• 제목/요약/키워드: bridge abutment

검색결과 201건 처리시간 0.03초

Fragility evaluation of integral abutment bridge including soil structure interaction effects

  • Sunil, J.C.;Atop, Lego;Anjan, Dutta
    • Earthquakes and Structures
    • /
    • 제20권2호
    • /
    • pp.201-213
    • /
    • 2021
  • Contrast to the conventional jointed bridge design, integral abutment bridges (IABs) offer some marked advantages like reduced maintenance and enhanced service life of the structure due to elimination of joints in the deck and monolithic construction practices. However, the force transfer mechanism during seismic and thermal movements is a topic of interest owing to rigid connection between superstructure and substructure (piers and abutments). This study attempts to model an existing IAB by including the abutment backfill interaction and soil-foundation interaction effects using Winkler foundation assumption to determine its seismic response. Keeping in view the significance of abutment behavior in an IAB, the probability of damage to the abutment is evaluated using fragility function. Incremental Dynamic Analysis (IDA) approach is used in this regard, wherein, nonlinear time history analyses are conducted on the numerical model using a selected suite of ground motions with increasing intensities until damage to abutment. It is concluded from the fragility analysis results that for a MCE level earthquake in the location of integral bridge, the probability of complete damage to the abutment is minimal.

옹벽 및 교대 신기술 특허 (New Patent Technology for Retaining Wall and Bridge Abutment)

  • 김경호;최정호;안정생;김낙겸
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2008년도 추계 학술발표회 제20권2호
    • /
    • pp.895-898
    • /
    • 2008
  • 본 연구는 최근 국내의 옹벽 및 교대의 신기술 특허 등록 동향을 조사하여 파악하며, 이들 신기술특허를 적절히 실제 옹벽 및 교대 공사에 적용하려는데 목적을 두고 있다. 본 연구에서 조사된 신기술옹벽으로는 PS강봉에 프리스트레스를 도입한 단면력 저감형 조립식 PC옹벽공법, Coupler-Tension 조립식 옹벽, 도로용 블록식 보강토옹벽, 균등침하를 유도할 수 있는 블록식 보강토옹벽이 있으며, 신기술 교대로는 시트파일을 이용한 교대의 시공공법, 일체식 복합교대 교량, 반 일체식 교대교량의 시공방법, 보강토 교대구조를 기술하였다.

  • PDF

측방유동 연약지반상 파일슬래브로 보강된 교대의 안정 (The Stability of Bridge Abutment Reinforced by Pile-slab on Soft Ground Undergoing Lateral Flow)

  • 홍원표;송영석
    • 한국지반공학회논문집
    • /
    • 제22권8호
    • /
    • pp.13-24
    • /
    • 2006
  • 연약지반상에서 교대 뒷채움으로 인하여 측방이동이 발생된 교대에 대하여 현장조사를 수행하였다. 교대측방이동의 원인을 분석한 결과, 설계시 교대기초말뚝을 수동말뚝으로 고려하지 않고, 연약지반에 대한 개량이 충분히 이루어지지 않은 것으로 조사되었다. 교대측방이동에 대한 대책공법으로 파일슬래브 공법이 제안되었다. 이 공법은 교대배면의 성토하중을 말뚝을 통하여 지지층으로 전달함으로써 연약지반의 측방유동을 효과적으로 방지할 수 있다. 연약지반상 파일슬래브공법으로 보강된 교대의 거동을 조사하기 위하여 현장계측을 수행하였다. 현장계측결과 파일슬래브공법은 교대뒷채움으로 인한 측방이동에 대하여 효과적으로 저항하는 것으로 나타났으며, 뒷채움으로 인한 성토하중은 말뚝을 통하여 지지층으로 전달됨을 알 수 있다. 이를 통하여 파일슬래브공법의 교대측방이동에 대한 억지효과를 확인할 수 있으며, 적용된 설계법의 합리성을 검증할 수 있다.

