• Title/Summary/Keyword: bridge configuration

Search Result 228, Processing Time 0.018 seconds

Buck-Boost Interleaved Inverter Configuration for Multiple-Load Induction Cooking Application

  • Sharath Kumar, P.;Vishwanathan, N.;Bhagwan, K. Murthy
    • Journal of Electrical Engineering and Technology
    • /
    • v.10 no.1
    • /
    • pp.271-279
    • /
    • 2015
  • Induction cooking application with multiple loads need high power inverters and appropriate control techniques. This paper proposes an inverter configuration with buck-boost converter for multiple load induction cooking application with independent control of each load. It uses one half-bridge for each load. For a given dc supply of $V_{DC}$, one more $V_{DC}$ is derived using buck-boost converter giving $2V_{DC}$ as the input to each half-bridge inverter. Series resonant loads are connected between the centre point of $2V_{DC}$ and each half-bridge. The output voltage across each load is like that of a full-bridge inverter. In the proposed configuration, half of the output power is supplied to each load directly from the source and remaining half of the output power is supplied to each load through buck-boost converter. With buck-boost converter, each half-bridge inverter output power is increased to a full-bridge inverter output power level. Each half-bridge is operated with constant and same switching frequency with asymmetrical duty cycle (ADC) control technique. By ADC, output power of each load is independently controlled. This configuration also offers reduced component count. The proposed inverter configuration is simulated and experimentally verified with two loads. Simulation and experimental results are in good agreement. This configuration can be extended to multiple loads.

Determination Method for Topology Configuration of Hybrid Cascaded H-Bridge Rectifiers

  • Zhuang, Yuan;Wang, Cong;Wang, Chang;Cheng, Hong;Gong, Yingcai;Wang, Hao
    • Journal of Power Electronics
    • /
    • v.16 no.5
    • /
    • pp.1763-1772
    • /
    • 2016
  • To reduce system complexity and implementation costs, fully-controlled H-bridge (FHB) modules and diode H-bridge PFC (DHB) modules are cascaded to form a hybrid cascaded H-bridge rectifier (HCHR). In this paper, the advantages of such a HCHR over other cascaded rectifiers are analyzed depending on the numbers of FHB modules and DHB modules. Therefore, to assign proper numbers to these two kinds of modules for the HCHR, a configuration determination method is investigated under balanced and imbalanced loads. Three principles are also presented to guide the configuration determination for the HCHR. In addition, the constraints for selecting the step-up ratio and filter inductance are derived based on a phasor diagram analysis. The proposed configuration determination method is validated by simulations under three different conditions in the PSIM environment. Finally, experiments are carried out on a scaled-down prototype where the configuration can be easily adjusted. The feasibility of the proposed theory is then verified by experimental results.

The Increment Of The Local Scour Depth At Piers By Constructing The Bridge Between Existing Bridges

  • Choi, Gye-Woon;Kim, Gee-Hyoung
    • Water Engineering Research
    • /
    • v.1 no.2
    • /
    • pp.159-168
    • /
    • 2000
  • In this paper, the increment of the local scour depth at piers by constructing the bridge between existing bridges is examined through the experiments in which 5 piers in the non-cohesive bed material in the experimental flume were installed. In the experiments the maximum distance of 25 times of the pier length and the maximum distortion width of 8 times of the pier width were utilized. Through the experimental studies, it was indicated that low flow, which can be characterized as the flow having low Froude numbers, the maximum bed configuration change is obtained when the piers are installed in the straight line in the flor direction without any distortion. However, In the high flow, which can be characterized as the flow having high Froude numbers, the maximum bed configuration change is obtained when the piers are installed with some distortion from the flow direction. The influence of the bed configuration by interaction between bridge piers is changed depending upon the Froude numbers, the distance between piers, and the distortion width between adjacent bridge piers. Also, because the scour patterns are affected by the bed configuration, the maximum scour should be increased by about 60% compared to that in a single pier if the interaction between bridge piers exists. It can be suggested that the maximum scour depth at bridge piers predicted by applying the existing equations should be increased if the interaction between bridge piers exist. Those cases are found when new bridges are constructed successively in the river in the urban area.

