• Title/Summary/Keyword: basic flood.

Search Result 232, Processing Time 0.025 seconds

Distribution and Application of Community-based Disaster Risk Information : Lessons from Shiga Prefecture in Japan

  • Choi, Choongik;Choi, Junho
    • Journal of Distribution Science
    • /
    • v.16 no.6
    • /
    • pp.15-23
    • /
    • 2018
  • Purpose - This paper aims to explore the distribution and application of community-based disaster risk information and employ a case study as a qualitative research method to make some implications and suggestions for disaster management in the future. Research design, data, and methodology - This research has basically adopted an idiographic approaches to examine the basic policy of integrated flood risk management of Shiga prefecture in Japan. The methodology is based on a retrospective analysis, which starts from critical events and traces backwards processes to find out what goes well or wrong. Results - The results of this paper support that the multiple stakeholders in a community have to share and distribute disaster risk information in the proper time. The distribution and application of community-based disaster risk information cannot be overemphasized in that the local communities are culturally rich in traditional flood management knowledge, have voluntary organizations and have enjoyed mutual support and human network to cope with floods. Conclusions - The study results also imply that local residents of the community will be abe to have an important role in coping with natural disasters, which involves more proactive actions than passive actions for the enhancement of disaster management.

Modern Urbanization Process of Ganggyeong during the Japanese Colonial Period, focused on Installation of Urban Infrastructure (일제강점기 도시기반시설의 설치를 통해 본 강경의 도시화 과정)

  • Hyun, Tae-jun;Kim, Ki-Joo;Lee, Yeon-Kyung
    • Journal of architectural history
    • /
    • v.28 no.6
    • /
    • pp.55-65
    • /
    • 2019
  • Ganggyeong, a city which is located at riverside of Geum River, played a role to connect the inland cities and the coastal cities through the Geum river waterway. In Chosun dynasty, Ganggyeong was one of the three major markets in Korea, and at the same time, it was one of the two river docks in Korea. However, after the railway was installed in Korea, railroad was more important than waterway in transporting logistics and in 1911 Honam railroad and Ganggyeong railway station was installed. Thus it was necessary to reorganize urban structure of Ganggyeong city from the traditional river-dock city to modern railroad city. In addition, urban infrastructure to prevent flood damage was needed because Ganggyeong suffered from floods and water shortages every year. Therefore, between 1910s and 1930s large-scale social infrastructures including road, water and sewage system, river bank, floodgate was constructed not only to revitalize the declining city but also to prevent flood damage and water shortages that hinder urban development. The installation of urban infrastructure has enabled the urban expansion and development of Ganggyeong city, and it is still served as a basic urban structure.

Derivation of Optimal Design Flood by Gamma and Generalized Gamma Distribution Models(I) - On the Gamma Distribution Models - (Gamma 및 Generalized Gamma 분포 모형에 의한 적정 설계홍수량의 유도 (I) -Gamma 분포 모형을 중심으로-)

  • 이순혁;박명근;정연수;맹승진;류경식
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.39 no.3
    • /
    • pp.83-95
    • /
    • 1997
  • This study was conducted to derive optimal design floods by Gamma distribution models of the annual maximum series at eight watersheds along Geum , Yeong San and Seom Jin river Systems, Design floods obtained by different methods for evaluation of parameters and for plotting positions in the Gamma distribution models were compared by the relative mean errors and graphical fit along with 95% confidence interval plotted on Gamma probability paper. The results were analyzed and summarized as follows. 1.Adequacy for the analysis of flood flow data used in this study was confirmed by the tests of Independence, Homogeneity and detection of Outliers. 2.Basic statistics and parameters were calculated by Gamma distribution models using Methods of Moments and Maximum Likelihood. 3.It was found that design floods derived by the method of maximum likelihood and Hazen plotting position formular of two parameter Gamma distribution are much closer to those of the observed data in comparison with those obtained by other methods for parameters and for plotting positions from the viewpoint of relative mean errors. 4.Reliability of derived design floods by both maximum likelihood and method of moments with two parameter Gamma distribution was acknowledged within 95% confidence interval.

