Engineering Characteristics of Cement Milk for Bored Piles (매입말뚝공법의 충전재료로 사용되는 시멘트밀크의 공학적 특성)

  • Do, Jong-Nam;Nam, Moon-Seok;Shim, Jae-Won;Park, Young-Ho;Lee, Seung-Jun
    • Journal of the Korean Geotechnical Society
    • /
    • v.31 no.12
    • /
    • pp.29-43
    • /
    • 2015
  • In this study, engineering property tests were conducted for cement milk used as a filling materials in the bored piles method. For this purpose, various water/cement ratio specimens were produced on the basis of standard specimen specified in highway corporation specifications. The unconfined compressive strength, point load strength, elasticity modulus, poisson's ratio test was performed according to the age. As a test result, injection height for productions of cement milk specimens was defined ratios. Correlation coefficient K of the unconfined compressive strength and point load strength were $K_7=4.55{\sim}13.65$ in age 7 days, and $K_{28}=5.28{\sim}16.84$ in age 28 days. When water / cement ratio is 65-150%, the elastic modulus and Poisson's ratio significantly increased and decreased regardless of age. In addition, the formulae were proposed for unconfined compressive strength, point load strength, a correlation coefficient of unconfined compressive strength, point load strength, elastic modulus, and poisson's ratio for each age.

Numerical analysis on stability of express railway tunnel portal

  • Zhou, Xiaojun;Hu, Hongyun;Jiang, Bo;Zhou, Yuefeng;Zhu, Yong
    • Structural Engineering and Mechanics
    • /
    • v.57 no.1
    • /
    • pp.1-20
    • /
    • 2016
  • On the basis of the geological conditions of high and steep mountainous slope on which an exit portal of an express railway tunnel with a bridge-tunnel combination is to be built, the composite structure of the exit portal with a bridge abutment of the bridge-tunnel combination is presented and the stability of the slope on which the express railway portal is to be built is analyzed using three dimensional (3D) numerical simulation in the paper. Comparison of the practicability for the reinforcement of slope with in-situ bored piles and diaphragm walls are performed so as to enhance the stability of the high and steep slope. The safety factor of the slope due to rockmass excavation both inside the exit portal and beneath the bridge abutment of the bridge-tunnel combination has been also derived using strength reduction technique. The obtained results show that post tunnel portal is a preferred structure to fit high and steep slope, and the surrounding rock around the exit portal of the tunnel on the high and steep mountainous slope remains stable when rockmass is excavated both from the inside of the exit portal and underneath the bridge abutment after the slope is reinforced with both bored piles and diaphragm walls. The stability of the high and steep slope is principally dominated by the shear stress state of the rockmass at the toe of the slope; the procedure of excavating rockmass in the foundation pit of the bridge abutment does not obviously affect the slope stability. In-situ bored piles are more effective in controlling the deformation of the abutment foundation pit in comparison with diaphragm walls and are used as a preferred retaining structure to uphold the stability of slope in respect of the lesser time, easier procedure and lower cost in the construction of the exit portal with bridge-tunnel combination on the high and steep mountainous slope. The results obtained from the numerical analysis in the paper can be used to guide the structural design and construction of express railway tunnel portal with bridge-tunnel combination on high and abrupt mountainous slope under similar situations.

KEC Construction and Design of Auger-drilled Piles (한국도로공사의 매입말뚝 공법의 설계와 시공)

  • Park, Young-Ho;Nam, Moon-S.;Kim, Nak-Young;Yook, Jeong-Hoon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.521-532
    • /
    • 2008
  • The SIP method developed by low noise-vibration from Japan is appropriate to the construction at urban area. However, this method has been misused as a pre-driiled driven pile method in Korea. Hence, Korea Expressway Corporation proposed 'Design & Construction Guideline for the SIP Method' following the original concept of the SIP method at 2004 and 2006. Also construction guideline of another auger-drilled piles were introduced.

