parameters of the bridge are obtained both from measured vibration responses and finite element (FE) analysis. Frequency domain decomposition and stochastic subspace identification methods are used to obtain the modal parameters from the measured vibration responses. The FE model of the bridge is established using commercial FE software package. Third, structural properties of the bridge are updated using a modal sensitivity-based method. The updating work improves the accuracy of the FE model so that structural behaviors of the bridge can be represented better using the updated FE model. Finally, cable forces of the selected cables are also identified and compared with both design and lift-off test values.

Dynamic analysis of wind-vehicle-bridge system considering additional moments of non-uniform winds by wind shielding effect of multi-limb tower

  • Xu Han;Huoyue Xiang;Xuli Chen;Yongle Li
    • Wind and Structures
    • /
    • v.36 no.1
    • /
    • pp.1-14
    • /
    • 2023
  • To evaluate the wind shielding effect of bridge towers with multiple limbs on high-speed trains, a wind tunnel test was conducted to investigate the aerodynamic characteristics of vehicles traversing multi-limb towers, which represented a combination of the steady aerodynamic coefficient of the vehicle-bridge system and wind environment around the tower. Subsequently, the analysis model of wind-vehicle-bridge (WVB) system considering the additional moments caused by lift and drag forces under nonuniform wind was proposed, and the reliability and accuracy of the proposed model of WVB system were verified using another model. Finally, the factors influencing the wind shielding effect of multi-limb towers were analyzed. The results indicate that the wind speed distributions along the span exhibit two sudden changes, and the wind speed generally decreases with increasing wind direction angle. The pitching and yawing accelerations of vehicles under nonuniform wind loads significantly increase due to the additional pitching and yawing moments. The sudden change values of the lateral and yawing accelerations caused by the wind shielding effect of multi-limb tower are 0.43 m/s2 and 0.11 rad/s2 within 0.4 s, respectively. The results indicate that the wind shielding effect of a multi-limb tower is the controlling factor in WVB systems.

A Study for Developing of Rail Bridge Inspection Robot (철도교량 자동화 로봇 개발을 위한 기초 연구)

  • Koo, Ja-Kyung;Hwang, In-Ho;Lee, Jong-Seh;Lee, Tai-Sik
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.188-193
    • /
    • 2008
  • According to introduce KTX in Korea, rail-road bridge section of KTX was increased approximately 50% of the total length. Bridge is required periodic inspection and check to prevent accident and hazard because various damage which have effects on traffic and replacement of damaged parts is difficult. Specifically, the train as large-scale transportation because accidents led to great damage, preventing these accidents are critical. Well-organized management and maintenance systems are required to prevent the accidents. In the case of roadway bridge, bridge inspection vehicle is used to deploy inspectors in roadway bridge. However, this method requires a lot of time and efforts, and inspectors are exposed to potential hazard. Also, surrounding environment like poor lighting system or electric wire could harm the inspector while repairing. Due to this reason, automatic repairing and inspecting system have been introduced to replace the old methods. Management system of the railroad bridge track for trains uses various advanced equipments, but whereas roadway bridge management system is lacking these efforts. As a result of that, this study looks over the existing management method. and review the method to apply the Bridge Inspection Robot in railroad bridge. Moreover, this study suggests future management technology using inspection robot.

  • PDF

Development on Thermal Bridge Barrier Between Window Frame and Wall (건축물의 창틀과 벽체 사이 열교 차단을 위한 단열공법 개발)

  • Park, Cheol-Yong;Kim, Woong-Hoi;Lee, Sang-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.11a
    • /
    • pp.10-11
    • /
    • 2018
  • Internal Insulation system is applied to the most apartment building in Korea. However due to the importance of building energy enhanced the interest of the exernal insulation system. The extermal insulation system has better thermal performance because the thermal bridge through the structure are rarely formed. But the thermal bridge around the window decrease the thermal performance of the envelope system. Therefore the technology for reducing the thermal bridge around window improves energy efficiency of the building. In order to this it is necessary to minimize the thermal bridge around window of building. In this study it is aimed to minimize the thermal bridge around the window of building. It was confirmed that the use of thermal bridge barrier imporved the heat transfer rate by 64% or more and the condensation reduction phenomenon by 42% or more compared with the exist technology. These thermal bridge barrier will be used as the main technology to improve the energy efficiency of building.

