• Title/Summary/Keyword: auxiliary dam

Search Result 12, Processing Time 0.019 seconds

Development and application of integrated indicators for assessing the water resources performance of multi-purpose and water supply dams (댐 용수공급능력 안정성 평가를 위한 통합지표 개발 및 적용)

  • Sung, Jiyoung;Kang, Boosik;Kim, Bomi;Noh, Seongjin
    • Journal of Korea Water Resources Association
    • /
    • v.55 no.9
    • /
    • pp.687-700
    • /
    • 2022
  • For comprehensively assessment the water resources performance of multi-purpose dams and water supply dams in South Korea, a methodology was proposed to utilize the durational reliability along with the integrated auxiliary indicators including resiliency, dimensionless vulnerability, water resource efficiency, specific inflow, and specific water supply. In addition, for the purpose of sustainable dam operation in the future, a plan to grade the water resources performance was presented to periodically evaluate the performance and determine the priority of each dam's structural or non-structural planning according to the evaluation results. As major results, in the case of Sumjingang Dam, the durational reliability was 99.0%, but the integrated auxiliary index was the lowest of 44 points, which was 5th grade. This means that despite the current high reliability, hydrological changes due to future climate change or regional change of water demand-supply balance can have significant impacts on the water resources performances. In contrast, the Chungju Dam with a durational reliability of 93.0%, which is below the average among all multi-purpose dams, shows the 76 points of the integrated auxiliary index, which is 3rd highest following the Soyanggang Dam and the Namgang Dam. Nevertheless, due to the size of the basin, the specific inflow is sufficiently high as 185%, so the actual performance could be evaluated relatively high. The water supply dams designed for a single purpose tend to be evaluated relatively high because they have a high proportion of industrial and municipal water supply and have enough room for the supply capacity.

Practical Research on the Advanced Detention Pond for the Improvement of Water Quality of Agricultural Reservoir (농업용저수지의 수질개선을 위한 오염물질 침강지 조성 기법)

  • Pae, Yo Sop;Nam, Gui Sook
    • Journal of Wetlands Research
    • /
    • v.10 no.3
    • /
    • pp.79-86
    • /
    • 2008
  • To improve water quality for agricultural use, it is needed to introduce the natural and low-cost self-purification system. It is also necessary to develop the water purification facilities for more efficient and convenient design, construction, operation and management. This study aims to develop the practical facilities to improve water quality for agricultural use. The practical detention pond system, which uses artificial floating island and shield skirts with bio-media, enhanced removal efficiencies of SS, TN and TP more particularly than the detention pond using an auxiliary dam. The removal efficiencies SS, TN and TP for the practical detention pond were 55.7%, 61.0% and 55.9%, respectively. The facilities of the practical detention pond has a lot of disadvantages such as the low-cost and high efficiency as well as uncountable impacts regarding ecology and landscape. However, an auxiliary dam is recommended to be installed in shallow depth due to low efficiency.

  • PDF

The Evaluation of Pollutant Removal Efficiencies by Sedimentation Basin Types constructed at the Inlets of Irrigation Reservoirs (농업용 저수지 내 침강지의 설치유형에 따른 수질정화효율 평가)

  • Jang, Jeong-Ryeol;Choi, Sun-Hwa;Nam, Gui-Sook;Kwun, Soon-Kuk
    • Journal of Korea Water Resources Association
    • /
    • v.38 no.8 s.157
    • /
    • pp.665-674
    • /
    • 2005
  • The aim of this study is to evaluate 3 types of sedimentation basins: dredging, shield skirt and auxiliary dam, constructed at inlets of two irrigation reservoir and to estimate the most beneficial type and fitted size, SAR(surface to area ratio), for pollutant removal efficiency(RE). For this, RE of major water quality items and change of physicochemical properties in sediments before and post construction of sedimentation basin(SB) were investigated. RE depended on SB types, water quality items and survey times with wide range from $-87\%$ to $92\%$. Long term overall removal efficiency by ROC(regression of concentration) method were $18\%$ in dredging, $29\%$ in shield skirt and $42\%$ in auxiliary dam type. There was a change of physicochemical properties in sediments at auxiliary dam type, while a slight change at dredging and shield skirt type. In comparison to RE, SAR and hydraulic retention time at 3 types of SB, auxiliary dam type was the most beneficial one. Thus, it is recommended that SB would be constructed in completely separated structure from water body of a reservoir with SAR ranged from 0.7 to $1.0\%.$

