• Title/Summary/Keyword: bridge abutment

Search Result 201, Processing Time 0.021 seconds

A Study on Influence of Constructed Bridge Abutment in Landfill Slope under Laterally Displacing (측방유동 발생 시 성토사면에 시공된 교대의 영향에 대한 연구)

  • Lee, Hangyu;Hong, Jongouk;Chun, Byungsik
    • Journal of the Korean GEO-environmental Society
    • /
    • v.14 no.12
    • /
    • pp.31-41
    • /
    • 2013
  • The damage caused by lateral movement occurs frequently on site where abutment or retaining wall was built on soft ground along with embankment behind and the study on stability of abutment against lateral movement has been mostly focused on soft ground. However lateral movement occurs not only on soft ground but also on embankment slope which causes the impact on structure. The bridges built in Korea are mostly on mountainous area than soft ground. This study is intended to analyze the ground behavior resulting from lateral movement using finite element analysis method to the section as well as propose the basic data for abutment design on embankment slope through the analysis of the outcome of reinforcement method. As a result, when it comes to the reinforcement with soil surcharge and stabilized pile in slope, lateral movement was reduced by 4~30% and displacement on bearing shoe on abutment was reduced by 2~13%. On the contrary, when reinforced with EPS, lateral float was reduced by 97% and maximum horizontal displacement of bearing shoe on abutment was reduced by 95%. Thus, it's necessary to identify the design technique which is applicable to domestic condition through additional tests and more reliable study using numerical analysis and comparing the measured values shall follow.

Simulation of vibrations of Ting Kau Bridge due to vehicular loading from measurements

  • Au, F.T.K.;Lou, P.;Li, J.;Jiang, R.J.;Zhang, J.;Leung, C.C.Y.;Lee, P.K.K.;Lee, J.H.;Wong, K.Y.;Chan, H.Y.
    • Structural Engineering and Mechanics
    • /
    • v.40 no.4
    • /
    • pp.471-488
    • /
    • 2011
  • The Ting Kau Bridge in Hong Kong is a cable-stayed bridge comprising two main spans and two side spans. The bridge deck is supported by three towers, an end pier and an abutment. Each of the three towers consists of a single reinforced concrete mast strengthened by transverse cables and struts. The bridge deck is supported by four inclined planes of cables emanating from anchorages at the tower tops. In view of the heavy traffic on the bridge, and threats from typhoons and earthquakes originated in areas nearby, the dynamic behaviour of long-span cable-supported bridges in the region is always an important consideration in their design. Baseline finite element models of various levels of sophistication have been built not only to match the bridge geometry and cable forces specified on the as-constructed drawings but also to be calibrated using the vibration measurement data captured by the Wind and Structural Health Monitoring System. This paper further describes the analysis of axle loading data, as well as the generation of random axle loads and simulation of vibrations of the bridge using the finite element models. Various factors affecting the vehicular loading on the bridge will also be examined.

A Study on the Repair Method for Performance Degradation Cause of Korean Arch Bridge -Focused on the Seonamsa Seungseonggyo, Songgwangsa Geukrockgyo- (홍예교 성능저하 원인에 따른 보수방안 고찰 - 선암사 승선교·송광사 극락교를 중심으로 -)

  • Kim, Jeong-Eon;Cheon, Deuk-Youm
    • Journal of architectural history
    • /
    • v.23 no.1
    • /
    • pp.7-19
    • /
    • 2014
  • This study considers the proper repair techniques by examining the most representative repair cases of the Korean arch bridges and proposes the constructional manual which can apply similar occasions. The cases are Seonamsa Seungseongyo and Songgwangsa Geukrockgyo where this researcher had taken part in the repair works. This Study proposes the maintenance construction manual about the performance degradation drew by performance degradation of the both Korean arch bridges in the maintenance process. First, arch bridge maintenance should be carried out in the dry season, when water is impermeable in the bottom surface of the bridge. Moreover, risk factors of the maintenance should be excluded to secure the water vally flow, the bypass and the temporary bridge. Second, prior to repair, it has to precede (1)3D shooting (2)formal examination (3)structure safety test (4)geological and lithic surveys (5)arch curvature establishment and makeshift frame settlement before transformation (6)relationship expert comments. Third, if the baduk and the foundation stones are inevitable to replace due to performance degradation on the foundation, it should use the high quality stones and secure greater stress by extending the standard range. The foundation on irregular rock needs to be flattened and underside on the replaced materials require Grengyijil to deliver the equal loads. Fourth, In the process of dismantling the stones of the arched bridge, it could make heavy weathering degree and not reuse the materials. Charge should converge the expert advices to choose the reuseable, the conservate and the alternative materials, and increase the reutilization of the raw materials by preservation and reinforcement treatments. Fifth, the side wall should be repaired by the rubble work technique which is not able to pile compost satiety, so it must use long depth of masonary stones for reinforcement. It is considered to reinforce the stone wall in shore as much as possible and protect the abutment and the side wall on the upstream for the arch bridge maintenance works.