교량구조물의 측방이동 측정방법에 관한 연구 (The Measurement Method of Lateral Displacement in Bridge Abutment.)

  • 장용채
    • 한국항만학회지
    • /
    • 제14권1호
    • /
    • pp.115-124
    • /
    • 2000
  • This study is a suggest a measurement method of lateral displacement, which can be used to judge the stability of bridge abutment on soil undergoing lateral movement. The abutment of bridge on soft foundation makes lateral movement due to the settlement of back fill and lateral flow. To measure the displacement of such a abutment, there are a lot of indirect method for measurement such as survey of leveling or inclinometer gauge around the abutment. But all of them are not sufficient to confirm the ground behavior and measure the exact lateral behavior of structure. As making the structure and pile cooperatively by measuring the movement of lateral displacement, for measuring the abutment displacement precisely by using the inclinometer. In this work, we try to suggest efficient measuring method of abutment displacement and its application.

  • PDF

일체식교대 PSC빔 교량의 거동에 관한 매개변수 해석 (A Parametric Study on the Behavior of Integral Abutment rSC Beam Bridge)

  • 홍정희;정재호;유성근;박종면;윤순종
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2002년도 가을 학술발표회 논문집
    • /
    • pp.412-419
    • /
    • 2002
  • This paper presents a parametric study on the behavior of integral abutment PSC beam bridge. An integral abutment bridge is a simple span or multiple span continuous deck type bridge having the deck integral with the abutment wall. The rational structural model and design load combinations accounting for each construction stage are proposed. It can be used for defining the effect of earth pressure and temperature change in the design process including for determining maximum flexural responses. The bending moment at each response location due to the design load combination is investigated according to the change of flexural rigidity of piles and abutment height. The flexural responses of proposed model are computed for the cases of applying the Rankine passive earth pressure and the earth pressure based on the soil-structure interaction respectively, and the results are discussed.

  • PDF

교대의 측방변위와 대책공법에 대한 사례연구 (A case study on the lateral movement of bridge abutment foundation and repair methods)

  • 이병석;이재열
    • 한국산학기술학회논문지
    • /
    • 제13권3호
    • /
    • pp.1359-1369
    • /
    • 2012
  • 연약지반 상에 설치하는 교대의 말뚝기초는 편재하중으로 인하여 교대의 측방변위가 발생하는 경우 사례가 자주 있다. 본 연구에서는 측방변위가 발생된 국내 ${\bigcirc}{\bigcirc}$교량의 측방유동에 대하여 측방유동지수(F)에 의한 판정법, 측방유동판정수(I), 수정 I지수($M_I$)법에 의한 판정법과 유한요소법으로 판정하였다. 또한 계측관리를 통하여 측방유동의 진행성과 일련의 지반조사, 토질시험을 통하여 측방유동의 원인을 분석한 결과 설계시 예측하였던 압밀에 의한 전단 강도의 증가가 적어 전단강도의 부족으로 인하여 측방유동이 발생한 것으로 판단되었다. 보강방안으로는 압성토와 앵커보강을 병용하는 방안을 선정하였고 그 효용성을 유한요소법을 이용한 수치해석으로 확인하였다.

PS 강봉으로 일체화된 강합성 라멘교의 거더-교대 접합부의 거동에 관한 실험적 연구 (An Experimental Study on the Girder-Abutment Connection for the Steel-Concrete Composite Rigid-Frame Bridge Integrated with PS Bars)

