Korean Journal of Construction Engineering and Management
/
v.23
no.2
/
pp.3-15
/
2022
In this study, we develop a simulation model for Supply Chain Management (SCM) of modular construction based steel bridge. To this end, first, Factory Production/Site Construction system data for the steel bridge construction were collected, and supply chain, entities, resources, processes were defined based on the collected data. After that, a steel bridge supply chain simulation model was developed by creating data, flowchart, and animation modules using Arena software. Finally, verification and validation of the model were performed by using animation check, extreme condition check, average value test, Little' s law test, and actual case value test. As a result, the developed simulation model appropriately expressed the processes and characteristics of the steel bridge supply chain without any logical errors, and provided accurate performance evaluation values for the target system. In the future, we expect that the model will faithfully play a role as a performance evaluation platform in developing management techniques for optimally operating the steel bridge supply chain.
International conference on construction engineering and project management
/
2007.03a
/
pp.810-819
/
2007
Usually the status of a bridge is determined by its structural capability and material strength. Consequently a lot of researchers have studied the failure, the fatigue, and the deterioration of the structure in terms of the structural function of a bridge. However, the overall performance of a bridge may be affected simply by the damage of one of its components. Therefore this study utilized a systematic classification and statistical analysis based on the existing bridge inspection data collected in Taiwan to reach the following goals: (1) assess the performance distribution and deterioration rate for bearing and expansion joint of bridge; (2) find out the right time to do the preventive and essential maintenance for the component of bridge with an empirical method, and to decide what time and which component of a bridge will receive preventive maintenance or regular maintenance.
Sim, Youngjong;Jin, Kyu-Nam;Hong, Eun-Soo;Kim, Hansung;Park, Jun Kyung
Land and Housing Review
/
v.12
no.3
/
pp.97-108
/
2021
In bridge abutment structures, lateral squeeze due to lateral stress of embankment placement and thermal movement of the bridge structure leads to failure of approach slabs, girders, and bridge bearings. Recently, GRS (Geosynthetic-Reinforced Soil) integral bridge has been proposed as a new countermeasure. The GRS integral bridge is a combining structure of a GRS retaining wall and an integral abutment bridge. In this study, numerical analyses which considered construction sequences and earthquake loading conditions are performed to compare the behaviors of conventional PSC (Pre-Stressed Concrete) girder bridge, traditional GRS integral bridge structure and GRS integral bridge with bracket structures (newly developed LH-type GRS integral bridge). The analysis results show that the GRS integral bridge with bracket structures is most stable compared with the others in an aspect of stress concentration and deformation on foundation ground including differential settlements between abutment and backfill. Furthermore, the GRS integral bridge with/without bracket structures was found to show the best performance in terms of seismic stability.
Proceedings of the Korean Institute of Building Construction Conference
/
2014.11a
/
pp.195-196
/
2014
Unlike general construction works, bridge construction is mostly done in a high place. The conventional deck form of bridge is installed between precast concrete girders using sleepers, bridging joints and plywoods, and after concrete is poured to the deck, the form materials are removed at high altitudes. When removing the form, it may be dropped on ground, damaging the materials and resulting in economic loss. In addition, safety accidents are likely as the works are performed in a high place, and as the manpower increases, the cost increases. Also, it is difficult to install and remove temporary equipment. Therefore, it is required to develop a system form that allows easier and quicker installation and removal by unskilled workers and ensures safety of workers. In this regard, the study is intended to analyze requirements for the system form for pouring concrete to bridge decks, which can be easily installed and removed. The study result will be used as basic information for development of the system form for pouring concrete to bridge decks.
Modular bridge construction enabling better productivity of design and construction by standardized members and robotic construction becomes an important issue in construction industry. Modular structures needs accurate information delivery between design, fabrication and construction processes. BIM (Building Information Modeling) based parametric modeling was proposed for the modular bridge substructure. Considering ranges of parameters of the modular bridge, fixed value, variables and relations were defined and these parametric models were applied to design, analysis and fabrication. Experience from development of new structures can be embedded in the 3D models, and the models provide efficient and precise knowledge delivery.
