• Title/Summary/Keyword: assessment of safety

Search Result 5,533, Processing Time 0.046 seconds

Evaluating the Application of Portable Safety Equipment in Nuclear Power Plants using Multi-unit PSA (다수기 PSA 기반 원자력 발전소 이동형 안전 설비 활용성 평가)

  • Jae Young Yoon;Ho-Gon Lim;Jong Woo Park
    • Journal of the Korean Society of Safety
    • /
    • v.38 no.3
    • /
    • pp.110-120
    • /
    • 2023
  • Following the Fukushima accident, portable equipment employed as accident mitigating systems have been installed and operated to reduce core damage and large early release frequencies. In addition, the establishment of an accident management strategy has gained importance. This study investigated the current status of portable equipment including the international portable equipment FLEX (diverse and flexible coping strategies), and domestic portable equipment multi-barrier accident coping strategy (MACST). Research on optimal utilization of MACST remains insufficient. As a preliminary study for establishing an optimal strategy, sensitivity studies were conducted to facilitate the priority of use on portable equipment, number of portable equipment, and dependency of operator actions based on a multi-unit probabilistic safety assessment model. The results revealed the conditions that reduced the multi-unit and site conditional core damage probabilities, indicating the optimal strategy of MACST. The results of this study can be used as a reference for establishing an optimal strategy that utilizes domestic safety equipment in the future.

Safety Management Information System in Roads Construction Work (도로 건설공사의 안전관리정보시스템 개발)

  • Park, Jong-Keun
    • Journal of the Korean Society of Safety
    • /
    • v.27 no.2
    • /
    • pp.72-77
    • /
    • 2012
  • There are insufficient models that find problems and solutions for accident prevention through risk assessment and suggest safe work process and work instruction from foundation works to finish work for accident decrease. This paper presents a quantitative risk assessment model by analysis of risk factors in each process such as earth works, drainage works, pavement works, appurtenant works and etc based on accident examples and investigation on actual condition in roads construction work. In addition, the safety management system was developed to perform risk assessment of construction and use it for effective safety training for labor.

Urban Flood Regional Safety Assesment Model (도시지역 홍수재해에 대한 지역안전도 평가모형)

  • Lee, Chang-Hee;Lee, Suk-Min;Shin, Sang-Young;Yeo, Chang-Geon;Kim, Youn-Jong
    • 한국방재학회:학술대회논문집
    • /
    • 2007.02a
    • /
    • pp.376-379
    • /
    • 2007
  • In recent years, the natural damage associated with flood disaster has been dramatically increased. However, there is no rational method which reflects urban characteristics to estimate the regional safety assessment for flood disaster. The purpose of this study is to develop the regional safety assesment model for urban flood. Flood risk and reduction assesment were estimated by using the linear sum of the Z score of the assessment factors and the weight value of each factor from the expert survey data. And then the regional safety assessment was estimated by subtracting reduction factor value from risk factor value. GIS tool was used to estimate the factor assesment and integrated regional safety. This study can be used to determine the priority of flood protection project, execute the flood insurance and establish the urban plans and the flood mitigate plan.

  • PDF

Development of logical structure for multi-unit probabilistic safety assessment

  • Lim, Ho-Gon;Kim, Dong-San;Han, Sang Hoon;Yang, Joon Eon
    • Nuclear Engineering and Technology
    • /
    • v.50 no.8
    • /
    • pp.1210-1216
    • /
    • 2018
  • Site or multi-unit (MU) risk assessment has been a major issue in the field of nuclear safety study since the Fukushima accident in 2011. There have been few methods or experiences for MU risk assessment because the Fukushima accident was the first real MU accident and before the accident, there was little expectation of the possibility that an MU accident will occur. In addition to the lack of experience of MU risk assessment, since an MU nuclear power plant site is usually very complex to analyze as a whole, it was considered that a systematic method such as probabilistic safety assessment (PSA) is difficult to apply to MU risk assessment. This paper proposes a new MU risk assessment methodology by using the conventional PSA methodology which is widely used in nuclear power plant risk assessment. The logical failure structure of a site with multiple units is suggested from the definition of site risk, and a decomposition method is applied to identify specific MU failure scenarios.

Occupational Health and Safety Risk Assessment Checklist for Preventing Accidents During Building Design Phase (재해예방을 위한 건축공사 설계단계 안전 위험성 평가 체크리스트)

  • Han, Byoung-Soo;Park, Chan-Sik;Hong, Sung-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.2
    • /
    • pp.68-74
    • /
    • 2007
  • It has been recognized that safety management is activated during the construction phase to prevent accidents and fatalities of workers. However, It is revealed that about 15% of fatal death accidents is caused by the lack of management of planning and design phases. There is a crucial need of assessing safety risk during building design phase. This paper is aimed to develop a safety risk assessment checklist that can be used during building design phase, utilizing the concept of Design for Safety. In doing so, a broad literature survey on safety management of building Process, various safety risk assessment toolboxes being utilized in the HSE and the BAA of UK. The proposed checklist contains the followings: 1) classification structure for safety design on space, element, and trade work 2) hazard risk factor, probability and degree of intensity of accident occurrence, and 3) safety assessment criteria. It is expected that the checklist would be an effective tool of preventing and minimizing fatal accidents of building construction projects.

