Heuristic Procedure on Minimizing Makespan for Preemptive Sequence Dependent Job Scheduling with Parallel Identical Machines (일시(一時) 작업중단(作業中斷)을 허용(許容)하는 순서종속작업(順序從屬作業)을 병행기계(並行機械)로서 makespan 최소화(最小化)를 도모(圖謀)하는 발견적(發見的) 방법(方法))
-
- Journal of Korean Institute of Industrial Engineers
- /
- v.13 no.2
- /
- pp.35-46
- /
- 1987