• 제목/요약/키워드: bridge life cycle phases

검색결과 6건 처리시간 0.026초

Applications of bridge information modeling in bridges life cycle

  • Marzouk, Mohamed M.;Hisham, Mohamed;Al-Gahtani, Khalid
    • Smart Structures and Systems
    • /
    • 제13권3호
    • /
    • pp.407-418
    • /
    • 2014
  • The purpose of this paper is to present an Integrated Life Cycle Bridge Information Modeling that can be used throughout different phases of the bridge life cycle including: design, construction, and operation and maintenance phases. Bridge Information Modeling (BrIM) has become an effective tool in bridge engineering and construction. It has been used in obtaining accurate shop drawings, cost estimation, and visualization. In this paper, BrIM is used as an integrated tool for bridges life cycle information modeling. In the design phase, BrIM model can be used in obtaining optimum construction methods and performing structural advanced analysis. During construction phase, the model selects the appropriate locations for mobile cranes, monitors the status of precast components, and controls documents. Whereas, it acts as a tool for bridge management system in operation and maintenance phase. The paper provides a detailed description for each use of BrIM model in design, construction, and operation and maintenance phases of bridges. It is proven that BrIM is an effective tool for bridge management systems throughout their life phases.

건설프로젝트 생애주기 BIM 활용 기능도출 및 시스템 구축 -교량공사를 중심으로- (Development of BIM Functions and System for Construction Project Through Project Life Cycle -Focusing on Bridge Construction Project-)

  • 김현승;문현석;최광열;김창학;강인석
    • 한국건설관리학회논문집
    • /
    • 제13권2호
    • /
    • pp.11-24
    • /
    • 2012
  • 최근 공공사업 발주조건에 BIM(Building Information Modeling)이 의무화되고 있고, 실무 도입을 통한 성공 사례가 증가되면서 건설 분야의 BIM 도입이 본격화되고 있다. 그러나 기존의 BIM 관련 연구는 대부분 설계 또는 시공단계에 한정되어 수행됨에 따라 건설프로젝트의 생애주기를 고려하지 못하고 있고, 특정 업무지원 기능 위주로 진행되고 있다. 따라서 본 연구에서는 건설공사 프로젝트의 기획부터 유지관리단계의 생애주기 동안 단계별 BIM 적용이 가능한 통합 BIM 운영 프로세스를 제안하고 이를 토대로 통합 BIM 시스템을 개발한다. 이를 위해 교량공사를 대상으로 수행단계별 정보체계를 분석하여 BIM 활용 기능과 적용 프로세스를 제시하였으며, 이에 근거하여 수행단계별 BIM 운영 시스템을 구축하였다. 연구에서는 개발된 시스템의 실무 적합성 검증을 위해서 사례적용과 건설 실무자의 활용성 설문 조사를 수행하였다. 이러한 BIM 통합 운영체계는 생애주기를 고려한 건설공사의 3차원 기반 통합정보관리체계로 활용성이 기대된다.

Development of framework to estimate environmental loads of PSC beam bridges based on LCA

  • Lee, Wan Ryul;Kim, Kyong Ju;Yun, Won Gun;Kim, In Kyum
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.730-731
    • /
    • 2015
  • This study aims at giving the framework to estimate the environmental load at planning and schematic phase. With increasing awareness of environmental issues, the effort to reduce the environmental impacts caused by human activity has been increasingly enlarged. So far most of researches estimating CO2 emissions have analyzed energy consumption based on BOQ (Bills of Quantity) acquired after detailed design. There is also lack of reliability in the estimated environmental impact using the basic unit of a facility at the planning stage, because it uses a limited specific section of historical data. Thus, this study is targeted at developing framework to assess reliable environmental loads based on information available at project early phases by making case-bases from historical design information on PSC Beam Bridge. Historical database is built on the basis of the LCA (Life Cycle Assessment) and in order to set input information for estimating model, the literature about information in an early project phase are reviewed. Using the information available in the planning and schematic design stage, the Framework is presented to estimate the environmental load in an early stage in the project. Developing an environmental load estimation model in accordance with the Framework presented in this study, it is expected that the environmental load in the initial project phase can be estimated more quickly and accurately.