  • PDF

Active tendon control of suspension bridges: Study on the active cables configuration

  • Tian, Zhui;Mokrani, Bilal;Alaluf, David;Jiang, Jun;Preumont, Andre
    • Smart Structures and Systems
    • /
    • v.19 no.5
    • /
    • pp.463-472
    • /
    • 2017
  • In a previous study, the potential of damping suspension bridges with active stay cables has been evaluated on a numerical model of a suspension bridge, and demonstrated experimentally on a laboratory mockup. In this paper, we extend our study to explore two different configurations of the active stay-cables: one classical configuration, corresponding to attaching the active stay-cables between the top of the pylons and the deck (configuration I) and, another configuration, consisting of attaching the stay-cables between the base of the pylons and the catenary (configuration II). The analysis confirmed that both configurations are effective with a slight superiority of the second configuration. The study is conducted numerically and experimentally on a suspension bridge mock-up, by considering two types of active stay-cables. The experimental results confirmed the numerical predictions, and demonstrated the effectiveness of the second configuration.

A Study on the Configuration Management System of Long Span Bridge Using Multi GPS Sensor (멀티 GPS 센서를 이용한 장대교량의 형상관리시스템 개발에 관한 연구)

  • Choi, Byoung-Gil;No, Young-Woo
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.27 no.3
    • /
    • pp.385-392
    • /
    • 2009
  • This study aims to methodology a system which is able to monitor and configuration management of long span bridge in real time using multi GPS. Through setting up many GPS at the important points of long span bridge and measuring displacement in real time, over all 3D configuration of bridge could be analyzed. Behavior analyzing system developed in this study is able to digitize and visualize the overall and points displacement of bridge and deal with events actively. Also it is able to calculate statistical data related to analyze behavior through the constricting database of measuring data.

A Structural Analysis Model for the Initial Configuration of a Suspension Bridge Considering the Erection Method of Stiffening Girders (보강형의 시공방법을 고려한 타정식 현수교의 초기형상해석 모델)

  • Ko, Seong Seok;Kang, Sung Hoo;Park, Sun Joon;Jung, Jae Ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.4A
    • /
    • pp.337-346
    • /
    • 2009
  • To determine the initial configuration of the suspension bridge appropriate idealization model and analysis procedure are proposed as considering the boundary and loading conditions of stiffening girder during the erection. The construction stages of a suspension bridge are divided into two steps which are the first stage of the erection and the second stage of the completion in terms of the erection time of stiffening girders, and depending upon such an erection step the initial configuration analysis is classified the first configuration analysis and the revision analysis of the second configuration. The boundary and loading conditions and the analysis procedures for each stage are suggested and the results are verified by comparing with existing data. The results show that the proposed method provides better solution compared to the results using existing method.

Development of Sag and Tension Sensitivity Estimation Method for Configuration Control under PPWS Erection in a Suspension Bridge (현수교 PPWS 가설중 형상관리를 위한 PPWS 새그 및 장력민감도 산정법 개발)

  • Jeong, Woon;Seo, Ju Won;Lee, Won Pyo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.5A
    • /
    • pp.255-266
    • /
    • 2012
  • Main cable of a suspension bridge is the important member which shows the overall structure integrity at bridge completion. Configuration of main cable is a free hanging state at cable erection completion and is different from that at bridge completion supporting the dead loads such as hanger, girder, and so on. Accordingly, the configuration control under cable erection is considerably significant because the configuration at cable erection completion has direct influence on that at bridge completion. That is performed by sag adjustments at center, side span and tension adjustments at anchor span. The former needs the sag sensitivity which represents the control quantity of strand length corresponding to that of sag. The latter requires the tension sensitivity which shows the change of strand tension according to that of strand temperature. In this study, the fundamental equations of cable were derived with the assumption of either catenary or parabola shape, the differential-related equations using chain rule on horizontal tension were drawn from those and finally the estimation methods of the sag / tension sensitivity were proposed from both those. The nonlinear numerical analysis flow charts of sag sensitivity based on the catenary equations were proposed and the sag sensitivities grounded on the differential-related equations were compared with the results using them for various parameters of sag change. Also, considering the combinations of sag change parameters, the calculation method of the final variation for the cable sag was suggested. For the real suspension bridge under construction with PPWS method, the sag/tension sensitivity were estimated considering the construction conditions like the change of PPWS length, PPWS temperature, bridge span, etc.. We hope that this study will be a systematic guideline for the configuration control under main cable erection and improved highly by field verification in the real bridge site.

