• Title/Summary/Keyword: base point maintenance and management

Search Result 12, Processing Time 0.024 seconds

The Research about Efficient Control of the Territorial Base Point (영해기준점의 효율적 유지관리 방안에 관한 연구)

  • Choi, Yun-Soo;Kim, Jae-Myeong;Yun, Chang-Beom
    • Spatial Information Research
    • /
    • v.18 no.1
    • /
    • pp.39-48
    • /
    • 2010
  • Recently, many countries are promoting the rapid development of marine for securing territorial sea. The importance of territorial sea has being emphasized as territorial disputes among countries has been increasing. The South Korea should be encouraged to expand the territory due to territorial disputes with neighborhood countries. The purpose of this study is to derive a improvement plan for the efficient control of the territorial base point through analyzing the existing territorial base point and checking the territorial base point. Therefore, we proposed a variety of new plans for accurate positioning by sea level observation and MBES, reduced the surveying procedure through analyzing the existing territorial base points and provided a basis for the territorial base points which can be the 2nd grade national control points by improving a grade. We also suggested that the territorial base points and sub-territorial base points' database should be given standardized number for increasing the efficient management of other national control points and territorial base points. Finally, we suggested a improved work regulation about analysis and maintenance for territorial base points, the information activity of territorial base points and the new plan of community relations. This study will be a basis for the foundation of maritime territory which could be superior to other countries and the expansion of maritime territory.

The study on the Base point and baseline in Korea, Japan, and China (한반도 주변의 영해기점 및 기선에 관한 연구 - 한국, 중국, 일본을 중심으로)

  • Kim, Baek-Su;Choi, Yun-Soo;Park, Byung-Moon;Jeon, Chang-Dong
    • Spatial Information Research
    • /
    • v.16 no.3
    • /
    • pp.331-342
    • /
    • 2008
  • The countries are trying to expand the sea limit such as the territorial sea, fishing zone or the exclusive economic zone as far as the Law of the Sea permit to do for the benefit of their national interest. Especially, they are eager to claim the base point where it locates far from the coastline even if it is uninhabited island or reef under the sea. The baseline has been claimed to maximize the territorial sea. Another way to expand the sea limit is to lower the vertical datum to change the land limit. China claimed Dongdo which is located about 79 miles far from the coast as the base point. Japan also claimed many uninhabited island or the reef which is located very far from the coast such as Okino Dorishima. As Korea is the party who negotiate the maritime limit with Japan and China, we should be keen and sensitive on the issues claimed by neighboring countries in terms of base point and the baseline. This paper is to review the characteristics of the base points or baselines of neighboring countries and to suggest the views how to maintain and to relocate our base points. As western coast of Korean peninsula is one of the largest tide fluctuation zone in the world, with long tidal record to prove the vertical datum adjustment, Korea can find the way to lower the vertical datum especially in Yellow Sea. So, major and critical tidal station has to be set up along the western coast to verify tide fluctuation record which can be met with international standard.

  • PDF

Preliminary Investigation for Apply of e-Government Framework at the Construction CALS System (건설CALS시스템에 전자정부 표준프레임워크 적용을 위한 사전 고찰)

  • Yang, Sung-Hoon;Kim, Nam-Gon
    • The Journal of the Korea Contents Association
    • /
    • v.13 no.11
    • /
    • pp.433-440
    • /
    • 2013
  • The Ministry of Land, Infrastructure and Transport was developed the Construction CALS system for improvement of the construction economy. Construction CALS system is consist by Construction Portal System, Construction Management System, Construction Authorization and Permission System, Compensation Management System, Facility Maintenance Management System and has utilized at construction site of more than 900. Ministry of Land, Infrastructure and Transport and related researcher was proposed method of various function improvements for usability of the system. However, the proposed method was expanded the problems like increase of system management cost and development cost with decrease of data process rate. The problem was increases because has added of only service function without modify of software structure to the system on each different platform base. One of the methods for solving problems is to apply the e-Government framework and then integrated the different platform. The purpose of this paper is analyse of the applicability and efficiency of e-Government framework to the construction CALS system. For that was analyzed the e-Government standard framework and the developments case. And then was verified about the adaption possibility and efficiency by use the Function Point tool.

Database Structure and Information Exchange System of KEPCO's EMS SYSTEM (한전(韓電)EMS의 데이터베이스 및 정보교환체제(情報交換體制))

  • Lee, Kyung-Jae;Yu, Sung-Chul;Kim, Yeong-Han;Lee, Hyo-Sang
    • Proceedings of the KIEE Conference
    • /
    • 1988.11a
    • /
    • pp.87-91
    • /
    • 1988
  • For the electric power system operation, the information to monitor the operation status of power plants and transmission lines is very important factor in the view point of system security and economic operation. This paper presents the logical and physical structures of database used by KEPCO's EMS. The adopted DataBase Management System (DBMS) of a relational model type offers many advantages such as easy maintenance of database. In addition, this paper briefly introduces the data exchange system between application programs and database.