  • PDF

Backwater Computation in River Channel by the Runoff-Frequency (유출변화(流出変化)에 의한 배수현상(背水現象) 해석(解析))

  • Suh, Seung Duk;Suk, Ki Hong
    • Current Research on Agriculture and Life Sciences
    • /
    • v.2
    • /
    • pp.77-90
    • /
    • 1984
  • Results investigated backwater phenomena at Geumho river basin to get a basic data for Daegu basin area development plan are as the follows. 1. It is a A=0.35 L 1.848 (r = 0.97), the relationship between basin area and river length at Geumho river. 2. Dividing the rainfall of Geumho river basin as two parts, a first half rainfall and a second half rainfall, the amount of a first half rainfall appeared 57.5% comparison with total rainfall. 3. The maximum flood discharge appeared 12 hrs. continuous rainfall rather than 24 hrs. continuous rainfall. 4. Results investigated backwater phenomena from Geumho II bridge to chungchun appeared the rising water level of 69 cm, 55 cm, 44 cm, at section III in the starting point water level of 1.8 m, 2.4 m, 4.0 m respectively. 5. Results investigated backwater phenomena by the flood water level appeared a similar form. There was a average rising water level of 30 cm at section III. At the results of this computation, it was confirmed that section III was affected the highest backwater phenomena among the observed river reaches in Geumho river. In addition, this paper should be given a assistance to decide a economic and safe section in construction of bank of river and estuary barrage.

  • PDF

Analysis of the Impact of Building Congested Area for Urban Flood Analysis (도심지 침수해석을 위한 건축물 밀집 지역 영향 분석)

  • Kim, Sung-Uk;Jun, Kye-Won;Lee, Seung-Hee;Pi, Wan-Seop
    • Journal of Korean Society of Disaster and Security
    • /
    • v.15 no.3
    • /
    • pp.41-46
    • /
    • 2022
  • Recently, the scale of flood damage occurring in urban areas is increasing due to climate change and urbanization, so various flooding analysis techniques are needed. In the Sadangcheon Stream basin, which has been continuously flooded since 2010, a basic plan for improving drainage was established using XP-SWMM and measures to prevent flooding were proposed. However, in the process of inundation analysis, the analysis considering the city's buildings was not conducted, resulting in a problem that the degree of flooding damage tends to be overestimated. Therefore, in this study, XP-SWMM was used to compare and analyze cases where buildings were not considered and designated as inactive areas. As a result of the study, it was analyzed if the building was not considered, the flood damaged area was 271,100 m2 and the depth of submersion was 0.15 m, and if the building was considered inactive area, the flood damaged area was 172,900 m2 and the depth of submersion was 0.32 m that it is under-estimated about 36% and an flow velocity around the building increased from 1.62 m/s to 1.83 m/s about 1.12 times.

Urban Runoff Network Flow Velocity Monitoring System Using Ubiquitous Technique and GIS (Ubiquitous 기술과 GIS를 이용한 도시배수관망 유속측정 시스템 개발)

  • Choi, Changwon;Yi, Jaeeung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.5B
    • /
    • pp.479-486
    • /
    • 2010
  • Reliable hydrologic data acquisition is the basic and essential requirement for efficient water management. Especially the acquisition of various stream data in a certain location is very important to construct on alarm system to response an urban flood which occurs frequently due to the effect of climate change. Although the frequency of stream inundation flood occurrence becomes low owing to the consistent stream improvement, the urban flood due to the drainage system problems such as deterioration and bad management occurs continuously. The consistent management and current status understanding of the urban drainage system is essential to reduce the urban flood. The purpose of this study is to develop the urban runoff network flow velocity monitoring system which has the capability of collecting stream data whenever, wherever and to whomever without expert knowledge using Code Division Multiple Access technique and Bluetooth near-distance wireless communication technique. The urban runoff network flow velocity monitoring system consists of three stages. In the first stage, the stream information obtained by using ubiquitous floater is transferred to the server computer. In the second stage, the current state of the urban drainage system is assessed through the server computer. In the last stage, the information is provided to the user through a GUI. As a result of applying, the developed urban runoff network flow velocity monitoring system to Woncheon-Stream in Suwon, the information necessary for urban drainage management can be managed in real time.