Output Voltage Control in a Serise Multilevel H-bridge Inverter with SHE-PWM Method (직렬 멀티레벨 H-bridge inverter에서 SHE-PWM방식을 사용한 출력 전 압의 제어)

  • Kim J.Y.;Jeong S.G.
    • Proceedings of the KIPE Conference
    • /
    • 2003.07a
    • /
    • pp.1-4
    • /
    • 2003
  • This paper proposes a method of voltage control for three-phase multilevel H-bridge inverters with selective harmonic elimination (SHE) PWM The full-bridge configuration of H-bridge inverter cells enables voltage control with a fixed PWM pattern by means of phase shifting between the legs, which greatly simplifies the control while maintaining the harmonic elimination characteristics. The series combination of the cells in multilevel configuration can be exploited to further improve the hormonic elimination characteristics with proper phase shifting between the ceil volitage. A complexor-based control method is introduced to control the magnitude and phase angle of cell voltages that form three-phase multilevel output voltages. Simulation results show that the proposed method along with SHE PWM would provide satisfactory performance in spite of its simplicity.

  • PDF

Advanced aerostatic stability analysis of suspension bridges

  • Xiao, Ru-Cheng;Cheng, Jin
    • Wind and Structures
    • /
    • v.7 no.1
    • /
    • pp.55-70
    • /
    • 2004
  • Aerostatic instability of a suspension bridge may suddenly appears when the deformed shape of the structure produces an increase in the value of the three components of displacement-dependent wind loads distributed in the structure. This paper investigates the aerostatic stability of suspension bridges using an advanced nonlinear method based on the concept of limit point instability. Particular attention is devoted to aerostatic stability analysis of symmetrical suspension bridges. A long-span symmetrical suspension bridge (Hu Men Bridge) with a main span of 888 m is chosen for analysis. It is found that the initial configuration (symmetry or asymmetry) may affect the instability configuration of structure. A finite element software for the nonlinear aerostatic stability analysis of cable-supported bridges (NASAB) is presented and discussed. The aerostatic failure mechanism of suspension bridges is also explained by tracing aerostatic instability path.

Buffeting response control of a long span cable-stayed bridge during construction using semi-active tuned liquid column dampers

  • Shum, K.M.;Xu, Y.L.;Guo, W.H.
    • Wind and Structures
    • /
    • v.9 no.4
    • /
    • pp.271-296
    • /
    • 2006
  • The frequency of a traditional tuned liquid column damper (TLCD) depends solely on the length of liquid column, which imposes certain restrictions on its application to long span cable-stayed bridges during construction. The configuration of a cable-stayed bridge varies from different construction stages and so do its natural frequencies. It is thus difficult to apply TLCD with a fixed configuration to the bridge during construction or it is not economical to design a series of TLCD with different liquid lengths to suit for various construction stages. Semi-active tuned liquid column damper (SATLCD) with adaptive frequency tuning capacity is studied in this paper for buffeting response control of a long span cable-stayed bridge during construction. The frequency of SATLCD can be adjusted by active control of air pressures inside the air chamber at the two ends of the container. The performance of SATLCD for suppressing combined lateral and torsional vibration of a real long span cable-stayed bridge during construction stage is numerically investigated using a finite element-based approach. The finite element model of SATLCD is also developed and incorporated into the finite element model of the bridge for predicting buffeting response of the coupled SATLCD-bridge system in the time domain. The investigations show that with a fixed container configuration, the SATLCD with adaptive frequency tuning can effectively reduce buffeting response of the bridge during various construction stages.