  • PDF

원자력 발전소 제품 데이터의 공유를 위한 중립 모델 기반의 데이터 웨어하우스의 구축 (A Standard Way of Constructing a Data Warehouse based on a Neutral Model for Sharing Product Dat of Nuclear Power Plants)

  • 문두환;천상욱;최영준;한순흥
    • 한국CDE학회논문집
    • /
    • 제12권1호
    • /
    • pp.74-85
    • /
    • 2007
  • During the lifecycle of a nuclear power plant many organizations are involved in KOREA. Korea Plant Engineering Co. (KOPEC) participates in the design stage, Korea Hydraulic and Nuclear Power (KHNP) operates and manages all nuclear power plants in KOREA, Dusan Heavy Industries manufactures the main equipment, and a construction company constructs the plant. Even though each organization has a digital data management system inside and obtains a certain level of automation, data sharing among organizations is poor. KHNP gets drawing and technical specifications from KOPEC in the form of paper. It results in manual re-work of definition and there are potential errors in the process. A data warehouse based on a neutral model has been constructed in order to make an information bridge between design and O&M phases. GPM(generic product model), a data model from Hitachi, Japan is addressed and extended in this study. GPM has a similar architecture with ISO 15926 "life cycle data for process plant". The extension is oriented to nuclear power plants. This paper introduces some of implementation results: 1) 2D piping and instrument diagram (P&ID) and 3D CAD model exchanges and their visualization; 2) Interface between GPM-based data warehouse and KHNP ERP system.

Beyond SDLC: Process Modeling and Documentation Using Thinging Machines

  • Al-Fedaghi, Sabah
    • International Journal of Computer Science & Network Security
    • /
    • 제21권7호
    • /
    • pp.191-204
    • /
    • 2021
  • The software development life cycle (SDLC) is a procedure used to develop a software system that meets both the customer's needs and real-world requirements. The first phase of the SDLC involves creating a conceptual model that represents the involved domain in reality. In requirements engineering, building such a model is considered a bridge to the design and construction phases. However, this type of model can also serve as a basic model for identifying business processes and how these processes are interconnected to achieve the final result. This paper focuses on process modeling in organizations, per se, beyond its application in the SDLC when an organization needs further documentation to meet its growth needs and address regular changes over time. The resultant process documentation is created alongside the daily operations of the business process. The model provides visualization and documentation of processes to assist in defining work patterns, avoiding redundancy, or even designing new processes. In this paper, a proposed diagrammatic representation models each process using one diagram comprising five actions and two types of relations to build three levels of depiction. These levels consist of a static description, events, and the behavior of the modeled process. The viability of a thinging machine is demonstrated by re-modeling some examples from the literature.

대표공종 기반의 PSC Box 교량 상부공사 개략공사비 산정모델에 관한 연구 (Development of the Approximate Cost Estimating Model for PSC Box Girder Bridge based on the Breakdown of Standard Work)

  • 김상범;조지훈
    • 대한토목학회논문집
    • /
    • 제33권2호
    • /
    • pp.791-800
    • /
    • 2013
  • 국내 도로 건설사업의 사업초기단계에서의 개략공사비 산정은 예비타당성조사, 도로업무편람, 투자평가지침에서 제시하는 도로의 평균단가 또는 표준단가를 기준으로 도출되는데 이는 공사비 산정 표준체계 부재 및 기초자료 갱신 평균단가를 적용하여 공사비를 산출하는 방식으로 본 연구의 대상인 특수 교량공사의 특성을 전부 반영하기에 미흡한 실정이다. 또한, 신속한 의사결정이나 대안선택이 결정되는 설계단계에서 소모적이고 획일적인 공사비 산정방식의 한계점을 개선하고 사업초기단계의 개략공사비산정 프로세스의 효율성 및 신뢰도를 높이기 위한 새로운 공사비 산정 모델을 개발이 요구된다. 이에 본 연구에서는 평균건설단가를 적용하여 개략 공사비를 산출하는 기존 방식에서 벗어나 대표공종 기반의 상세물량입력 모델을 구축하였다. 실적 공사비 데이터 및 공종별 원가자료를 기반으로 토목공사 수량산출 지침서 기준 전체 공종내역 중 공사비 누적비율 대비 95%이상을 차지하는 대표적인 공종을 도출하였다. 상부면적당 대표공종기반 단위물량 및 차로수별 공사비단가를 제시하고, 이를 활용하여 교량형식별로 상부면적당 공사비단가를 도출 및 검증을 통해 사업초기단계에서 업무추진 의사결정의 신뢰적 지원 및 효율적인 공사비 산정방식을 도출 하였다.