  • PDF

A Study on the Necessity of Verification about depot level maintenance plan through the Weapons System cases analysis (무기체계 사례 분석을 통한 창정비개발계획안 검증 필요성 연구)

  • Ahn, Jung-Jun;Kim, Su-Dong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.2
    • /
    • pp.76-82
    • /
    • 2019
  • This study has done to search for a solution to remove risk limitedly caused by separating weapon system acquisition from operation and maintenance at the view point of Logistic Commander who's responsible for stable operation and maintenance after acquiring weapon system. At the System development stage, unverified overhaul development plan may cause additional manpower and costs after the development, and furthermore it is likely to have risk to lower reliability of the military. Thus, research and development agency should write overhaul development plan at the System development stage, and it should be verified through evaluation and verification test. Secondly, during research and development, institutional supplementation is needed to calculate human and material resources writing overhaul development plan. Thirdly, it should be able to analyze proper operation & maintenance plan and cost for overhaul plan at the pre-investigation stage. Fourthly, the base which can develop overhaul concept and overhaul factors should be included in the need and need determination document. Lastly, for the weapon system which has small amount of high power figure, project management should be performed to be able to specify at the each acquisition level of weapon system to realize Article 28, clause 3 and 4 of Defense business law.

The Effective Approach for Non-Point Source Management (효과적인 비점오염원관리를 위한 접근 방향)

  • Park, Jae Hong;Ryu, Jichul;Shin, Dong Seok;Lee, Jae Kwan
    • Journal of Wetlands Research
    • /
    • v.21 no.2
    • /
    • pp.140-146
    • /
    • 2019
  • In order to manage non-point sources, the paradigm of the system should be changed so that the management of non-point sources will be systematized from the beginning of the use and development of the land. It is necessary to change the method of national subsidy support and poeration plan for the non-point source management area. In order to increase the effectiveness of the non-point source reduction project, it is necessary to provide a minimum support ratio and to provide additional support according to the performance of the local government. A new system should be established to evaluate the performance of non-point source reduction projects and to monitor the operational effectiveness. It is necessary to establish the related rules that can lead the local government to take responsible administration so that the local governments faithfully carry out the non-point source reduction project and achieve the planned achievement and become the sustainable maintenance. Alternative solutions are needed, such as problems with the use of $100{\mu}m$ filter in automatic sampling and analysis, timely acquisition of water sampling and analysis during rainfall, and effective management of non-point sources network operation management. As an alternative, it is necessary to consider improving the performance of sampling and analysis equipment, and operate the base station. In addition, countermeasures are needed if the amount of pollutant reduction according to the non-point source reduction facility promoted by the national subsidy is required to be used as the development load of the TMDLs. As an alternative, it is possible to consider supporting incentive type of part of the maintenance cost of the non-point source reduction facility depending on the amount of pollutants reduction.

Optimization of Municipal Pavement Management System(PMS) Components (Development of a Prototype PMS for Ansan City) (시도로 포장관리체계(PMS) 구성요소 최적화 연구 (안산시 Prototype PMS 개발사례))

  • Park, Sang-Kyu;Suh, Young-Chan
    • International Journal of Highway Engineering
    • /
    • v.2 no.4 s.6
    • /
    • pp.111-122
    • /
    • 2000
  • PMS(Pavement Management System) has been developed and/or operated for the freeway and national highway systems in Korea. There is, however, no municipal PMS that is necessary in many cities for efficient management of their roadways. In this study, a municipal Prototype PMS is developed. The Prototype PMS is designed to be operated on PC base. It uses GIS interface for user friendliness that applies color graphics, text and distress pictures to display pavement conditions and rehabilitation information for both current and historical situations. The computer program of the prototype PMS consists of four major functions(inquiry, analysis, data management, and print). Especially, prioritization and M&R(Maintenance and Rehabilitation) alternative selection procedure is designed to be flexible so that the users can modify the decision criteria whenever it is necessary. Database items of the Prototype PMS is carefully selected for the objectives and size of municipal PMS. Reference point method is basically used for the location referencing in the Database. The unit section consists of each loom segment of the road for effective management.

