AN EXAMPLE OF REPRESENTING THREE LEVEL'S SCHEDULES WITHIN SCHEDULE HIERARCHY BY BDM TECHNIQUE

  • Seon-Gyoo Kim
    • International conference on construction engineering and project management
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.445-452
    • /
    • 2011
  • The schedule hierarchy in construction project is generally composed of three levels. The highest level is a milestone schedule and represented by Bar Chart format. The middle level is an integrated project schedule (IPS) and represented by CPM (Critical Path Method) format. The lowest level is a detail working schedule and usually represented by Bar Chart. The traditional scheduling techniques such as ADM (Arrow Diagramming Method) or PDM (Precedence Diagramming Method) cannot represent all kinds of schedule within schedule hierarchy as identical schedule format. However, the BDM (Beeline Diagramming Method) technique can represent all kinds of schedule within schedule hierarchy as identical CPM format. This paper describes the basic concept, principle, interpretation methods, and schedule computation methods of the BDM as a new networking technique that can represent all kinds of overlapping relationships between activities, and then presents an example of representing three level's schedules within schedule hierarchy by the BDM technique.

  • PDF

Quantitively deducing basic method of construction schedule risk (공정리스크의 정량적 도출을 위한 기초적 방법)

  • Ryu, Han-Guk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 한국건축시공학회 2014년도 추계 학술논문 발표대회
    • /
    • pp.90-91
    • /
    • 2014
  • Previous research related to the construction schedule management has focused on construction schedule categorization, construction schedule management, and system development to manage construction schedule risks. Therefore this research present quantitively deducing method for managing construction schedule risk. Based on the investigation, this study suggested the probable risk factors and a practical management method, through interviews and discussions with experts. The quantified risks should be adapted for an individually specific projects and managed until the project is complete. To maintain the continuity of schedule risks, the schedule risk management procedures should be controlled during the performance of the construction project.

  • PDF

BASIC DESIGN OF A SCHEDULING TOOL FOR SMART DEVICES

  • Myunghoun Jang
    • International conference on construction engineering and project management
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.521-524
    • /
    • 2013
  • Schedule management of construction work is important in order to complete construction projects within a given period of time. Many efforts have been made and many tools have been developed in order to manage construction projects by a smart device such as smart phones and smart pads. This research proposed a basic design to manage construction schedules via a smart device using Flash. The interactive and graphic property of Flash enables a field manager to manage schedules easily and efficiently. A basic structure was designed for a user to be able to make and change a schedule by touching the smart device's screen. And a prototype was implemented by Adobe Flash/Flex Builder, it is applied to a sample network in a smart phone.

  • PDF

Integration Model of Cost and Schedule in Aluminum Form Work based on Quantity Take-offs and Daily Productivity Analysis (물량 산출 및 생산성 분석 기반의 거푸집공사 비용공정 통합 모델)

  • Ji, Soung-Min;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 한국건축시공학회 2011년도 추계 학술논문 발표대회
    • /
    • pp.17-18
    • /
    • 2011
  • Over the past 20 years, Researchers have tried to develop "Integration Model of Cost and Schedule" in construction industry. They suggested various models and techniques, however, it is still required to develop new methodology for AL Form Work in Public Multi-Housing Projects. Accordingly, this research focused on measuring quantity take-offs of on-going projects and analysing the basic process of using the resources(Labor, Material, Plant) related to cost and time data. There are 3 steps of this research : 1) The literature review of previous studies about Integration Model of Cost and Schedule was conducted. 2) Model for integration between cost and schedule was developed. 3) the accuracy of developed model was verified. The results are expected to improve in integrated managing the cost and schedule data of AL form work.

  • PDF

A Study on the Visualization of an Airline's Fleet State Variation (항공사 기단의 상태변화 시각화에 관한 연구)

  • Lee, Yonghwa;Lee, Juhwan;Lee, Keumjin
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • 제29권2호
    • /
    • pp.84-93
    • /
    • 2021
  • Airline schedule is the most basic data for flight operations and has significant importance to an airline's management. It is crucial to know the airline's current schedule status in order to effectively manage the company and to be prepared for abnormal situations. In this study, machine learning techniques were applied to actual schedule data to examine the possibility of whether the airline's fleet state could be artificially learned without prior information. Given that the schedule is in categorical form, One Hot Encoding was applied and t-SNE was used to reduce the dimension of the data and visualize them to gain insights into the airline's overall fleet status. Interesting results were discovered from the experiments where the initial findings are expected to contribute to the fields of airline schedule health monitoring, anomaly detection, and disruption management.