KSCE Journal of Civil and Environmental Engineering Research
/
v.14
no.6
/
pp.1309-1317
/
1994
Because the stiffening girders are constructed after the installation of hangers for typical suspension bridge, no additional tensioning to hangers in construction is necessary for this bridge type in which main cable is earth-anchored. However, for self-anchored suspension bridge, hangers are installed after temporarily supporting stiffening girders constructed in previous stage. Therefore, initial tension is required on installing hangers. Tension of hangers varies as the construction proceeds. Hence, it is necessary to determine the most efficient method of installing hangers among several methods. This study presents finite element procedures and the algorithms of construction stage analysis to simulate construction processes. Geometric nonlinear analysis scheme is also included. The most effective method regarding the installation of hangers is presented through the examples of actual bridge model.
The temperature data were measured for two years in a bridge specimen and the bridge in service nearby in order to calculate the effective temperature for thermal loads in steel box girder bridge. The maximum and minimum effective temperatures were calculated in the bridge specimen and the bridge according to air temperature in 2014, 2015 and 2years. The effective temperatures calculated in this study were compared the Euro code and the Highway Bridge Design Criteria. The coefficients of determination in the maximum effective temperature and the Euro code for 2 year were calculated from R = 0.927, R = 0.894 in a bridge specimen and the bridge respectively. Those of minimum temperature and the Euro code were analyzed from R = 0.992, R = 0.813 in two bridge respectively. Also, the results were evaluated as being very similar, or slightly increased as compared with the maximum temperature of the Korean Highway Bridge Design Code(Limit State Design).
Park, Jong-Myen;Kim, Jin-Bae;Jun, Sung-Yong;Kim, Chung-Sik;You, Sung-Kun;Park, Joong-Bai;Lim, Jung-Hoon
Journal of the Korean Society for Advanced Composite Structures
/
v.5
no.2
/
pp.21-26
/
2014
This paper introduces general concepts of jointless bridges and field construction case of semi-integral bridge with psc girder integrating end-diaphragm. The expansion joints need to satisfy thermal and safety conditions of bridges. General bridges with joints have some problems, which are frequently replacement cycle time from mechanical damage or unstable movement, maintenance cost and more. To solve these problems, Integral Abutment Bridges(IAB) have been applied overseas in the 1930s. In Korea, first IAB was constructed in the early 2000s and precast IAB systems was invented and applied lately. Kyungshin overpass bridge in Incheon is the Semi-IAB constructed, the span length is 2@35=70m and the width is 13.9m. The original plan was to use general joint bridge but design field changed with expectations for advanced economic estimation and maintenance. This changed method of B.I.B bridge construction provided not only workability, construction cost but also safety improvement at the same time.
In this study, the construction of a reinforced concrete bridge pier was analyzed from durability point of view. The goal of the study is to analyze the crack iniation condition due to construction and present some recommendations for construction conditions of the reinforced concrete bridge pier. The bridge is located at the western port area of Shenzhen, where the climate is high temperature and humidity. To control the cracking of concrete, a construction simulation was carried out for a heat transfer problem as well as a thermal stress problem. A shrinkage model for heat produced due to cement hydration and a Burger constitutive model to simulate the creep effect are used. The modelling based on Femmasse(C) is verified by comparing with the testing results of a real underground abutment. For the bridge pier, the temperature and stress distribution, as well as their evolution with time are shown. To simulate the construction condition, four initial concrete temperatures ($5^{\circ}C$, $10^{\circ}C$, $15^{\circ}C$, $20^{\circ}C$) and three demoulding time tips (48h, 72h, 96h) are investigated. From the results, it is concluded that a high initial concrete temperature could result in a high extreme internal temperature, which causes the early peak temperature and the larger principle stresses. The demoulding time seems to be less important for the chosen study cases. Currently used 72 hours in the construction practice may be a reasonable choice.
Journal of the Korean Professional Engineers Association
/
v.34
no.4
/
pp.17-29
/
2001
After participating in the 2nd, Asian Civil Engineering Conference which is subjected by Japan, a trip of site during construction recent was done. The country Is being developed to use effectvely by the methods of aqua-line, truss suspersion bridge. double deck bridge, etc. The Japanese engineers have a pride to do their best for the construction In the given environment. 1 want to notify that our civil engineers must have the responsibility to develop the technical engineering, to make the useful country and to resolve the environmental problem via the oversea experience like as.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.