  • 이상윤;안영수;오민호;정지승;양성돈
    • 콘크리트학회논문집
    • /
    • 제24권4호
    • /
    • pp.453-463
    • /
    • 2012
  • 강합성 라멘교는 교대 일체식 교량과 같이 유지보수의 주된 원인이 되는 신축이음 및 받침이 생략되어 유지관리 및 구조적인 장점을 얻을 수 있는 교량 형식이다. 통상적인 강합성 라멘교는 강재로 제작된 거더의 일부를 교대에 매립하는 형태로 거더와 교대가 일체화된다. 거더를 교대에 매립하는 형태의 거더-교대 접합부는 시공상세가 복잡하고 접합부의 상세에 따라 공사비가 증가하는 원인이 될 수 있다. 최근, 기존 강합성 라멘교의 거더-교대 접합부의 시공상세를 간략화하여 시공효율 향상시킨 PIC 거더교가 제안되었다. PIC 거더교는, 거더를 교대에 매립하는 상세 대신, PS 강봉을 이용하여 거더와 교대를 일체화하는 접합부 상세를 가지고 있다. 이 연구에서는 PIC 거더교의 거더-교대 접합부에 대한 거동을 검토하기 위하여 실물모형실험체를 이용한 정적재하실험을 수행하였다. 실험 결과, PS 강봉에 의해 체결되는 거더-교대 접합부는 충분한 내력을 확보하고 있는 것으로 확인되었다. 다만, 균열에 대한 사용성을 확보하기 위해서는 교대 상부에 발생하는 균열을 제어하기 위한 철근 배근이 필요할 것으로 판단된다.

비선형 교대운동이 교량구조물의 지진응답에 미치는 영향분석 (Effects of Nonlinear Motions due to Abutment-Soil Interaction upon Seismic Responses of Multi-Span Simply Supported Bridges)

  • 김상효;마호성;이상우;경규혁
    • 한국지진공학회논문집
    • /
    • 제6권6호
    • /
    • pp.17-24
    • /
    • 2002
  • 교대-인접토체사이의 상호작용으로 인한 비선형 교대거동이 교량구조물의 전체지진응답에 미치는 영향을 다양한 인자들을 고려할 수 있도록 개발된 이상화된 교량 해석모형을 이용하여 분석하였다. 교대의 비선형 운동은 교대의 강성저하를 반영하는 비선형 스프링으로 모형화하였으며, 비선형효과를 분석하기 위하여 현행 도로교 설계기준에서 제시하고 있는 일정강성을 적용한 선형스프링을 이용한 상대적인 선형모형과 결과를 비교하였다. 분석결과로부터 전체적인 교량구조물의 지진응답은 교대진동계의 모형화 방법 밑 인접한 토체의 조건에 따라 다양하게 나타나며, 교대진동계는 교량구조물의 지진응답에 중요한 영향을 미치는 것으로 분석되었다. 인접진동계간 최대상대거리는 비선형 모델을 적용한 경우가 상당히 증가하는 것으로 나타났으며, 특히 전체 교량구조물에서 낙교의 발생가능성이 가장 큰 위치에서 최대 30%, 정도까지도 증가하는 것으로 분석되었다. 또한 촘촘한 모래를 갖는 토체조건 하에서는 경간수가 증가할수록 교대의 비선형 거동에 따른 영향은 증가하는 것으로 평가되었다. 따라서 교량구조물의 지진거동 분석시 교대의 거동특성을 보다 실제적으로 반영하기 위해서는 교대의 비선형거동이 합리적으로 고려되어야 할 것으로 판단된다.

Behavior of integral abutment bridge with partially protruded piles

  • Park, Min-Cheol;Nam, Moon S.
    • Geomechanics and Engineering
    • /
    • 제14권6호
    • /
    • pp.601-614
    • /
    • 2018
  • This study presents structural and parametric analyses on the behavior of an integrated and pile-bent abutment with mechanically stabilized earth wall (IPM) bridge. The IPM bridge is an integral abutment bridge (IAB) with partially protruded piles, which excludes earth pressure by means of a mechanically stabilized earth wall developed by the authors. The results of the analysis indicate that the IPM bridge, as any other IAB, is influenced to a large extent by temperature and time-dependent loads. When these loads are applied, the stress on a pile in the IPM bridge decreases as the displacement of the pile top increases, because the piles protrude from the ground surface and no soil reaction is generated on the protruded pile. Because the length of an IAB is restricted by the forces acting on its piles, the IPM bridge is an effective alternative to extend its length.