A Study on Proto-type Development of BIM based Architectural Construction Simulation System (BIM기반 건축시공 시뮬레이션 시스템 프로토 타입 개발에 관한 연구)

  • Park, Jae-Hyun;Yun, Seok-Heon;Paek, Joon-Hong
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 한국전산구조공학회 2008년도 정기 학술대회
    • /
    • pp.442-445
    • /
    • 2008
  • The purpose of this study is making Proto-type development of BIM based Architectural Construction Simulation System. This study suggest a new schedule access method for overcoming limitation of current Simulation Program focused on visualization. The method made from analysis of current Simulation Program. This program is based on Visual Basic .Net language.

  • PDF

Development of Kiln Schedules to Eliminate the Development of Internal Checking in Radiata Pine Boards

  • Kang, Ho-Yang;Booker, R.E.
    • Journal of the Korea Furniture Society
    • /
    • 제19권2호
    • /
    • pp.116-123
    • /
    • 2008
  • Kiln schedule development was based on two schedule phases, the first being to determine the maximum safe kiln temperature during the check prone initial stage of drying, with the second stage determining how to accelerate drying once the danger of checking had passed. This was achieved by using 38 mm thick boards which were pre-screened for susceptibility to internal checking, and then drying matched sample boards over a range of kiln temperatures. Research has shown that below 50% MC there is no further risk of internal checking. However, difference in drying rate due to board width and the increased occurrence of wet patches in wide boards means that it is essential to modify the basic schedule according to the maximum board width. A condition of 52/40 $^{\circ}C$ was selected for the checking-free initial kiln drying step and a 5-step kiln-schedule dried the boards from 109% to 8% MC for 72.5 hours without internal checking.

  • PDF

Pass Redesign for Reduction of Wire Breakage in the Wet Wire Drawing Process (습식 신선공정의 단선율 저감을 위한 패스 재설계)

  • Lee S. K.;Kim M. A.;Kim B. M.
    • Proceedings of the Korean Society for Technology of Plasticity Conference
    • /
    • 한국소성가공학회 2002년도 제5회 압출 및 인발가공 심포지엄
    • /
    • pp.71-77
    • /
    • 2002
  • The Production of fine wire through wet wire drawing process with appropriate pass schedule would be impossible without understanding of relationship among many process parameters. Therefore, this paper investigates the relationship among process parameters of wet wire drawing process. In this study, it is possible to obtain the important basic data that can be used in the pass schedule of multi-pass wet wire drawing process. In order to verify the effectiveness of the analysis, pass redesign was performed based on the result of analysis to reduce the wire breakage. The wire breakage between the conventional pass schedule and the redesigned pass schedule was compared by the FE analysis and the wet win drawing experiment.

  • PDF

A Study on Integration of Schedule Management and Risk Management (공정관리와 리스크관리의 통합을 위한 기초연구)

  • Jang, Myung-Houn;Youn, You-Sang;Suh, Sang-Wook
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.105-110
    • /
    • 2006
  • It is more effective and more efficient to manage schedule and risk at a same time because many risks occur in construction phase in building construction projects. The objective of this paper is to propose a tool that manages risks in a project management software. The tool is implemented by VBA in Microsoft Project, and enables field managers of a construction project to make schedules and to help to predict risks.

  • PDF

A Method of Applying Work Relationships for a Linear Scheduling Model (선형 공정계획 모델의 작업 관계성 적용 방법)

  • Ryu, Han-Guk
    • Journal of the Korea Institute of Building Construction
    • /
    • 제10권4호
    • /
    • pp.31-39
    • /
    • 2010
  • As the linear scheduling method has been used since the Empire State Building linear schedule in 1929, it is being applied in various fields, such as construction and manufacturing. When addressing concurrent critical paths occurring in a linear construction schedule, empirical researches have stressed resource management, which should be applied for optimizing workflow, ensuring flexible work productivity and continuous resource allocation. However, work relationships have been usually overlooked in making the linear schedule from an existing network schedule. Therefore, this research analyzes the previous researches related to the linear scheduling model, and then proposes a method that can be applied for adopting the relationships of a network schedule to the linear schedule. To this end, this research considers the work relationships occurring in changing a network schedule into a linear schedule, and then confirms the activities movement phenomenon of linear schedule due to workspace change, such as physical floors change. As a result, this research can be used as a basic research in order to develop a system generating a linear schedule from a network schedule.