Preliminary Hydrological Design for Sand Dam Installation at the Valley of Seosang-ri, Chuncheon (춘천 서상리 계곡부 샌드댐 설치를 위한 수문학적 예비 설계)

  • Chung, Il-Moon;Lee, Jeongwoo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.39 no.6
    • /
    • pp.725-733
    • /
    • 2019
  • Sand dams are structures that can be used as auxiliary water resources in case of drought as sand accumulates due to barriers crossing valley rivers and valley water is stored in the voids, increasing the water level. This structure, which is mainly used in arid regions such as Africa, has not been installed in Korea. In Korea, there are only a few cases where water is taken from debris barriers that prevent debris flow. The purpose of this study is to evaluate the effect of water supply when the sand dam is installed downstream of the existing intake barrier in Seosang-ri valley, Chuncheon. For this purpose, modeling was performed by linking the basin hydrologic model and reservoir routing model. Changes in the water level, storage and discharge in the sand dam reservoir according to the size and intake of the sand dam are presented on a case-by-case basis. As a result of application, it was found that the water supply capacity due to the sand dam installation was improved at 95% reliability. Especially, when the size is L × B × Ho = 25 m × 15 m × 1 m and the pumping rates from intake barrier and sand dam are (Q1, Q2) = (30, 20), (35, 15) ㎥/day, the efficiency was the best for water supply of 50 ㎥/day.

Uncertainty decomposition in climate-change impact assessments: a Bayesian perspective

  • Ohn, Ilsang;Seo, Seung Beom;Kim, Seonghyeon;Kim, Young-Oh;Kim, Yongdai
    • Communications for Statistical Applications and Methods
    • /
    • v.27 no.1
    • /
    • pp.109-128
    • /
    • 2020
  • A climate-impact projection usually consists of several stages, and the uncertainty of the projection is known to be quite large. It is necessary to assess how much each stage contributed to the uncertainty. We call an uncertainty quantification method in which relative contribution of each stage can be evaluated as uncertainty decomposition. We propose a new Bayesian model for uncertainty decomposition in climate change impact assessments. The proposed Bayesian model can incorporate uncertainty of natural variability and utilize data in control period. We provide a simple and efficient Gibbs sampling algorithm using the auxiliary variable technique. We compare the proposed method with other existing uncertainty decomposition methods by analyzing streamflow data for Yongdam Dam basin located at Geum River in South Korea.

A Study on Seepage of the Concrete Dam base (콘크리트댐 저면 침수에 관한 고찰)

  • 정형식;신방웅
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.18 no.1
    • /
    • pp.4071-4078
    • /
    • 1976
  • The authors analyzed the seepage by means of the following mathmatical solutions of the Laplace Equations on the given boundary conditions. The boundaries of the flow region are of two types i) impervious boundaries (${\Phi}$=constant), and ii) reservoir boundaries (${\Phi}$=constant). The corresponding w plane, bounding the flow region, is the rectangle in Fig. 8-a. As the z plane and w plane are both polygons, by means of the Schwarz-Christoffel transformation the flow region in each of these planes can be mapped con for mally onto the same half of an auxiliary t plane, there by yielding, say, the functions z=f1(t) and w=f2(t). Then, either by eliminating the variable t or by using t as a parameter, the function w=f(z) can be established.

  • PDF

A Plan on the Flood Control Ability Improvement Project to maintain stability of existing dams (기존댐 치수능력 증대사업의 시행 방안)

  • Lee, Wan-Ho;Ahn, Hee-Bok
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.10a
    • /
    • pp.191-201
    • /
    • 2006
  • The flood control ability improvement project on existing dams is the project for prevention of disasters from excessive flood due to climate changes and thus protects lives and property damages by increasing safety of dams. The collapse of dam brings unimaginable disasters, so the project needs to be swiftly conducted by Government's funding. This paper introduces tile examples of the flood control ability improvement projects of multi-purpose and water supply dams, which is conducted in the way of structural measures among 26 dams operated by Kwater.

