• Title/Summary/Keyword: benefit-cost analysis

Search Result 957, Processing Time 0.026 seconds

For capital investment "cost-benefit analysis," Study on the Possibility of the Utilization (자본투자를 위한 "비용.편익분석"의 활용 가능성에 관한연구)

  • Jeong, Jae-Jeong;Yang, Gwang-Mo;Gang, Gyeong-Sik
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2013.11a
    • /
    • pp.99-104
    • /
    • 2013
  • 비용편익분석은 어떤 사업으로 인하여 자연배분의 변화가 생길 때 그에 따른 경제적 편익을 측정하게 되며 사업을 시행하여 생기는 편익과 비용을 비교하여 경제성을 평가하고 대안 중에서 우선순위를 결정할 때 유용하다. 따라서, 본 논문은 자본에 관한 투자기준을 마련하기 위해서 분석용 모델인 "비용편익분석"을 활용 하여 제조기업의 어떤 사업계획에 의하여 생겨나는 자본요소가 어떻게 투자되어야 생산비용을 최소화 할 수 있는지를 자본투자에서 가장 핵심적인 생산설비투자와 기술개발투자에 대한 비용편익분석을 통하여 그 방법론을 제시함으로써, 자본투자에 있어서 "비용효과분석"의 활용성을 확인하고자 한다.

  • PDF

Cost Benefit Analysis of Foreign Research Information Centers (외국학술지지원센터 운영 사업의 비용편익분석)

  • Kim, Kwang-Seok;Oh, Dong-Geun;Yeo, Ji-Suk
    • Journal of Korean Library and Information Science Society
    • /
    • v.43 no.1
    • /
    • pp.287-301
    • /
    • 2012
  • This article analyzes the costs and benefits of the seven individuals centers of Foreign Research Information Center. Results of the investment feasibility analysis based on 30 years time span show that 0.99 of BCR (Benefit-Cost Ratio), 5.49% of IRR (Internal Rate of Return), and -507 million Won of NPV (Net Present Value). Sensibility analysis suggests that BCR can be influenced by the journal usage, social rate of discount, and elimination of the duplicate journal among individual centers.

Economic Evaluation of a Workplace Occupational Health Nursing Service: Based on Comparison with Atmospheric Environment Managing Engineer (사업장 내 간호사 활동의 경제성 분석: 간호사와 대기환경관리기사 비교를 통하여)

  • Jung, Hye-Sun;Lee, Bokim
    • Journal of Korean Academy of Nursing
    • /
    • v.43 no.4
    • /
    • pp.507-516
    • /
    • 2013
  • Purpose: The purpose of this study was to use cost-benefit analysis of activity to clarify the economic effect of prepared nurses versus atmospheric environment managing engineers as healthcare managers. Methods: For the study 111 workplaces were surveyed, workplaces in which nurses or atmospheric environment managing engineers were employed as healthcare managers. The survey content included annual gross salaries, participation in external job training, costs in joining association covered by the company, location and year of construction of the healthcare office, various kinds of healthcare expenditures, costs in operating healthcare office, health education, and activity performance in the work of environment management. Results: In the case of the healthcare manager being a nurse, benefit was larger than input costs at a ratio of 2.31. On the other hand, in the case of healthcare manager being an atmospheric environment managing engineer, input costs were larger than benefits (benefit-cost ratio 0.88). Conclusion: Results indicate that nurses are an effective healthcare human resource and can offer good quality healthcare service. Therefore companies should hire nurses and actively promote the economic efficiency of nurses in workplace.

Estimation of Users대 Benefit Value for Woobang Tower Land in Taegu Using Travel Cost Method (여행비용접근법을 통한 대구 우방타워랜드의 편익가치 측정)

  • 김수봉;심애경;권기찬
    • Journal of Environmental Science International
    • /
    • v.10 no.3
    • /
    • pp.173-178
    • /
    • 2001
  • The aim of this paper is to evaluate users benefit values of theme park using Travel Cost Method with special reference to Woobang Tower Land in Taegu for the estimation of economic values. This research is mainly based on questionnaire survey of 100 users of the theme park. Socio-economic factors such as income, year of education, annual income, age and money(travel cost) are analysed from 5 residential areas of the respondents. Multiple regression analysis was used for the evaluation of annual number of park visitings based on the analysis. The regression model shows NV = $\alpha$+$\beta_1$TC+$\beta_2$INC+$\beta_3$EDU+$\beta_4$AGE (NV : Annual Number of Visitings, TC : Travel Cost, INC : Annual Income, EDU : Years of Education, AGE : Age). Regarding to visitors demand curve based on the equation showed that annual economic values of Woobang Tower Land was estimated as 50billion Korean Won.