Derivation of Building Fire Safety Assessment Factors for Generating 3D Safety Status Map (3D 안전상태지도 제작을 위한 건물 화재안전 평가항목 도출)

  • Youn, Junhee;Kim, Taehoon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.10
    • /
    • pp.40-47
    • /
    • 2020
  • Various technologies, systems, and legal systems are applied to prevent and quickly respond to fire disaster; nevertheless, the damages to life and property caused by fires are not reduced every year. For managing fire disaster, generating spatial information-based safety status map and procuring suitability of attribute information for each position information are essential. The safety status map is generated by deriving the fire safety status assessment factors, indexing, and locating the surveying results through various methods. In this paper, we deal with derivation of building fire safety assessment factors for 3D safety status map. At first, we survey the foreign and domestic fire assessment model cases and its factors, and analyze the applicability of Korean 3D fire safety status map. Next, assessment factors for fire safety assessment model are derived. Assessment factors are derived and categorized by their information collecting activity; factors that can be accessed through basic building information and factors that can be accessed through field survey. As a derivation result, 14 assessment factors were derived over five categories(Industry Risk, Structural Risk, Fire Fighting Facility, Fire Dangerousness, Fire Response Status).

A Study on the Awareness of Safety and Health for Practical Application of Risk Assessment in Construction Industries -Focused on Worker- (건설업 위험성평가 실무적 적용을 위한 안전보건 인식도 조사 연구 -근로자를 중심으로-)

  • Choi, Soo Hwan;Oh, Tae Keun
    • Journal of the Korean Society of Safety
    • /
    • v.28 no.2
    • /
    • pp.60-65
    • /
    • 2013
  • On the basis of the guideline "2012-104(2012.9.26.)" notified by the ministry of employment and labor, this paper provided the baseline data and the improvement proposal in applying risk assessment to a construction site by group interview & survey of construction workers. The worker's awareness and action plan of safety and health were investigated by numerical analysis. From the result of group interview and the survey of construction workers, it was found that most of construction workers feel the danger during the work. The results also shows that risk assessment can help to change & raise the awareness of safety and to reduce the industrial disaster. In addition, simple safety management activity such as TBM & active education of safety will be necessary for safe workspace and the active TBT(tool box talk) which combines TBM & the education of safety will be also effective.

A Study on the Processing Method of Reliability Database using 2-Bayes Theory (2-Bayes 이론을 이용한 데이터 처리방법에 관한 연구)

  • Lee, M.S.;Rhie, K.W.;Kim, T.H.;Yoon, I.K.;Oh, Y.D.;Seo, D.H.
    • Journal of the Korean Society of Safety
    • /
    • v.24 no.6
    • /
    • pp.144-149
    • /
    • 2009
  • The safety assessment for facility industry is now being periodically performed in Korea. For the purpose of scientific safety management, QRA(Quantitative Risk Assessment) is also being performed, and reliability data of the facilities is essential to perform the assessment. The necessary reliability data for QRA have been generally announced the values in other process industries, which results in the drop of risk reliability. The most appropriate method is to perform a direct reliability analysis towards the facilities undergoing safety assessment. In this study, the distinction between homogeneous sample estimation and multi-sample estimation of reliability data clarify using 2-Bayes theory.

A Study on Reduction of Hazard Conditions on Plant Work of Steel Industry (철강 제조업의 플랜트 공사 중 유해.위험 저감 방안)

  • Seo, Seong-Hwa;Weon, Jong-Il;Woo, Heung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.13 no.4
    • /
    • pp.61-69
    • /
    • 2011
  • The hazard conditions on plant works of the steel industry have been investigated to efficiently prevent from industrial accidents. The plant works are eventually carried out by workers of smaller service companies where the safety management systems are not well established, on behalf of the main steel company. Based on the preliminary risk assessment on the plant working and open literature reviews, the safety management systems, which can be applied to the plant workplace of each process, are studied and then the step-by-step 4M check-list method is established. Accordingly, the risk assessment technique using 4M checklist for the plant workplace is proposed. In addition, a standardized flow-chart for safety management of plant work is introduced. These risk assessment technique and flow-chart can definitely contribute to the reduction of industrial accidents, considering the risk characterization and the unsafe conditions in small and medium-sized plant workplace, as effective safety management tools and safety guide line.

Research on Risk Assessment of Lithium-ion Battery Manufacturing Process Considering Cell Materials (셀소재를 고려한 리튬2차전지 제조공정 위험성 평가 방법 연구)

  • Kim, Taehoon
    • Journal of the Korean Society of Safety
    • /
    • v.37 no.2
    • /
    • pp.76-87
    • /
    • 2022
  • Lithium-ion batteries (LIBs) have attracted much interest for their high energy density (>150 mAh/g), high capacity, low self-discharge rate, and high coulombic efficiency. However, with the successful commercialization of LIBs, fire and explosion incidents are likely to increase. The thermal runaway is known as the major factor in battery-related accidents that can lead to a series of critical conditions. Considering this, recent studies have shown an increased interest in countering the safety issues associated with LIBs. Although safety standards for LIB use have recently been formulated, little attention has been paid to the safety around the manufacturing process for battery products. The present study introduces a risk assessment method suitable for assessing the safety of the LIB-manufacturing process. In the assessment method, a compensation parameter (Z-factor) is employed to correctly evaluate the process's safety on the basis of the type of material (e.g., metal anode, liquid electrolyte, solid-state electrolytes) utilized in a cell. The proposed method has been applied to an 18650 cell-manufacturing process, and three sub-processes have been identified as possibly vulnerable parts (risk index: >4). This study offers some crucial insights into the establishment of safety standards for battery-manufacturing processes.