  • PDF

A Case Study on the Slope Reinforcement by Improved Steel Pipe Nailing (개량 강관네일링 공법을 이용한 사면 보강사례 연구)

  • Choi, Dong-Nam;Lim, Heui-Dae;Song, Young-Su;Lee, Kyu-Hwan
    • Journal of the Korean Society of Safety
    • /
    • v.22 no.1 s.79
    • /
    • pp.54-60
    • /
    • 2007
  • This paper describes typical design and construction practice for in-situ ground reinforcement technique using improved steel pipe pressure grouting. A case history is presented to illustrate the benefit gained by application of the technique. This technique was applied to cut slopes developed in the construction of auxiliary spillway of 00 dam. Applicable conditions, method of survey, slope stability analysis and construction are given in this parer. As for the construction method, a procedure is given and the main points are the control of construction work. As a result of the pull-out test, it is shown that seel pipe nailing is particularly useful for stabilizing rock slope.

A Study on Operating Characteristics and Design Factors of Floating Photovoltaic Generating Facilities (수상태양광 발전시스템의 운영특성 및 설계요소에 관한 연구)

  • Kim, Hyun-Han;Kim, Kwang-Ho
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.66 no.10
    • /
    • pp.1532-1539
    • /
    • 2017
  • The floating photovoltaic system is a new concept in the renewable energy technology. That is similar to land based photovoltaic technology except floating system. So the system needs buoyant objects, mooring, ect, besides modules and supports, and that is able to withstand in water level changes and wind strength. Therefore the floating photovoltaic system is much different from land photovoltaic system. K-water (Korea Water Resources Corporation) has been operating two floating photovoltaic system that's capacity is 100 kW and 500 kW respectively since in summer 2011 for commercial generation, and have construction project for 2,000 kW in Boryeong multipurpose Dam and other areas. Furthermore K-water was developing a tracking-type floating photovoltaic system at Daecheong multipurpose Dam and developed and installed an ocean floating photovoltaic demonstration plant at Sihwa Lake in October 2013 for R&D. In this paper, we introduce that structure of floating photovoltaic system include buoyant structure, mooring system and auxiliary device. Especially the rope which is in part of mooring should be always maintain tension under any water level. Also we explain about structure design concept to wind load in an every loading condition and a kind of structure materials and PV structure types used in water environment. Especially ocean floating PV system is affected by tidal current and typhoon. So there are considering the elements in design. Finally we compare with floating and land photovoltaic on power amount. As a result of that we verified the floating photovoltaic system is more about 6.6~14.2 % efficiency than a general land photovoltaic system.

Pollutant Removal Efficiency of Sedimentation Basin at Inlet of an Irrigation Reservoir (저수지 내 유입부 침강지의 수질정화 효율)

  • Jang, Jeong-Ryeol;Choi, Sun-Hwa;Kwun, Soon-Kuk
    • Journal of Korean Society on Water Environment
    • /
    • v.20 no.5
    • /
    • pp.473-479
    • /
    • 2004
  • A sedimentation basin (SB) at the inlet of an irrigation reservoir which was constructed using an auxiliary dam was monitored to evaluate its pollutant removal efficiency. Water sampling at three points, i.e., inflow stream, upstream and downstream of the reservoir, were taken 5 times before and after the construction of the SB in 1999 and 2003, respectively. No significant water quality variations in inflow stream were observed during these periods. The COD, T-N, T-P and SS removal efficiencies were 38, 24, 35 and 49%, respectively. The results indicated that those removal efficiencies significantly increased during the rainy season and COD removal efficiency, especially, was higher than others studies. The scale of SB in this study was rational as aspects of pollutant removal efficiency and hydraulic detention time. And it is recommended that SB, at inlet of an reservoir, should be constructed as completely separated structure from reservoir water body and having SAR Index from 0.7% to 1.0%.