  • PDF

Characteristics of Load-Settlement Behaviour for Embeded Piles Using Load-Transfer Mechanism (하중전이기법을 이용한 매입말뚝의 하중-침하 거동특성)

  • Oh, Se Wook
    • Journal of the Korean GEO-environmental Society
    • /
    • v.2 no.4
    • /
    • pp.51-61
    • /
    • 2001
  • A series of model tests and analyses by load transfer function were performed to study load-settlement behaviour with relative compaction ratio of soil and embeded depth of pile. In the model tests, embeded depth ratio(L/D) of pile were installed 15, 20, 25 and relative compaction of soil(RC) is 85%, 95% and then cement were injected at around perimeter of pile. For analysis of embedded pile, the paper were compared results of model tests with analysis results by Vijayvergiya model and Castelli model, Gwizdala model of elastic plasticity-perfect plastic model and then the fitness load transfer mechanism was proposed to predict load-settlement behaviour of embeded pile. The analysis results of predicted bearing capacity by load transfer function, ultimate bearing capacity of embeded pile were approached to measured value and behaviour of initial load-settlement curve were estimated that load transfer function by Castelli were similar to measured value. The result of axial load analysis of bored pile shows that skin friction estimated by load transfer mechanism is investigated more a little than that of measured values.

  • PDF

Numerical Analyses of O-Cell Load Test on Pile (양방향말뚝재하시험의 수치해석)

  • Joo, Yong-Sun;Kim, Nak-Kyoung;Kim, Woong-Jin;Park, Jong-Sik
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.748-753
    • /
    • 2008
  • Bi-directional load test is one of O-cell tests. The O-cell test is a system which may be used for performing static load tests on cast in situ reinforced concrete bored piles. The technique was devised and developed by Osterberg of Northwestern University(USA) and has been in use around the world. The principle of the method is that an O-cell is installed in a cast in situ bored pile base. Once the pile concrete reaches its design strength the cell is connected to an hydraulic pump and pressured. Pressurisation causes the cell to expand, developing an upward force on the section of pile above the cell loads, pile movements and strains within the pile then enable the capacity of the pile and its load settlement curves to be ascertained. Bi-directional load tests using O-cell are now becoming common practice around the world, particularly where the loads to be applied are high or where it is not convenient to perform top-down loading tests. In the study, calculate ultimate capacity of bi-directional load test using FEM and beam on elasto-plastic foundation theory.

  • PDF

Applicability of Solidified Soil as a Filling Materials in the Drilling of the Bored-precast Pile (매입말뚝 시공시 현장토를 활용한 고화처리 충전재의 현장 적용성 평가)

  • Kim, Khi-Woong;Park, Jeong-Jun;Han, Byung-Kwon
    • Journal of the Korean Geosynthetics Society
    • /
    • v.13 no.2
    • /
    • pp.21-29
    • /
    • 2014
  • The use of filling material based on cement paste is inefficient at field construction because it needs a lot of the charging mass. In addition, it has environmental problem according to the large amount of cement use because its strength is also larger than criterion. The excavated soil with stabilizer can be used as the filling materials when the bored pile is constructed. Therefore, this paper describes field application of solidified soil for economical efficiency and environment-friendly. The static axial load tests and the load-transfer measurements were performed to examine the axial resistant behavior of the piles. As results, the flowability, segregation and bleeding, and bond strength of filling materials was a good performance than that of the existing cement paste. But the skin friction of pile by PDA was slightly decreased than that of the existing cement paste. However, as pile filling materials, and in terms of economics and environment, the applicability of filling material is considered very effective.

A Comparative Study on the Bearing Capacity of Dynamic Load Test and Static Load Test of PHC Bored Pile (PHC 매입말뚝의 동재하시험과 정재하시험의 지지력 비교·분석 연구)

  • Park, Jongbae
    • Journal of the Korean GEO-environmental Society
    • /
    • v.18 no.9
    • /
    • pp.19-31
    • /
    • 2017
  • In case of USA, the drilled shaft and the driven pile in the field showed a good correlation in the analysis of the bearing capacity between the dynamic load test and the static load test. However, in Korea, we mainly install the bored pile, which is not widely used overseas and we tried to confirm the reliability of the dynamic load test on the bored pile, because many people questioned the reliability of it. In this study, load tests were carried out on PHC bored piles in LH field (Cheonan, Incheon, Uijeongbu), and the bearing capacity of the dynamic load test (EOID 7times, Restrike 7times) and the static load test (7times) were compared and analyzed. As a result, the average of the bearing capacity of the static load test was 27% higher than that of the dynamic load test (reliability : 0.73, coefficient of variation : 0.3). And the average of the bearing capacity of the static load test (Davisson) was 27% higher than that of the bearing capacity of the dynamic load test (Davisson) (reliability : 0.73, coefficient of variation : 0.2). To reduce the difference between the bearing capacity of the dynamic load test and the static load test, we proposed modified bearing capacity of dynamic load test (base bearing capacity of EOID + skin frictional force of restrike) and difference between the bearing capacities was reduced to 9% (reliability : 0.91, coefficient of variation : 0.2). And the coefficient of variation was reduced to 0.2 and the consistency of analysis increased.