A SUTDY ABOUT THE SHAPE OF THE FRAMEWORK OF THE FIXED BONE ANCHORED BRIDGE USING DENIAL IMPLANTS (임프란트를 이용한 고정성 계속가공의치의 FRAMEWORK 형태에 관한 연구)

  • Kim, Te-Gyun;Lee, Young-Soo;Yoo, Kwang-Hee
    • The Journal of Korean Academy of Prosthodontics
    • /
    • v.36 no.1
    • /
    • pp.104-119
    • /
    • 1998
  • The purpose of this study was pertinent design of the framework of the fixed bone anchored bridge using implants in the edentulous mandible through analysis of stress distribution by the three dimensional finite element analysis method. The results were as follows: 1. The L-shaped framework was favorable in restoring the edentulous mandible by implants and fixed bone anchored bridge. 2. The structure of the framework should be designed to endure the occlusal load because of stress concentration at the most distal abutment of the framework. 3. The stress at the distal implant where cantilever starts was twice as much as that of other portions. 4. Compressive stress was generated on the framework of the mesial side of the distal implant and extrusive force was induced to the mesially positioned implants. 5. The height of vertical plate was high as possible as can be to distribute stresses concentrating bucco-lingually and labio-lingually in the framework between abutments, 6. Reinforcement of the horizontal plate thickness was needed because stress was loaded more on the horizontal plate than on the vertical plate of the framework. 7. Lengthening of the vertical plate can compensate for any limitations in horizontal plate width.

  • PDF

Bearing Damage Analysis of Bridges Considering the Probabilistic Characteristics of Earthquake and Structural Properties (지진하중 및 교량구조물의 확률적 특성을 고려한 받침손상위험도 분석)

  • 김상효;마호성;이상우;김철환
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2002.10a
    • /
    • pp.346-353
    • /
    • 2002
  • The risk of bearing failure is evaluated through the seismic response analysis of a bridge considering the probabilistic characteristics of structural properties such as the mass of superstructure, the stiffness of pier, and the translational and rotational stiffness of the foundation as well as seismic loadings during the bridge service lift. The effect of pounding between adjacent vibration units on the risk of bearing failure is also investigated. The probabilistic characteristics of structural properties are obtained by the Monte Carlo simulations based on the probabilistic characteristics of basic random variables included in the structural properties. From the simulation results, the failure probability of fixed bearings attached on the abutment is found to be much higher than those placed on the piers. It is also found that the pounding effect significantly increases the failure probability of bearings. In the simply supported bridges, the risk of bearing failure increases as the number of bridge spans increase. Therefore, the failure probability of fixed bearing due to the effects of pounding phenomena and the number of bridge spans should be considered in the seismic desist of bearings.

  • PDF

Case Analysis of Abutment Displacement and Pavement settlement (교대변위 및 도로침하에 대한 사례분석)

  • 박찬호;김수일
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1994.03a
    • /
    • pp.19-30
    • /
    • 1994
  • This paper reports a case study of aboutment displacement and pavement settlement observed at the construction site for highway bridges. The emphasis was on quantifying the horizontal deflections of about and pavement settlement on the backfill surface. It is shown that in soft clay, bridge aboutments on pile foundations are subjected to lateral earth pressures due to lateral soil movement. Based on the results analyzed, the earth pressure was predicted by deflection shape of piles based on the results of a numerical analysis and an analytical study. Also, the long term settlement of soil below pavement was estimated.

