• Title/Summary/Keyword: bidding and selection system

Search Result 13, Processing Time 0.027 seconds

A Study on Performance Analyses of Korea's Bidding and Contract Systems for Public Construction Projects

  • Beak, Seung-Ho;Kang, Tai-Kyung;Park, Wonyoung;Lee, Yoo-Sub
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.3
    • /
    • pp.18-28
    • /
    • 2015
  • Bidding and contract systems are used for public construction projects to select contractors following fair competition principles and to execute national budgets effectively. Many challenges have arisen due to a lack of transparency and fairness and because bidding practices have been luck-based. Few comprehensive or comparative analyses have been conducted on the performance and limitations of bidding and contract systems, and empirical analyses designed to improve policies on and the practice of such systems are lacking. This study empirically analyzed current bidding and contract systems to seek ways of improving them. The study proposes several alternatives to resolve the problems with and irrationalities of the current system: 1) improving bidding and selection systems by changing them from a luck-based price competition into a technical merit- and value-based competition; 2) improving the assessment criteria to meet the current market level of bid and winning prices; 3) adjusting contractual responsibilities and sharing structures to meet the current trend; and 4) strengthening the competitiveness and expanding the social responsibility-based procurement systems of construction companies.

Improvement Strategy & Current Bidding Situation on Apartment Management of Landscape Architecture (공동주택 조경관리 입찰 실태와 개선방안)

  • Hong, Jong-Hyun;Park, Hyun-Bin;Yoon, Jong-Myeone;Kim, Dong-Pil
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.48 no.4
    • /
    • pp.41-54
    • /
    • 2020
  • This study was conducted to provide basic data for a transparent and fair bidding system by identifying problems and suggesting improvement measures through an analysis of the bidding status for construction projects and service-related landscaping of multi-family housing. To this end, we used the data from the "Multi-Family Housing Management Information System (K-apt)" that provides the history of apartment maintenance, bidding information, and the electronic bidding system to examine the winning bid status and amount, along with the size and trends of the winning bids by year, and the results of the selection of operators by construction type. As a result, it was found that out of the total number of successful bids (36,831), 4.4% (16,631) were in the landscaping business, and the average winning bid value was found to be about 24 million won. According to the data, 73% of the landscaping cases were valued between 3 million won and 30 million won, and 58.6% of the cases were in the field of "pest prevention and maintenance". 36% of the total number of bids were awarded from February to April, with "general competitive bidding" accounting for 59.8% of the bidding methods. As for the method of selecting the winning bidder, 55% adopted the "lowest bid" and "electronic bidding method," and 45% adopted the "qualification screening system" and "direct bidding method." As an improvement to the problems derived from the bidding status data, the following are recommended: First, the exception clause to the current 'electronic bidding method' application regulations must be minimized to activate the electronic bidding method so that a fair bidding system can be operated. Second, landscaping management standards for green area environmental quality of multi-family housing must be prepared. Third, the provisions for preparing design books, such as detailed statements and drawings before the bidding announcement, and calculating the basic amount shall be prepared so that fair bidding can be made by specifying the details of the project concretely and objectively must be made. Fourth, for various bidding conditions in the 'business operator selection guidelines', detailed guidelines for each condition, not the selection, need to be prepared to maintain fairness and consistency. These measures are believed to beuseful in the fair selection of landscaping operators for multi-family housing projects and to prepare objective and reasonable standards for the maintenance of landscaping facilities and a green environment.

A study on evaluation element of technical proposal tendering for apartment remodeling business

  • Park, Min-Young;Lim, Sooyoung
    • KIEAE Journal
    • /
    • v.15 no.1
    • /
    • pp.61-68
    • /
    • 2015
  • Method of remodeling builder selection for remodeling is competitive bidding. also metropolitan city, megalopolis city, city more than 50million have to do basic plan for remodeling before establishment of a housing cooperative. Purpose of basic plan is improvement of living conditions & the Quality of Life for resident. Technical Proposal Tendering in spite of being the a reasonable bidding system, institutional part, appraisal standard and the item part, consider procedure pard is performed in a similar way to the existing bidding system. so, technical proposal tendering is appropriate for future Method of builder selection of remodeling. therefore, the study purpose is a evaluation element of technical proposal tendering for apartment remodeling business The methods of study is understanding concept through review of precedent literature. Next, case investigation through Analysis of focal points. Lastly, evaluation element deduction of technical proposal tendering for apartment remodeling business through specialist conversation. As a result, Alteration of a right & move management is added to evaluation element's professional field. And detail item is alteration of a right & move management.

Analysis of the Influence of Design Score and Price Score for Design Build Bidding (설계시공일괄입찰에서 설계점수와 가격점수의 영향력 분석)

  • Lee, Jinhak;Woo, Sungkwon;Lee, Siwook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.5
    • /
    • pp.44-51
    • /
    • 2023
  • Selecting appropriate bidding system in construction projects considering the characteristic of project can be a make-or-break element, so the understanding for bidding system of public construction projects is ever more important from the perspective of both the owner and the contractor. The design-build bidding is commonly referred to as turnkey in Korea, and is a bidding method that is often applied to large public construction projects because it allows new technologies to be applied to the design and facilitates risk management for the owner. In this bidding method, there are only two factors (design score and price score) that affect the selection of the winning bidder, so it is important to understand the influence of each factor, but there is little research on the subject. This study aims to provide a basis for establishing bidding strategies for understanding the influence between design score and price score by analyzing various design-build bidding data of public construction projects. The results of the study show that design score is the factor that has more influence on the ranking of bidders in all three weighted evaluation methods: design-emphasized, price-emphasized, and equalized evaluation. In addition, we found that the correlation between design and price scores was not significant due to the unique bid evaluation structure in Korea.