  • PDF

Vibration of vehicle-bridge coupling system with measured correlated road surface roughness

  • Han, Wanshui;Yuan, Sujing;Ma, Lin
    • Structural Engineering and Mechanics
    • /
    • v.51 no.2
    • /
    • pp.315-331
    • /
    • 2014
  • The present study investigated the effect of the correlation of the measured road roughness profiles corresponding to the left and right wheels of a vehicle on the vibration of a vehicle-bridge coupling system. Four sets of road roughness profiles were measured by a laser road-testing vehicle. A correlation analysis was carried out on the four roughness samples, and two samples with the strongest correlation and weakest correlation were selected for the power spectral density, autocorrelation and cross-correlation analyses. The scenario of a three-axle truck moving across a rigid-frame arch bridge was used as an example. The two selected road roughness profiles were used as inputs to the vehicle-bridge coupling system. Three different input modes were adopted in the numerical analysis: (1) using the measured road roughness profile of the left wheel for the input of both wheels in the numerical simulation; (2) using the measured road roughness profile of the right wheel for both wheels; and (3) using the measured road roughness profiles corresponding to left and right wheels for the input corresponding to the vehicle's left and right wheels, respectively. The influence of the three input modes on the vibration of the vehicle-bridge system was analyzed and compared in detail. The results show that the correlation of the road roughness profiles corresponding to left and right wheels and the selected roughness input mode both have a significant influence on the vibration of the vehicle-bridge coupling system.

The Simulation and Experimental Study on the Bridge Response of AGT Bridge - Vehicle interaction System (AGT 시스템 교량-차량 상호작용에 의한 교량응답 시뮬레이션 및 실험)

  • Na, Sang-Ju;Kim, Ki-Bong;Song, Jae-Pil;Kim, Hyun-Ho
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.395-400
    • /
    • 2007
  • LRT(Light Railway Train), which is a intermediate system of train and bus, is arose for the solution of subway construction cost and the transportation capacity of bus. LRT was introduced in 1980's. About 30 local governments are plan to introduce LRT or constructing LRT, at present. AGT(Automated Guide-way Transit) system, which is a kind of LRT, is operated without driver. Rubber wheeled AGT system can reduce the noise and vibration compare to steel wheeled AGT, so it is estimated as ideal transportation system for urban area. And live loads at bridge are classified as the static load of vehicle and the dynamic wheel contact load which is occurred from the interaction of bridge and vehicle vibration, and the surface roughness. In the case of AGT system, the dynamic increment factor of bridge is greater than the normal train bridge and roadway bridge, because, the weight of AGT vehicle is more light that the train of truck. The exact method for dynamic increment factor is experiment. But this method is needed much money and time, moreover, this method cannot be adopted in design. Therefore, a simulation program for the interaction of AGT bridge, vehicle and surface roughness was developed, in this study. And the program was verified by experiment. As a result, the accuracy of the simulation program can be verified.

  • PDF

Basic study about Geometric feasibility Analysis of the System form for the Bridge Slab (교량 상판 콘크리트 타설용 거푸집 시스템의 기하학적 타당성 분석의 기초연구)

  • Sung, Soojin;Lim, Jeeyoung;Kim, Sunkuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.197-198
    • /
    • 2014
  • The concrete work of bridge decks is performed in a high place, which may reduce safety and productivity. In addition, the conventional method for deck forms require a great deal of manpower, and a form (sheathing) board is damaged when removed after curing. As a result, the concrete deck work of bridge construction becomes the cause of delayed construction and increased cost. To solve these problems, SMART form, a system form, is developed. SMART form is a temporary device for easier installation and removal, by mounting it to the lower flange of a bridge girder and using a mechanical behavior of the form system for deck concrete pouring. For stable installation and removal of the developed SMART form, geometric behaviors should be analyzed to prove its validity. Furthermore, the validity of geometric behaviors when the SMART form size is altered in response to the various arrangement of bridge girders should be proved. Thus, the study is intended to analyze the geometric validity of the form system for bridge deck concrete pouring. The structural stability of the form system for bridge deck concrete pouring can be secured, which will be applied in the field.

  • PDF

A Experimental study on the Bridge Response of AGT System by Guiderail Prominence (AGT 시스템 안내레일 요철에 의한 교량 응답에 관한 실험적 연구)

  • Kang, Sung-Won;Han, Sang-Chul;Lee, An-Ho;Jung, In-Keun
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.453-457
    • /
    • 2007
  • AGT system is a kind of light railway train. AGT system use of concrete track and rubber tire, so it can be reduce the noise and vibration, compare to the normal train system. And, the dynamic responses of normal bridge are influenced by the dynamic characteristics of bridge, the speed of vehicle and the surface roughness of railway. But the AGT system bridge is influenced not only the above facts but also the guiderail unevenness, because, AGT vehicle steered by guiderail. So, in this study, optimized service condition is suggested for the design and operation of AGT system, by the means of experimental study. The experiments are executed for PSC bridge with length of 30m, at the AGT test line in Kyongsan. The test results are compared and investigated according to the prominence. In the test result, the guiderail prominence influenced on the dynamic response of bridge. It shows a increase as compared with no guiderail prominence in the dynamic response value acceleration, displacement, stain.

  • PDF