Shaft resistance of bored cast-in-place concrete piles in oil sand - Case study

  • Barr, L.;Wong, R.C.K.
    • Geomechanics and Engineering
    • /
    • v.5 no.2
    • /
    • pp.119-142
    • /
    • 2013
  • Pile load tests using Osterberg cells (O-cell) were conducted on cast-in-place concrete piles founded in oil sand fill and in situ oil sand at an industrial plant site in Fort McMurray, Alberta, Canada. Interpreted pile test results show that very high pile shaft resistance (with the Bjerrum-Burland or Beta coefficient of 2.5-4.5) against oil sand could be mobilized at small relative displacements of 2-3% of shaft diameter. Finite element simulations based on linear elastic and elasto-plastic models for oil sand materials were used to analyze the pile load test measurements. Two constitutive models yield comparable top-down load versus pile head displacement curves, but very different behaviour in mobilization of pile shaft and end bearing resistances. The elasto-plastic model produces more consistent matching in both pile shaft and end bearing resistances whereas the linear elastic under- and over-predicts the shaft and end bearing resistances, respectively. The mobilization of high shaft resistance in oil sand under pile load is attributed to the very dense and interlocked structure of oil sand which results in high matrix stiffness, high friction angle, and high shear dilation.

Bearing Capacity of Mid & Small dia Hellical Pile (중·소구경 헬리컬 파일의 지지력 특성)

  • Park, Jong-Bae;Park, Yong-Boo;Kwon, Young-Hwan
    • Land and Housing Review
    • /
    • v.11 no.2
    • /
    • pp.75-86
    • /
    • 2020
  • As the urban regeneration project and the old housing maintenance project are actively progressing in Korea, small-scale building construction is being carried out in downtown areas. Small buildings in the downtown area are constructed on about 4 to 10 floors, and since they are carried out in small units in residential areas, it is difficult to enter large equipment to construct existing piles, and it is more vulnerable to complaints about noise and vibration. in this study, helical piles suitable for urban areas or small sites where it is difficult to enter large equipment, such as noise and vibration. Reliability analysis was performed on the results of the static load tests and dynamic load tests conducted at the LH site and the bearing capacity calculated by the hydrostatic method and the empirical formula (N value). As a result of comparing and analyzing the design formula and the results of static load test and dynamic load tests, the correlation between the design formula of the bored pile (Road bridge design standard) formula using N value and the design formula by the modified Davisson method frequently used by method commonly European helical file practitioners.

A Case Study on Application of O-cell Test in Oversea (양방향재하시험의 국외 적용 사례)

  • Lee, Won-Je;Molnit, Thomas
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.10a
    • /
    • pp.593-602
    • /
    • 2006
  • 대구경 현장타설말뚝에 대한 시험하중의 증가와 함께 적용이 활성화되고 있는 오스터버그 셀(Osterberg cell)방식이 적용된 국외의 4 개소 시험결과에 대하여 소개하였다. 사례연구의 대상이 된 4 개소 시험말뚝은 일반적인 시험보다는 결과상의 특징이 있어 현재 및 향후 동일한 시험방법이 적용될 경우 고려될 수 있는 내용을 중심으로 기술하였다. 이들 말뚝시험에서는 가장 전형적으로 지지력의 균형이 이루어져 말뚝의 극한현상이 발생되지 않아 설계하중을 충분히 확인한 경우뿐 아니라 선단지지력이 부족하여 선단 그라우팅 후 재시험을 한 경우, O-cell을 말뚝의 선단에 가장 근접하여 설치 한 후 시험한 경우, 그리고 다단면(multi-level test)시험이 수행되었던 예 등을 살펴보았다.

  • PDF