  • PDF

A Study on the Improvement Plan for the Revitalization of Commercial Facilities in Railway Station Building - Focused on Ecute of Commercial Facilities of Railway Station Building in Japan - (철도 역내 상업시설의 이용 활성화를 위한 개선방안 모색 - 일본의 역내 상업시설 'ecute'에 관한 고찰을 중심으로 -)

  • Moon, Suh-hyun
    • Korean Institute of Interior Design Journal
    • /
    • v.26 no.3
    • /
    • pp.101-112
    • /
    • 2017
  • Based on an analysis of the characteristics of "Ecute" of the East Japan Railway Company (JR East) that planned the world's first large scale commercial facilities inside a ticket gate (paid-area including waiting room and platforms), the present study proposes a brand development of commercial facilities inside aged railway stations, where only basic railway business have been provided focusing on passenger transportation, by renewing the definition of railway commercial facilities and presenting a detailed planning and the direction of the operation system. A list of practical tasks that can be carried out in academia, planning and operation / management to facilitate the revitalization of the use of commercial facilities inside railway stations are as follows: 1) the setting of a wide scope for the revitalization of railway commercial facilities around the railway station focusing on private-funded stations in addition to existing stations; a setup of the direct scope of commercial development in the practical railway operation for passengers and stations in terms of external research, and a corresponding shift in thinking in terms of internal research 2) development of under used spaces such as the transfer area (Gongdeok Seoul Wangsimri Station are first target stations where more than four subway lines intersect) 3) brand establishment through improvement strategies for image and symbolism specialized for railway stations 4) rent of suitable business stores and layout of commercial facilities by analysis of passenger move pattern 5) development of commercial facilities which can attract customers by displaying various products, as well as finding a way to develop them in to a base facility that connects to local infrastructures 6) providing advertisement and management system for continual maintenance, and 7) brand specialization through unique storytelling and design plan that stimulates sensibility. The above study results can be utilized as a starting point for design brand awareness about commercial facilities in railway stations in Korea, which can be developed further to improve station image and passenger convenience, as well as to increase the revenue of railway businesses.

Development of Robotic Inspection System over Bridge Superstructure (교량 상판 하부 안전점검 로봇개발)

  • Nam Soon-Sung;Jang Jung-Whan;Yang Kyung-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.180-185
    • /
    • 2003
  • The increase of traffic over a bridge has been emerged as one of the most severe problems in view of bridge maintenance, since the load effect caused by the vehicle passage over the bridge has brought out a long-term damage to bridge structure, and it is nearly impossible to maintain operational serviceability of bridge to user's satisfactory level without any concern on bridge maintenance at the phase of completion. Moreover, bridge maintenance operation should be performed by regular inspection over the bridge to prevent structural malfunction or unexpected accidents front breaking out by monitoring on cracks or deformations during service. Therefore, technical breakthrough related to this uninterested field of bridge maintenance leading the public to the turning point of recognition is desperately needed. This study has the aim of development on automated inspection system to lower surface of bridge superstructures to replace the conventional system of bridge inspection with the naked eye, where the monitoring staff is directly on board to refractive or other type of maintenance .vehicles, with which it is expected that we can solve the problems essentially where the results of inspection are varied to change with subjective manlier from monitoring staff, increase stabilities in safety during the inspection, and make contribution to construct data base by providing objective and quantitative data and materials through image processing method over data captured by cameras. By this system it is also expected that objective estimation over the right time of maintenance and reinforcement work will lead enormous decrease in maintenance cost.

  • PDF

A Study on the Standard of Cost Estimation in the Construction of Pavement and Maintenance (도로포장 및 유지공사 표준품셈 개정 방법에 대한 연구)

  • Jung, Dae-Kwon;Tae, Yong-Ho;Ahn, Bang-Ryul;Cho, Yoon-Ho
    • International Journal of Highway Engineering
    • /
    • v.11 no.1
    • /
    • pp.85-94
    • /
    • 2009
  • In cost estimation of construction, several methods including quantity-per-unit costing, job costing, unit cost estimation and lumpsum estimation are being utilized in Korea. Among them, a Quantity-per-unit Costing Method is used as a standard of cost estimation in public and private works. This paper presents the realistic job-costing method on all road construction tasks through statistical analyses with field survey data to solve the problems induced by the existing quantity-per-unit costing method. Furthermore, it was found that the newly developed job costing method is able to produce a simple costing procedure and a more actual construction cost estimation by a case study, which was performed to compare particular construction costs produced by two different methods, existing quantity-per-unit costing and newly developed job costing. These methods is compared by Case-study about sub-base. In the case of Job costing method, the estimate is shorter than the other case about 50% and can make up for the weak point about instrument in the current Standard of cost estimation. And it can be depict by Job Costing method about progress of work for using by a plan about construction management.

  • PDF