Improvement of Turn-key Contract System through the Analysis of Present Ordering Condition in Civil Engineering Projects (토목공사 수주현황 분석을 통한 턴키${\cdot}$대안입찰제도의 문제점 및 개선방안 연구)

  • Lee Yang-Kyoo;Kang Leen-Seok;Park Jong-Hyuk;Jeon Seong-Chul
    • Journal of the Korean Society for Railway
    • /
    • v.8 no.5
    • /
    • pp.460-469
    • /
    • 2005
  • Turnkey contract system is an effective ordering system for the ordering organizations that technical engineers are insufficient for their construction projects. It is possible to reduce project duration and to improve project quality in an integrated contract system between design and construction. However, owners can have a difficulty caused from unitary responsibility system. This study analyzes present situation and problems of turnkey contract system including railway projects. The result includes various methods for improving the system based on the analysis of bid price and selection procedure.

A Study on a Strategy to Enhance the Transparency of the Bidding and Contract System for Public Construction Projects (공공건설사업 입찰 및 계약제도측면의 투명성 확보 전략에 관한 연구)

  • Cho, Young-Jun;Kim, Jong-Ouk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.6
    • /
    • pp.109-116
    • /
    • 2010
  • A construction project consists of many types of contracts. In the process of selecting the successful contractor after bidding, there will inevitably be fierce competition, which may lead to corruption or bribery. Even after signing the contract, during the period of settling the amount of the contract, bribery could occur. Such corruption could harm the development of the construction industry. It is, therefore, necessary to establish a strategy to prevent corruption by strengthening the transparency of the bidding process. In this study, to prevent corruption in the construction industry, a new service is proposed in which the successful bidder is selected by a professional third party, and the introduction of diverse delivery systems for construction projects and the invigoration of alternative methods of settling disputes are also proposed in this study.

The Problems and Improvement Methods of Apartment Management Company Selection System (공동주택 관리업체 선정방식의 문제점과 개선방안)

  • Chun, Hyeon-Sook
    • Journal of the Korean housing association
    • /
    • v.23 no.2
    • /
    • pp.89-98
    • /
    • 2012
  • As the construction of multi-family housings, especially apartments, has been increased since 1970s, the multi-family housing becomes one of the main housing types in Korea. With the increase of multi-family housings, managing them becomes an important issue. Since 2010, the government has made a lowest price award system by a competitive bid compulsory to promote the development of housing management systems. Although competitive bids were implemented, the maintenance company was finally selected by the price without any other consideration. Consequently, the quality of management service was not enhanced. The purpose of this study is to suggest the improvement scheme of multi-family housing management system. In this study, the bidding data of "K-apt", the bidding method and the successful tendered price are analyzed. The results of analyzing bidding materials, the proportion of applying a lowest price system was 67.7%. Also many diverse ways to select the best management company were used, but most of these ways were violate the law and guidelines of Ministry of Land, Transport and Maritime Affairs. It meant that the lowest price award system was not implemented by strict standards and didn't correspond with the needs of residents of apartment. This condition made the housing maintenance quality low and deteriorated the management industry development. To enhance this condition, a new standard to select the management company, which are included contents of quality of managing quality, management expenses and companies' soundness, is necessary.

A Project Delivery System Selection Model for Large Public Construction Projects (대형 공공공사의 적정 발주방식 선정모델)

  • Hyun Chang-Taek;Seo Yong-Chil;Lee In-Keun;Ryu Kil-Sang;Lee Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.2 s.2
    • /
    • pp.71-80
    • /
    • 2000
  • Project delivery systems determine the relationship, responsibility, authority and the scope of works of those involved in project, hence, optimum project delivery system should be selected to so that construction project would be executed successfully, Until now, the traditional design-bid-build mainly has been used for public projects, but the government is making efforts actively to introduce other methods such as design-build, alternative bidding by its policy. However, delivery systems should be determined through considering physical projects characteristics, owner's goals, external factors, etc, rather than government' policy. Therefore, the purpose of this research is to propose objective delivery system selection criteria and delivery system selection model, which help owners to select the suitable delivery system through quantitative and reasonable manner.

  • PDF

A Critical Review on Japan's Offshore Wind Bidding System (일본의 해상풍력 입찰제도에 관한 비판적 고찰)

  • Son Bumsuk
    • New & Renewable Energy
    • /
    • v.20 no.1
    • /
    • pp.70-77
    • /
    • 2024
  • This study examines the issues regarding the selection competition process of offshore wind power operators conducted in Japan in 2020. It also explores the implications of the findings on the legal system of Korea for the introduction of offshore wind power in the future. Drawing on Japan's example, Korea must reconsider the importance of the price aspect when introducing offshore wind power and adopt policies that prioritize balanced industrial development and focus on regional and domestic economic ripple effects.

An Intelligent Agent Based Supply Chain Operation Architecture under Adaptive Relationship between Multiple Suppliers and Customers (다수 수요자-공급자간 적응적 협력관계하의 지능형 에이전트 기반 공급망운영 구조)

  • 윤한성
    • Journal of Intelligence and Information Systems
    • /
    • v.9 no.1
    • /
    • pp.109-123
    • /
    • 2003
  • The relationship between suppliers and customers is treated importantly not only in the traditional business-to-business (BtoB) commerce but also in today's Internet environments. On the one hand, most of Internet-based BtoB commerce services like customer-centric e-procurement, supplier-centric e-sales or intermediary-centric e-marketplace focus mainly on the selection of partners according to bidding, auction, etc. This point may result in the problem of overlooking the relationships between suppliers and customers. To overcome this problem in this paper, an intelligent agents-based supply chain operation architecture is proposed and appraised considering the relationship and its adaptation.

  • PDF