  • PDF

The Importance of Geotechnical Investigation Instructed by Failure (실패사례로 본 지반조사의 중요성)

  • Jung, Gyung-Ja;Lee, Doo-Haeng
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.761-774
    • /
    • 2009
  • To address the importance of geotechnical investigation, failure cases are taken up for consideration. One of them awaken this country to the importance of exact geotechnical investigation at the cost of many lives. Other failures were also occurred as the result of insufficient geotechnical investigation or missing some facts given by geotechnical investigation. A case which shows the unpredicted and unaccustomed settlement at bridge abutment introduced to emphasize the importance of exploring unknown nature of local soils.

  • PDF

A STUDY ON THE STRESS DISTRIBUTION OF CANTILEVER BRIDGE UNDER MAXIMUM BITE FORCE AND FUNCTIONAL BITE FORCE USING THREE DIMENSIONAL FINITE ELEMENT METHOD (최대교합 및 기능교합시 하악구치부 연장가공의치에 발생하는 응력에 대한 삼차원 유한요소법적 연구)

  • Park Chang-Keun;Lee Sun-Hyung;Chung Hun-Young;Yang Jae-Ho
    • The Journal of Korean Academy of Prosthodontics
    • /
    • v.32 no.4
    • /
    • pp.484-514
    • /
    • 1994
  • Cantilever bridge is widely used by mny clinicians, but its worst mechanical character, so called Class I lever system, makes dentists hesitate to restore the missing tooth with it. Therefore it is important to study stress of the cantilever bridge. In this study, two models of cantilever bridges that restores the missing mandibular second molar with two abutment teeth were constructed. One model was a type of cantilever bridge supported by a normal alveolar bone, the other one was supported by an alveolar bone resorbed to its 1/3 of root length. Maximum bite force(550N) and funtional maximum bite force(300N) were vertically applied to the distal end of the pontic, distal 1/3, and distal half of the pontic. And each force was also applied to centric occlusal contacts as a distributed force. Total 16 loading cases were compared and analyzed with 3-dimensional finite element method. The results were as follows: 1. The stress was concentrated on the joint of the pontic and the retainer, grooves, and distal cervical margin of the posterior retainer. 2. In case of maximum bite force(550N) at the end of the pontic, the risk of fracture at the joint of the pontic and the retainer was high. 3. In case of distributed force in centric occlusion and functional maximum bite force(300N), the stresses were less than the yield strength of the type VI gold for any loading cases. 4. In case of alveolar bone resorption, the occlusal force to the cantilever pontic caused more stress on the root apex and less stress on the alveolar crest region of the distal surface of the posterior abutment. 5. In case of alveolar bone resorption, the displacement was larger than that of normal alveolar bone in all loading cases.

  • PDF

Parametric seismic evaluation of highway overpass bridges in moderate seismic areas

  • Simon, Jozsef;Vigh, Gergely L.
    • Earthquakes and Structures
    • /
    • v.12 no.3
    • /
    • pp.375-388
    • /
    • 2017
  • Prior to modern seismic provisions, several bridges were not designed for seismic actions in moderate seismic areas. Precast multi-girder and slab bridges are typical highway overpass structures; they have a significant contribution to national bridge stocks. Since the seismic behavior is questionable, a preliminary parametric study is conducted to determine critical configurations and components. The results indicate that the behavior of the abutments, backfill soil, superstructure and foundation is normally satisfactory; however, the superstructure-abutment joints are critical for both single- and multi-span bridges, while the piers are also critical for longer multi-span configurations. The parametric results provide a solid basis both for detailed seismic assessment and development of design concepts of newly built structures in moderate seismic zones.

Displacement Behavior of Tunnel under Bridge Abutment due to Supporting Systems (교량기초 하부에 위치한 터널의 지보방법에 따른 변위거동)

  • Yoo, Nam-Jae;Park, Byung-Soo;Jeong, Gil-Soo;Kim, Seung-Ryul
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.10a
    • /
    • pp.613-620
    • /
    • 2005
  • This research is experimental paper to prepare the structural safety of the upper bridge for support type on tunnel and the effect of settlement. Unit weight test and uni-axial compression test have been performed to simulate the physical property of foundation on the tunnel. Tunnel model of slip form type for centrifuge model has been developed to performed the tunnel excavation while field stress is activated. And the support type of tunnel such as umbrella arch method and large diameter steel pipe reinforce method has been tested for the centrifuge model. After the analysis of experiment, results show that internal displacement of large diameter steel pipe reinforce method is smaller than that of the umbrella arch method.

  • PDF