Decision-Making Model Research for the Calculation of the National Disaster Management System's Standard Disaster Prevention Workforce Quota : Based on Local Authorities

  • Lee, Sung-Su;Lee, Young-Jai
    • Journal of Information Technology Applications and Management
    • /
    • v.17 no.3
    • /
    • pp.163-189
    • /
    • 2010
  • The purpose of this research is to develop a decision-making model for the calculation of the National Disaster Management System's standard prevention workforce quota. The final purpose of such model is to support in arranging a rationally sized prevention workforce for local authorities by providing information about its calculation in order to support an effective and efficient disaster management administration. In other words, it is to establish and develop a model that calculates the standard disaster prevention workforce quota for basic local governments in order to arrange realistically required prevention workforce. In calculating Korea's prevention workforce, it was found that the prevention investment expenses, number of prevention facilities, frequency of flood damage, number of disaster victims, prevention density, and national disaster recovery costs have positive influence on the dependent variable when the standard prevention workforce was set as the dependent variable. The model based on the regression analysis-which consists of dependent and independent variables-was classified into inland mountainous region, East coast region, Southwest coastal plain region to reflect regional characteristics for the calculation of the prevention workforce. We anticipate that the decision-making model for the standard prevention workforce quota will aid in arranging an objective and essential prevention workforce for Korea's basic local authorities.

  • PDF

Basic Investigation about Hydro-Geomorphologic and Vegetation Cover Changes on the Regulated River - A Case of the Downstream River of Andong Dam/Imha Dam on the Nakdong River (조절된 하천의 수문지형학적 변화와 식생 피복의 변화에 관한 기초 조사 - 낙동강 안동댐/임하댐 하류 하천 사례)

  • Woo, Hyo Seop;Rhee, Dong Sup;Ahn, Hong Kyu;Lee, Chang Seok
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2004.05b
    • /
    • pp.1335-1339
    • /
    • 2004
  • A hydro-geomorphologic change in a sand bed channel reach and vegetation expansion by changes in the How regime is analyzed in this study. Field and aerial photo surveys, basic hydrological analysis about flow regime change due to two dams, Andong Dam and Imha Dam, on the upstream river and computer modeling are conducted. Two Dams in the study reach have obviously affected downstream channel in many ways including the bed particle coarsening, vegetation expansion on the sandbars and following river channel braiding. The phenomenon of no vegetation on the large point bar in front of Hahwe Village seems due to disturbance of the sandbar surface probably due to the cross flow in the meander reach during the flood. Another reason for no vegetation is that the sandbar on this reach has lower subsurface water lovels, as compared with the others in the up- and downstream of the reach where vegetation expanded, which would hinder vegetation from germinating and growing on the sandbar.

  • PDF

Comparison and State Analysis of Slope Management System(SMS) at Home and Aboard (국내외 사면관리시스템의 비교 및 현황분석)

  • Kang, Ho-Yun;Jang, Yong-Gu;Hong, Soon-Hun;Kang, In-Joon
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2007.04a
    • /
    • pp.403-408
    • /
    • 2007
  • Korea is topographically and meteorologically prone to natural disasters. In addition to extraordinary weather, localized heavy rain is a irregular occurrence. Korea are frequently damaged by rain, wind, flood, etc. Recently, slope failures are disastrous when they occur in mountainous area adjoining highways. The accidents associated with slope failures have increased due to rapid urbanization of mountainous area. Therefore, the inspection of slope is conducted to maintain highway safety as well as road function. We developed basic function and risk management of a partial shape on highway slopes based on the internet. It is important for quantitative risk evaluation of highway slopes.

  • PDF

A Basic Study on the River Basin Routing Using Numerical Analysis (수치해석을 이용한 자연하천의 하도추적에 관한 기초적연구)

  • Kim, Sung Woon;Koh, Byung Ryoun;Koh, Chang Jong
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.12 no.2
    • /
    • pp.127-139
    • /
    • 1998
  • The objectives of this study is at the development of the channel routing model which can be used for flood prediction. Among the routing models, the hydraulic technique of the implicit scheme in the dynamic equation is selected to route the unsteady varied flow in the open channel. The channel routing model is catchment runoff which computed by the conceptual and transfer function model. The conceptual and transfer function model can simulate the catchment runoff accurately. As a result of investigating the channel routing model, the optimal weighting factor ${\theta}$ which fixes two points between time line is chosen, and also, the optimal error tolerance which satisfies computing time and converge of solution is determined in this study.

  • PDF