  • PDF

Economic Evaluation of Integrated Operation & Management through Operation Performance Analysis of Sewage Facilities (하수도시설 통합운영 성과분석을 통한 통합운영관리의 경제성 평가)

  • Shin, Jungsub;Chung, Seokhyun;Cho, Byoungog;Lee, Kwanhyung;Kang, Seonhong;Kim, Yongdae;Yoon, Joonjae
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.31 no.1
    • /
    • pp.63-72
    • /
    • 2017
  • For economic evaluation of integrated operation to sewage facilities, benefit-cost analysis was performed to watershed sewage works project in 7 watershed areas, 156 facilities. In this study, the cost before and after integrated operation was compared and benefits are calculated from the reduction of operators, increasement treated pollution loads, reduction cost through operation convenience, reduction water consumption through effluent reuse, and improvement of life benefit. The result showed that cost was 8,500million won and benefit was 16,747million won, so benefit was 49% higher than cost. B/C analysis result showed that B/C ratio was 1.97 and it is similar to other researches. The benefits of integrated operation included convenience of data management, increase of emergency response, decrease of complains with sewage which was not reflected numerically, so the benefits of integrated operation were expected much greater than this result

The Economic Analysis of A Solid Refuse Fuel (SRF) Project in the Urban Area (가연성 폐기물 고형연료(SRF) 사업의 경제성 분석)

  • Jang, EunMi;Cho, Yongsung
    • Journal of Climate Change Research
    • /
    • v.4 no.3
    • /
    • pp.245-254
    • /
    • 2013
  • Korea government promote renewable energy as the core of their energy matrix to break the dependence and reduce greenhouse effects. This study analyzes the economic assessment of Solid Refuse Fuel project in urban area, considering the marginal external costs of air pollution in this area. Assessment index defined as costs (i.e., construction cost, operation cost) and benefit (margin, external cost) data which is located in Sudokwon landfill site. The result indicates that cost-benefit analysis of SRF is calculated as 1.0. In addition, SRF project is very sensitive about electric power selling price, operating cost and labor cost according to inflation rates. This study shows that the sustainability of SRF project is required the government financial support like investment funds as well as policy support. Variability analysis of SRF economic assessment due to renewable energy can be used for making policies in various fields such as waste and public energy field.

A Method of Economic Analysis for RFID Applications Focused on Courier Sector (RFID 도입을 위한 경제성 분석 방안에 관한 연구 : 택배물류 산업을 중심으로)

  • Koo, Hoon-Young
    • The Journal of Society for e-Business Studies
    • /
    • v.15 no.1
    • /
    • pp.119-137
    • /
    • 2010
  • The absence of a concrete method for economic analysis is one of the main reasons that the RFID is not so widespread. Through literature survey and a case study of a courier service company we propose a novel method of economic justification including cost and benefit analysis. In order to reflect the uncertainties caused by the RFID technology itself and the estimated investment cost, we propose optimistic, conservative and pessimistic estimations of benefits and a sensitivity analysis of investment costs. This paper may contribute the systematic evaluation of cost and benefit of RFID adoption.

The Benefit Cost Analysis of the Accident Prevention Cost in Construction Work(I) (건설공사의 사고예방비용에 대한 효과분석(I))

  • Lim Heon-Jin;Kim Chang-Eun;Kim Jin-Soo
    • Journal of the Korea Safety Management & Science
    • /
    • v.7 no.5
    • /
    • pp.9-18
    • /
    • 2005
  • This study delivers the actual condition of investment for industrial accident prevention based on survey of 526 construction sites. The various research techniques were used such as technical statistic analysis for construction industry, construction and civil engineering works, cost comparison of industrial accident prevention and accident loss. A formula was deduced to calculate accident loss and accident frequency by accident prevention cost through regression analysis.

An Extended Benefit-Cost Analysis of Land Consolidation and On-farm Development Project -With Respect to Jigok Land Consolidation and On-farm Development Project in Seosan, Chungnam Province, Korea- (경지정리사업의 확장편익-비용분석 - 충남서산시 지곡지구를 중심으로 -)

  • Lim, Jae-Hwan;Lee, Min-Soo
    • Korean Journal of Agricultural Science
    • /
    • v.29 no.1
    • /
    • pp.66-83
    • /
    • 2002
  • The economic feasibility analysis including benefit-cost ratio and internal rate of return of a land consolidation and on-farm development project was mainly depended upon the direct benefits and costs arising during project life. Therefore the projects were neglected in allocating the government's financial funds and loans on account of the low economic rate of return of the project. Accordingly the extended benefit-cost analysis method should be introduced and adapted to cover not only the benefit s such as non-market values of environmental and food security fun ct ions of the project but also market values of the project outputs. The main purposes of this study are (1) to prepare a guide line for economic feasibility analysis based on the IBRD and ADB guidelines, (2) to estimate the benefits from productivity increase, labor saving, savings of O&M cost of farm mechanization and project facilities, savings of farmer's burden for their public health, increasing environmental and public functional value of paddy fields, improving food security condition and formation of peaceful and uncontroversial rural society by implementing the land consolidation and on-farm development, (3) to introduce the newly adapted analytical method as the extended benefit cost analysis which could make possible to be included the values of non-market goods such as the food security and the environmental public function of paddy fields. To carry out this study, the existing publications on the guidelines for economic agricultural projects were reviewed and consultation was made with a For the post evaluation study of the land consolidation and on-farm development project, field survey in Jigok and other comparative area were made to get available information. According to the project completion report, Jigok land consolidation and on-farm development project has 55ha of benefit area out of 69ha of gross area. The project was started in November 11th, 2000 and completed october 30th, 2001. The total project costs were amounted to 2,548 million won and the annual project benefits were estimated at 335million won evaluated by domestic market prices. The ERR(Economic Rate of Return) and SRR(Social Rate of Return) of the project based on the shadow pricing system were estimated at 4.4% and 16% respectively. On the other hand, the ERR and SRR based on the domestic market value system were amounted to 6.37% and 14.62%. In conclusion, Korean land consolidation and on-farm development projects have not carried out from the view point of economic rate of return under shadow pricing system but from the view point of domestic pricing system. For the future feasibility studies on land consolidation projects have to be carried out including the non-market values as environmental and food security function of the projects.

  • PDF